79 resultados para BPR
Resumo:
Background. A review of the literature suggests that Hypertension (HTN) in older adults is associated with sympathetic stimulation that results in increasing blood pressure (BP) reactivity. If clinical assessment of BP captured sympathetic stimulation, it would be valuable for hypertension management. ^ Objectives. The study examined whether reactive change scores from a short BPR protocol, resting blood pressure (BP), or resting pulse pressure (PP) is a better predictor of 24 hour ambulatory BP and BP load in cardiac patients. ^ Method. The study used a single-group design, with both an experimental clinical component and an observational field component. Both components used repeated measurement methods. The study population consisted of 45 adult patients with a mean age of 64.6 ± 8.5 years who were diagnosed with cardiac disease and who were taking anti-hypertensive medication. Blood pressure reactivity was operationalized with a speech protocol. During the speech protocol, BP was measured with an automatic device (Dinamap 825XT) while subjects talked about their health and about their usual day. Twenty-four hour ambulatory BP measurement (Spacelabs 90207 monitor) followed the speech protocol. ^ Results. Resting SBP and resting PP were significant predictors of 24-hour SBP, and resting SBP was a significant predictor of SBP load. No predictors were significant of 24-hour DBP or DBP load. ^ Conclusions. Initial resting BP and PP may be used in clinical settings to assess hypertension management. Future studies are necessary to confirm the ability of resting BP to predict ABP and BP load in older, medicated hypertensives. ^
Resumo:
Cover title: Electronic computer program for hydraulics of bridge waterways (BPR program HY-4)
Resumo:
Errata sheet inserted.
Resumo:
Cover title.: Electronic computer program for flood record compilation and frequency plot (BPR program HY-5) Developed by: U. S. Dept. of Commerce, Bureau of Public Roads.
Resumo:
The materials management function is always a major concern to the management of any organisation as high inventory and inefficient procurement processes have a significant effect on profitability. The problems multiply in the face of a very dynamic business environment, as is the present case in India. Hence, the existing system of materials planning, procurement processes and inventory management require reviewing with respect to the changed business environment. This study shows a radical improvement in materials procurement function of an Indian petroleum refinery through Business Process Reengineering (BPR) by analysing current process, identifying key issues, deriving paradigm shifts and developing reengineered processes through customer value analysis. BPR has been carried out on existing processes of 'material planning and procurement' and 'warehousing and surplus disposal'. The reengineered processes for the materials management function triggered several improvement projects that were identified by the group of executives who took part in the reengineering exercise. Those projects were implemented in an integrated framework, with the application of state of the art information technology tools and building partnership alliance among all stakeholders. Considerable improvements in overall functions of the organisation are observed, along with financial benefits. Copyright © 2006 Inderscience Enterprises Ltd.
Resumo:
Materials management function is always a major concern to the management of any industrial organisation as high inventory and an inefficient procurement process affect the profitability to a great extent. Problems multiply due to a very current business environment in India. Hence, existing materials planning and procurement processes and inventory management systems require a re-look with respect to a changing business environment. This study shows a radical improvement in materials management function of an Indian petroleum refinery through business process re-engineering (BPR) by analysing current processes, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on existing processes of “materials planning and procurement” and “warehousing and surplus disposal”. The re-engineered processes for materials management function trigger a few improvement projects that were identified by the group of executives who took part in the re-engineering exercise. Those projects were implemented in an integrated framework with the application of the state of art information technology tools.
Resumo:
Simulation modelling has been used for many years in the manufacturing sector but has now become a mainstream tool in business situations. This is partly because of the popularity of business process re-engineering (BPR) and other process based improvement methods that use simulation to help analyse changes in process design. This textbook includes case studies in both manufacturing and service situations to demonstrate the usefulness of the approach. A further reason for the increasing popularity of the technique is the development of business orientated and user-friendly Windows-based software. This text provides a guide to the use of ARENA, SIMUL8 and WITNESS simulation software systems that are widely used in industry and available to students. Overall this text provides a practical guide to building and implementing the results from a simulation model. All the steps in a typical simulation study are covered including data collection, input data modelling and experimentation.
Resumo:
This paper discusses three major areas of knowledge; business process reengineering (BPR), soft systems methodology (SSM) and concurrent engineering (CE) to demonstrate that their philosophies are complementary. An example is given depicting how a manufacturing resource planning system is set up and how improvements can be achieved by applying CE best practice.
Resumo:
The research investigates the past, present and potential future role of Information Specialists (ISps) in process oriented companies. It tests the proposition that ISps in companies that have undertaken formal process reengineering exercises are likely to become more proactive and more business oriented (as opposed to technically oriented) than they had previously been when their organisations were organised along traditional, functional lines. A review of existing literature in the area of Business Process Reengineering and Information Management reveals a lack of consensus amongst researchers concerning the appropriate role for ISps during and after BPR. Opinion is divided as to whether IS professionals should reactively support BPR or whether IT/IS developments should be driving these initiatives. A questionnaire based ‘Descriptive Survey’ with 60 respondents is used as a first stage of primary data gathering. This is followed by follow-up interviews with 20 of the participating organisations to gather further information on their experiences. The final stage of data collection consists of further in-depth interview with four case study companies to provide an even richer picture of their experiences. The results of the questionnaire are analysed and displayed in the form of simple means, frequencies and bar graphs. The ‘NU-DIST’ computer based discourse analysis package was tried in relation to summarising the interview findings, but this proved cumbersome and a visual collation method is preferred. Overall, the researcher contends that the supposition outlined above is proven, and she concludes the research by suggesting the implications of these findings. In particular she offers a ‘Framework for Understanding and Action’ which is deemed to be relevant to both practitioners and future researchers.
Resumo:
The materials management function is always a major concern to management of any industrial organization, since high inventory and an inefficient procurement process significantly affect profitability. Problems multiply due to the current dynamic business environment in many countries. Hence, existing materials planning and procurement process and inventory management systems require a review. This article shows a radical improvement in the materials management function for an Indian petroleum refinery through business process re-engineering (BPR) by analyzing the current process, identifying key issues, deriving paradigm shifts and developing re-engineered processes through customer value analysis. BPR has been carried out on the existing processes of "material planning and procurement" and "warehousing and surplus disposal.
Resumo:
Time, cost and quality are the prime objectives of any project. Unfortunately, today’s project management does not always ensure the realisation of these objectives. The main reasons of project non-achievement are changes in scope and design, changes in Government policies and regulations, unforeseen inflation, under-estimation and mis-estimation. An overall organisational approach with the application of appropriate management philosophies, tools and techniques can only solve the problem. The present study establishes a methodology for achieving success in implementing projects using a business process re-engineering (BPR) framework. Internal performance characteristics are introspected through condition diagnosis that identifies and prioritises areas of concern requiring attention. Process re-engineering emerges as a most critical area for immediate attention. Project process re-engineering is carried out by eliminating non-value added activities, taking up activities concurrently by applying information systems rigorously and applying risk management techniques throughout the project life cycle. The overall methodology is demonstrated through applications to cross country petroleum pipeline project organisation in an Indian scenario.
Resumo:
The standard highway assignment model in the Florida Standard Urban Transportation Modeling Structure (FSUTMS) is based on the equilibrium traffic assignment method. This method involves running several iterations of all-or-nothing capacity-restraint assignment with an adjustment of travel time to reflect delays encountered in the associated iteration. The iterative link time adjustment process is accomplished through the Bureau of Public Roads (BPR) volume-delay equation. Since FSUTMS' traffic assignment procedure outputs daily volumes, and the input capacities are given in hourly volumes, it is necessary to convert the hourly capacities to their daily equivalents when computing the volume-to-capacity ratios used in the BPR function. The conversion is accomplished by dividing the hourly capacity by a factor called the peak-to-daily ratio, or referred to as CONFAC in FSUTMS. The ratio is computed as the highest hourly volume of a day divided by the corresponding total daily volume. ^ While several studies have indicated that CONFAC is a decreasing function of the level of congestion, a constant value is used for each facility type in the current version of FSUTMS. This ignores the different congestion level associated with each roadway and is believed to be one of the culprits of traffic assignment errors. Traffic counts data from across the state of Florida were used to calibrate CONFACs as a function of a congestion measure using the weighted least squares method. The calibrated functions were then implemented in FSUTMS through a procedure that takes advantage of the iterative nature of FSUTMS' equilibrium assignment method. ^ The assignment results based on constant and variable CONFACs were then compared against the ground counts for three selected networks. It was found that the accuracy from the two assignments was not significantly different, that the hypothesized improvement in assignment results from the variable CONFAC model was not empirically evident. It was recognized that many other factors beyond the scope and control of this study could contribute to this finding. It was recommended that further studies focus on the use of the variable CONFAC model with recalibrated parameters for the BPR function and/or with other forms of volume-delay functions. ^
Resumo:
This research aimed at developing a research framework for the emerging field of enterprise systems engineering (ESE). The framework consists of an ESE definition, an ESE classification scheme, and an ESE process. This study views an enterprise as a system that creates value for its customers. Thus, developing the framework made use of system theory and IDEF methodologies. This study defined ESE as an engineering discipline that develops and applies systems theory and engineering techniques to specification, analysis, design, and implementation of an enterprise for its life cycle. The proposed ESE classification scheme breaks down an enterprise system into four elements. They are work, resources, decision, and information. Each enterprise element is specified with four system facets: strategy, competency, capacity, and structure. Each element-facet combination is subject to the engineering process of specification, analysis, design, and implementation, to achieve its pre-specified performance with respect to cost, time, quality, and benefit to the enterprise. This framework is intended for identifying research voids in the ESE discipline. It also helps to apply engineering and systems tools to this emerging field. It harnesses the relationships among various enterprise aspects and bridges the gap between engineering and management practices in an enterprise. The proposed ESE process is generic. It consists of a hierarchy of engineering activities presented in an IDEF0 model. Each activity is defined with its input, output, constraints, and mechanisms. The output of an ESE effort can be a partial or whole enterprise system design for its physical, managerial, and/or informational layers. The proposed ESE process is applicable to a new enterprise system design or an engineering change in an existing system. The long-term goal of this study aims at development of a scientific foundation for ESE research and development.
Resumo:
O mercado atual das instituições do ensino superior (IES) é caraterizado pela forte concorrência, o que chama a estas instituições uma necessidade de serem cada vez mais eficazes, oferecendo melhores serviços sem ter que desperdiçar os recursos cada vez mais escassos. A reengenharia de processos de negócios (BPR) oferece às instituições do ensino superior a possibilidade de repensarem os seus processos, eliminando as ineficiências dos serviços prestados à sua comunidade académica e serem cada vez mais competitivas ao nível de qualidade e preço. Este estudo tem como objetivo caraterizar os processos, a sua importância, o tempo despendido na realização destes processos e saber as possibilidades de automatização dos processos ou se o processo pode ser realizado por um colaborador administrativo com vista à reengenharia. Concentramos o nosso estudo na coordenação dos cursos da Escola Superior da Tecnologia e Gestão (ESTG) porque a coordenação dos cursos são a espinha dorsal da ESTG Leiria. Foi realizado uma revisão da literatura sobre o conceito de Processos, a sua importância e as diferentes formas de os descrever e ainda abordámos o conceito da reengenharia de processos, os desafios a que se propõe e a reengenharia de processos nas instituições do ensino superior. Foram realizados dois inquéritos aos 29 coordenadores dos cursos da ESTG Leiria, entre os quais 16 licenciaturas e 13 mestrados, onde se obteve, no primeiro, 15 respostas válidas e no segundo 14 respostas válidas. A metodologia utilizada é o estudo de caso; podemos ver que esta metodologia traz resultados, permitindo constatar, neste estudo, que é possível reduzir o número de horas despendidas para a realização dos processos de coordenação dos cursos, que alguns processos podem ser automatizados e também que existem processos de coordenação dos cursos que podem ser realizados pelos colaboradores administrativos
Resumo:
This article considers the opportunities of civilians to peacefully resist violent conflicts or civil wars. The argument developed here is based on a field-based research on the peace community San José de Apartadó in Colombia. The analytical and theoretical framework, which delimits the use of the term ‘resistance’ in this article, builds on the conceptual considerations of Hollander and Einwohner (2004) and on the theoretical concept of ‘rightful resistance’ developed by O’Brien (1996). Beginning with a conflict-analytical classification of the case study, we will describe the long-term socio-historical processes and the organizational experiences of the civilian population, which favoured the emergence of this resistance initiative. The analytical approach to the dimensions and aims of the resistance of this peace community leads to the differentiation of O`Brian’s concept of ‘rightful resistance’.