849 resultados para BIM (Building Information Modeling)
Resumo:
Increased focus on energy cost savings and carbon footprint reduction efforts improved the visibility of building energy simulation, which became a mandatory requirement of several building rating systems. Despite developments in building energy simulation algorithms and user interfaces, there are some major challenges associated with building energy simulation; an important one is the computational demands and processing time. In this paper, we analyze the opportunities and challenges associated with this topic while executing a set of 275 parametric energy models simultaneously in EnergyPlus using a High Performance Computing (HPC) cluster. Successful parallel computing implementation of building energy simulations will not only improve the time necessary to get the results and enable scenario development for different design considerations, but also might enable Dynamic-Building Information Modeling (BIM) integration and near real-time decision-making. This paper concludes with the discussions on future directions and opportunities associated with building energy modeling simulations.
Resumo:
Successful management of design changes is critical for the efficient delivery of construction projects. Building Information Modeling (BIM) is envisioned to play an important role in integrating design, construction and facility management processes through coordinated changes throughout the project life-cycle. BIM currently provides significant benefits in coordinating changes across different views in a single model, and identifying conflicts between different discipline-specific models. However, current BIM tools provide limited support in managing changes across several discipline-specific models. This paper describes an approach to represent, coordinate, and track changes within a collaborative multi-disciplinary BIM environment. This approach was informed by a detailed case study of a large, complex, fast-tracked BIM project where we investigated numerous design changes, analyzed change management processes, and evaluated existing BIM tools. Our approach characterises design changes in an ontology to represent changed component attributes, dependencies between components, and change impacts. It explores different types of dependencies amongst different design changes and describes how a graph based approach and dependency matrix could assist with automating the propagation and impact of changes in a BIM-based project delivery process.
Resumo:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
Resumo:
The goal of the single building information model has existed for at least thirty years and various standards have been published leading up to the ten-year development of the Industry Foundation Classes. These have been initiatives from researchers, software developers and standards committees. Now large property owners are becoming aware of the benefits of moving IT tools from specific applications towards more comprehensive solutions. This study addresses the state of Building Information Models and the conditions necessary for them to become more widely used. It is a qualitative study based on information from a number of international experts and has asked a series of questions about the feasibility of BIMs, the conditions necessary for their success, and the role of standards with particular reference to the IFCs. Some key statements were distilled from the diverse answers received and indicate that BIM solutions appear too complex for many and may need to be applied in limited areas initially. Standards are generally supported but not applied rigorously and a range of these are relevant to BIM. Benefits will depend upon the building procurement methods used and there should be special roles within the project team to manage information. Case studies are starting to appear and these could be used for publicity. The IFCs are rather oversold and their complexities should be hidden within simple-to-use software. Inevitably major questions remain and property owners may be the key to answering some of these. A framework for presenting standards, backed up by case studies of successful projects, is the solution proposed to provide better information on where particular BIM standards and solutions should be applied in building projects.
Resumo:
Building Information Modelling (BIM) is growing in pace, not only in design and construction stages, but also in the analysis of facilities throughout their life cycle. With this continued growth and utilisation of BIM processes, comes the possibility to adopt such procedures, to accurately measure the energy efficiency of buildings, to accurately estimate their energy usage. To this end, the aim of this research is to investigate if the introduction of BIM Energy Performance Assessment in the form of software analysis, provides accurate results, when compared with actual energy consumption recorded. Through selective sampling, three domestic case studies are scrutinised, with baseline figures taken from existing energy providers, the results scrutinised and compared with calculations provided from two separate BIM energy analysis software packages. Of the numerous software packages available, criterion sampling is used to select two of the most prominent platforms available on the market today. The two packages selected for scrutiny are Integrated Environmental Solutions - Virtual Environment (IES-VE) and Green Building Studio (GBS). The results indicate that IES-VE estimated the energy use in region of ±8% in two out of three case studies while GBS estimated usage approximately ±5%. The findings indicate that the introduction of BIM energy performance assessment, using proprietary software analysis, is a viable alternative to manual calculations of building energy use, mainly due to the accuracy and speed of assessing, even the most complex models. Given the surge in accurate and detailed BIM models and the importance placed on the continued monitoring and control of buildings energy use within today’s environmentally conscious society, this provides an alternative means by which to accurately assess a buildings energy usage, in a quick and cost effective manner.
Resumo:
Este relatório apresenta o estágio curricular relativo ao curso de mestrado em engenharia civil na área de especialização de estruturas. O estágio decorreu no grupo O Feliz, S.A, uma metalomecânica sedeada em Braga. No âmbito do estágio, foi efetuada uma pesquisa e de seguida um projeto real aplicando a metodologia Building Information Modeling. Inicialmente, será feita uma apresentação da empresa e definidos os objetivos propostos para o estágio. Seguidamente, será apresentada toda a pesquisa realizada sobre o BIM para poder, seguidamente, realizar um projeto real utilizando esta metodologia, proposta pela empresa. Posteriormente é apresentado o projeto realizado com a metodologia BIM e todo o seu processo até chegar à sua construção. Por último, são apresentadas algumas das obras que estavam em curso durante a realização do presente trabalho e que houve a oportunidade de acompanhar, refletindo a experiência adquirida na área, durante o desenvolvimento do estágio.
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia Eletrotécnica e Computadores
Resumo:
Facility management (FM), from a service oriented approach, addresses the functions and requirements of different services such as energy management, space planning and security service. Different service requires different information to meet the needs arising from the service. Object-based Building Information Modelling (BIM) is limited to support FM services; though this technology is able to generate 3D models that semantically represent facility’s information dynamically over the lifecycle of a building. This paper presents a semiotics-inspired framework to extend BIM from a service-oriented perspective. The extended BIM, which specifies FM services and required information, will be able to express building service information in the right format for the right purposes. The service oriented approach concerns pragmatic aspect of building’s information beyond semantic level. The pragmatics defines and provides context for utilisation of building’s information. Semiotics theory adopted in this paper is to address pragmatic issues of utilisation of BIM for FM services.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.
Resumo:
Consecrated in 1297 as the monastery church of the four years earlier founded St. Catherine’s monastery, the Gothic Church of St. Catherine was largely destroyed in a devastating bombing raid on January 2nd 1945. To counteract the process of disintegration, the departments of geo-information and lower monument protection authority of the City of Nuremburg decided to getting done a three dimensional building model of the Church of St. Catherine’s. A heterogeneous set of data was used for preparation of a parametric architectural model. In effect the modeling of historic buildings can profit from the so called BIM method (Building Information Modeling), as the necessary structuring of the basic data renders it into very sustainable information. The resulting model is perfectly suited to deliver a vivid impression of the interior and exterior of this former mendicant orders’ church to present observers.
Resumo:
Construction customers are persistently seeking to achieve sustainability and maximize value as sustainability has become a major consideration in the construction industry. In particular, it is essential to refurbish a whole house to achieve the sustainability agenda of 80% CO2 reduction by 2050 as the housing sector accounts for 28% of the total UK CO2 emission. However, whole house refurbishment seems to be challenging due to the highly fragmented nature of construction practice, which makes the integration of diverse information throughout the project lifecycle difficult. Consequently, Building Information Modeling (BIM) is becoming increasingly difficult to ignore in order to manage construction projects in a collaborative manner, although the current uptake of the housing sector is low at 25%. This research aims to investigate homeowners’ decision making factors for housing refurbishment projects and to provide a valuable dataset as an essential input to BIM for such projects. One-hundred and twelve homeowners and 39 construction professionals involved in UK housing refurbishment were surveyed. It was revealed that homeowners value initial cost more while construction professionals value thermal performance. The results supported that homeowners and professionals both considered the first priority to be roof refurbishment. This research revealed that BIM requires a proper BIM dataset and objects for housing refurbishment.
Resumo:
The UK government aims at achieving 80% CO2 emission reduction by 2050 which requires collective efforts across all the UK industry sectors. In particular, the housing sector has a large potential to contribute to achieving the aim because the housing sector alone accounts for 27% of the total UK CO2 emission, and furthermore, 87% of the housing which is responsible for current 27% CO2 emission will still stand in 2050. Therefore, it is essential to improve energy efficiency of existing housing stock built with low energy efficiency standard. In order for this, a whole‐house needs to be refurbished in a sustainable way by considering the life time financial and environmental impacts of a refurbished house. However, the current refurbishment process seems to be challenging to generate a financially and environmentally affordable refurbishment solution due to the highly fragmented nature of refurbishment practice and a lack of knowledge and skills about whole‐house refurbishment in the construction industry. In order to generate an affordable refurbishment solution, diverse information regarding costs and environmental impacts of refurbishment measures and materials should be collected and integrated in right sequences throughout the refurbishment project life cycle among key project stakeholders. Consequently, various researchers increasingly study a way of utilizing Building Information Modelling (BIM) to tackle current problems in the construction industry because BIM can support construction professionals to manage construction projects in a collaborative manner by integrating diverse information, and to determine the best refurbishment solution among various alternatives by calculating the life cycle costs and lifetime CO2 performance of a refurbishment solution. Despite the capability of BIM, the BIM adoption rate is low with 25% in the housing sector and it has been rarely studied about a way of using BIM for housing refurbishment projects. Therefore, this research aims to develop a BIM framework to formulate a financially and environmentally affordable whole‐house refurbishment solution based on the Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) methods simultaneously. In order to achieve the aim, a BIM feasibility study was conducted as a pilot study to examine whether BIM is suitable for housing refurbishment, and a BIM framework was developed based on the grounded theory because there was no precedent research. After the development of a BIM framework, this framework was examined by a hypothetical case study using BIM input data collected from questionnaire survey regarding homeowners’ preferences for housing refurbishment. Finally, validation of the BIM framework was conducted among academics and professionals by providing the BIM framework and a formulated refurbishment solution based on the LCC and LCA studies through the framework. As a result, BIM was identified as suitable for housing refurbishment as a management tool, and it is timely for developing the BIM framework. The BIM framework with seven project stages was developed to formulate an affordable refurbishment solution. Through the case study, the Building Regulation is identified as the most affordable energy efficiency standard which renders the best LCC and LCA results when it is applied for whole‐house refurbishment solution. In addition, the Fabric Energy Efficiency Standard (FEES) is recommended when customers are willing to adopt high energy standard, and the maximum 60% of CO2 emissions can be reduced through whole‐house fabric refurbishment with the FEES. Furthermore, limitations and challenges to fully utilize BIM framework for housing refurbishment were revealed such as a lack of BIM objects with proper cost and environmental information, limited interoperability between different BIM software and limited information of LCC and LCA datasets in BIM system. Finally, the BIM framework was validated as suitable for housing refurbishment projects, and reviewers commented that the framework can be more practical if a specific BIM library for housing refurbishment with proper LCC and LCA datasets is developed. This research is expected to provide a systematic way of formulating a refurbishment solution using BIM, and to become a basis for further research on BIM for the housing sector to resolve the current limitations and challenges. Future research should enhance the BIM framework by developing more detailed process map and develop BIM objects with proper LCC and LCA Information.
Resumo:
This paper aims to present a state-of-the-art review of the scope and practical implications of the Building Information Modelling (BIM) platform in the UK construction practice. Theoretical developments suggest that BIM is an integration of both product and process innovation, not just a disparate set of software tools. BIM provides effective collaboration, visual representation and data management, which enable the smooth flow of information throughout the project’s lifecycle. The most frequently reported benefits are related to Capital Cost (capex) and Operational costs (opex) and time savings. Key challenges, however, focus on the interoperability of software, capital installation costs, in-house experience, client preference and cultural issues within design teams and within the organisation. The paper concludes with a critical commentary on the changing roles and a process required to implement BIM in UK construction projects, and suggests areas for further research.
Resumo:
Dissertação (mestrado)—Universidade de Brasília, Faculdade de Tecnologia, Departamento de Engenharia Civil e Ambiental, 2016.
Resumo:
Building Information Modeling (BIM) concept is able to reshape each AEC project and the industry in general, offering a comprehensive collaboration process over a model of structure with regularly actualized and synchronized information. This report presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders through four case studies carried out during the internship in the engineering office NEWTON - Engineering Consultancy Company. The aim of the four cases studies was to cover multidisciplinary and varied projects. The first case study highlights the engineering project’s workflow and presents a comparison of traditional procedures and BIM concepts applied on the rehabilitation of an existing building. In the second and third case study, attention is focused on the goals achieved, particularly by structural engineer, due to the implementation of the mentioned technology on a full-lifecycle BIM project of a small residence and a complex project of residential building in Porto and on its architectural integration. In addition, through the fourth case study, the spatial coordination of Mechanical, Electrical and Plumbing (MEP) systems at a large-scale hotel project has been analyzed and accomplished, highlighting merits of BIM at this project stage. Through a reduction of the space used for facilities and infrastructures and the ability to identify conflicts and to nullify the related costs, its advantage for a complex building was proved.