990 resultados para Amalteo, Pomponio, 1505-1588.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On reel 167 beginning frame no. 1004.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

tomus 1. Ab anno 1588 ad annum 1698 -- tomus 2. Ab anno 1700 ad annum 1798.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Includes bibliographical references and indexes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A provisional chronological list of the works comprising this controversy": p. [197]-200.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Em meados do século XII, o bispado de Viseu era constituído por um território de extensão considerável situado a pouca distância da então fronteira Sul do Reino de Portugal. Nesta centúria, porém, as fronteiras diocesanas ainda não se tinham conformado. Com efeito, só em 1258 o poder episcopal, após contenda judicial com o bispo de Idanha, obteve jurisdição sobre Castelo Mendo, em detrimento das igrejas da Guarda e Jarmelo. Dois anos volvidos, em 1260, foram regulamentados os direitos episcopais das nove igrejas de Pinhel. Anos antes, em 1230, o bispo D. Gil estabeleceu um acordo com a Ordem do Templo sobre os proventos eclesiásticos da igreja de Santiago de Trancoso.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

IEC 61850 Process Bus technology has the potential to improve cost, performance and reliability of substation design. Substantial costs associated with copper wiring (designing, documentation, construction, commissioning and troubleshooting) can be reduced with the application of digital Process Bus technology, especially those based upon international standards. An IEC 61850-9-2 based sampled value Process Bus is an enabling technology for the application of Non-Conventional Instrument Transformers (NCIT). Retaining the output of the NCIT in its native digital form, rather than conversion to an analogue output, allows for improved transient performance, dynamic range, safety, reliability and reduced cost. In this paper we report on a pilot installation using NCITs communicating across a switched Ethernet network using the UCAIug Implementation Guideline for IEC 61850-9-2 (9-2 Light Edition or 9-2LE). This system was commissioned in a 275 kV Line Reactor bay at Powerlink Queensland’s Braemar substation in 2009, with sampled value protection IEDs 'shadowing' the existing protection system. The results of commissioning tests and twelve months of service experience using a Fibre Optic Current Transformer (FOCT) from Smart Digital Optics (SDO) are presented, including the response of the system to fault conditions. A number of remaining issues to be resolved to enable wide-scale deployment of NCITs and IEC 61850-9-2 Process Bus technology are also discussed.