999 resultados para 671102 Rail equipment


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintenance trains travel in convoy. In Australia, only the first train of the convoy pays attention to the track sig- nalization (the other convoy vehicles simply follow the preceding vehicle). Because of human errors, collisions can happen between the maintenance vehicles. Although an anti-collision system based on a laser distance meter is already in operation, the existing system has a limited range due to the curvature of the tracks. In this paper, we introduce an anti-collision system based on vision. The two main ideas are, (1) to warp the camera image into an image where the rails are parallel through a projective transform, and (2) to track the two rail curves simultaneously by evaluating small parallel segments. The performance of the system is demonstrated on an image dataset.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Robustness of the track allocation problem is rarely addressed in literatures and the obtained track allocation schemes (TAS) embody some bottlenecks. Therefore, an approach to detect bottlenecks is needed to support local optimization. First a TAS is transformed to an executable model by Petri nets. Then disturbances analysis is performed using the model and the indicators of the total trains' departure delays are collected to detect bottlenecks when each train suffers a disturbance. Finally, the results of the tests based on a rail hub linking six lines and a TAS about thirty minutes show that the minimum buffer time is 21 seconds and there are two bottlenecks where the buffer times are 57 and 44 seconds respectively, and it indicates that the bottlenecks do not certainly locate at the area where there is minimum buffer time. The proposed approach can further support selection of multi schemes and robustness optimization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Condition monitoring on rails and train wheels is vitally important to the railway asset management and the rail-wheel interactions provide the crucial information of the health state of both rails and wheels. Continuous and remote monitoring is always a preference for operators. With a new generation of strain sensing devices in Fibre Bragg Grating (FBG) sensors, this study explores the possibility of continuous monitoring of the health state of the rails; and investigates the required signal processing techniques and their limitations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fibre Bragg Grating (FBG) sensors have been installed along an existing line for the purposes of train detection and weight measurement. The results show fair accuracy and high resolution on the vertical force acted on track when the train wheels are rolling upon. While the sensors are already in place and data is available, further applications beyond train detection are explored. This study presents the analysis on the unique signatures from the data collected to characterise wheel-rail interaction for rail defect detection. Focus of this first stage of work is placed on the repeatability of signals from the same wheel-rail interactions while the rail is in healthy state. Discussions on the preliminary results and hence the feasibility of this condition monitoring application, as well as technical issues to be addressed in practice, are given.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Due to an ever increasing demand for more frequent and higher volume of train service, the physical conditions of tracks in modem railways are deteriorating more quickly when compared to tracks built decades ago. There are incidences in both the UK and Hong Kong indicating there are needs for a more stringent checks on the rail conditions using suitable and effective non-invasive and nondestructive condition monitoring system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Flat Bed Rail Wagon (FBRW) has been proposed as an alternative solution for replacing bridges on low traffic volume roads. The subject matter for this paper is to investigate the impediment to load transfer from cross girders to main girder, through visually identifiable structural flaws. Namely, the effect of having large openings at close proximity to the connection of the main girder to the cross girder of a FBRW was examined. It was clear that openings locally reduce the section modulus of the secondary members; however it was unclear how these reductions would affect the load transfer to the main girder. The results are presented through modeling grillage action for which the loads applied onto the FBRW were distributed through cross girders to the main girder.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite the global financial downturn, the Australian rail industry is in a period of expansion. Reports indicate that the industry is not attracting sufficient entry level and mid-career engineers and skilled technicians from within the Australian labour market and is facing widespread retirements from an ageing workforce. This paper reports on a completed qualitative study that explores the perceptions of engineering students, their lecturers, careers advisors and recruitment consultants regarding rail as a brand and of careers in the rail industry. Findings are presented about career knowledge, job characteristic preferences, branding and image and indicate that rail as a brand has a dated image, that young people and their influencers have little knowledge of rail careers and that rail could better focus its image and recruitment strategies. Conclusions include suggestions for more effective attraction and image strategies for the industry and for further research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A finite element numerical simulation is carried out to examine stress distributions on railhead in the cicinity of the endpost of an insulated rail joint. The contact patch and pressure distribution are considered using modified Hertzian simulation. A combined elasto-plastic material modelling available in Abaqus is employed in the simulation. A dynamic load factor of 1.21 is considered in modelling for the wheel load based on a previous study as part of this on going research. Shakedown theorem is employed in this study. A peak pressure load which is above the shakedown limit is determined as input load. As a result, a progressive damage in the railhead has been captured as depicted in the equivalent plastic strain plot.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses major obstacles for the adoption of low cost level crossing warning devices (LCLCWDs) in Australia and reviews those trialed in Australia and internationally. The argument for the use of LCLCWDs is that for a given investment, more passive level crossings can be treated, therefore increasing safety benefits across the rail network. This approach, in theory, reduces risk across the network by utilizing a combination of low-cost and conventional level crossing interventions, similar to what is done in the road environment. This paper concludes that in order to determine if this approach can produce better safety outcomes than the current approach, involving the incremental upgrade of level crossings with conventional interventions, it is necessary to perform rigorous risk assessments and cost-benefit analyses of LCLCWDs. Further research is also needed to determine how best to differentiate less reliable LCCLWDs from conventional warning devices through the use of different warning signs and signals. This paper presents a strategy for progressing research and development of LCLCWDs and details how the Cooperative Research Centre (CRC) for Rail Innovation is fulfilling this strategy through the current and future affordable level crossing projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a study on estimating the latent demand for rail transit in Australian context. Based on travel mode-choice modelling, a two-stage analysis approach is proposed, namely market population identification and mode share estimation. A case study is conducted on Midland-Fremantle rail transit corridor in Perth, Western Australia. The required data mainly include journey-to-work trip data from Australian Bureau of Statistics Census 2006 and work-purpose mode-choice model in Perth Strategic Transport Evaluation Model. The market profile is analysed, such as catchment areas, market population, mode shares, mode specific trip distributions and average trip distances. A numerical simulation is performed to test the sensitivity of the transit ridership to the change of fuel price. A corridor-level transit demand function of fuel price is thus obtained and its characteristics of elasticity are discussed. This study explores a viable approach to developing a decision-support tool for the assessment of short-term impacts of policy and operational adjustments on corridor-level demand for rail transit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a preliminary crash avoidance framework for heavy equipment control systems. Safe equipment operation is a major concern on construction sites since fatal on-site injuries are an industry-wide problem. The proposed framework has potential for effecting active safety for equipment operation. The framework contains algorithms for spatial modeling, object tracking, and path planning. Beyond generating spatial models in fractions of seconds, these algorithms can successfully track objects in an environment and produce a collision-free 3D motion trajectory for equipment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A finite element numerical simulation is carried out to examine stress distributions on railhead in the vicinity of the endpost of a insulated rail joint. The contact patch and pressure distribution are considered using modified Hertzian formulation. A combined elasto-plastic material modelling available in Abaqus is employed in the simulation. A dynamic load factor of 1.21 is considered in modelling for the wheel load based on a previous study as part of this on going research. Shakedown theorem is employed in this study. A peak pressure load which is above the shakedown limit is determined as input load. As a result, a progressive damage in the railhead has been captured as depicted in the equivalent plastic strain plot.