964 resultados para "Team building"
Resumo:
This architectural and urban design project was conducted as part of the Brisbane Airport Corporations master-planning Atelier, run in conjunction with City Lab. This creation and innovation event brought together approximately 80 designers, associated professionals, and both local and state government representatives to research concepts for future development and planning of the Brisbane airport site. The Team Delta research project explored the development of a new precinct cluster around the existing international terminal building; with a view of reinforcing the sense of place and arrival. The development zone explores the options of developing a subtropical character through landscape elements such as open plazas, tourist attractions, links to existing adjacent waterways, and localised rapid transport options. The proposal tests the possibilities of developing a cultural hub in conjunction with transport infrastructure and the airport terminal(s).
Creativity in policing: building the necessary skills to solve complex and protracted investigations
Resumo:
Despite an increased focus on proactive policing in recent years, criminal investigation is still perhaps the most important task of any law enforcement agency. As a result, the skills required to carry out a successful investigation or to be an ‘effective detective’ have been subjected to much attention and debate (Smith and Flanagan, 2000; Dean, 2000; Fahsing and Gottschalk, 2008:652). Stelfox (2008:303) states that “The service’s capacity to carry out investigations comprises almost entirely the expertise of investigators.” In this respect, Dean (2000) highlighted the need to profile criminal investigators in order to promote further understanding of the cognitive approaches they take to the process of criminal investigation. As a result of his research, Dean (2000) produced a theoretical framework of criminal investigation, which included four disparate cognitive or ‘thinking styles’. These styles were the ‘Method’, ‘Challenge’, ‘Skill’ and ‘Risk’. While the Method and Challenge styles deal with adherence to Standard Operating Procedures (SOPs) and the internal ‘drive’ that keeps an investigator going, the Skill and Risk styles both tap on the concept of creativity in policing. It is these two latter styles that provide the focus for this paper. This paper presents a brief discussion on Dean’s (2000) Skill and Risk styles before giving an overview of the broader literature on creativity in policing. The potential benefits of a creative approach as well as some hurdles which need to be overcome when proposing the integration of creativity within the policing sector are then discussed. Finally, the paper concludes by proposing further research into Dean’s (2000) skill and risk styles and also by stressing the need for significant changes to the structure and approach of the traditional policing organisation before creativity in policing is given the status it deserves.
Resumo:
This paper describes a capacity building process undertaken within the HIV/AIDS prevention project of the Adventist Development and Relief Agency (ADRA) in the Solomon Islands. ADRA HIV/AIDS has recently reoriented its project structure, moving beyond its awareness raising approach to incorporate health promotion frameworks, theories, strategies and assumptions. These have been used to inform project practice in project planning, delivery and evaluation. This paper shares what has worked and not worked in the capacity building process, including a project evaluation of the initial HIV/AIDS awareness raising project and the application of a number of capacity building strategies, including utilising a volunteer Australian Youth Ambassador for Development (AYAD) funded by the Australian Agency for International Development (AusAID). Existing and new projects are outlined. The underlying theme is that any capacity building exercise must include structural support (e.g. management, national frameworks) to ensure the incorporation of new initiatives and approaches. With time this enables ownership by counterparts and external partnerships to develop. The presence of an AYAD volunteer has been an effective strategy to achieve this. Reflections from the evaluators, the AYAD volunteer and the HIV/AIDS team are included.
Resumo:
Background Failure to convey time-critical information to team members during surgery diminishes members’ perception of the dynamic information relevant to their task, and compromises shared situational awareness. This research reports the dialog around clinical decisions made by team members in the time-pressured and high-risk context of surgery, and the impact of these communications on shared situational awareness. Methods Fieldwork methods were used to capture the dynamic integration of individual and situational elements in surgery that provided the backdrop for clinical decisions. Nineteen semi structured interviews were performed with 24 participants from anaesthesia, surgery, and nursing in the operating rooms of a large metropolitan hospital in Queensland, Australia. Thematic analysis was used. Results: The domain “coordinating decisions in surgery” was generated from textual data. Within this domain, three themes illustrated the dialog of clinical decisions, i.e., synchronizing and strategizing actions, sharing local knowledge, and planning contingency decisions based on priority. Conclusion Strategies used to convey decisions that enhanced shared situational awareness included the use of “self-talk”, closed-loop communications, and “overhearing” conversations that occurred at the operating table. Behaviours’ that compromised a team’s shared situational awareness included tunnelling and fixating on one aspect of the situation.
Resumo:
As a key department within a healthcare organisation, the operating room is a hazardous environment, where the consequences of errors are high, despite the relatively low rates of occurrence. Team performance in surgery is increasingly being considered crucial for a culture of safety. The aim of this study was to describe team communication and the ways it fostered or threatened safety culture in surgery. Ethnography was used, and involved a 6-month fieldwork period of observation and 19 interviews with 24 informants from nursing, anaesthesia and surgery. Data were collected during 2009 in the operating rooms of a tertiary care facility in Queensland, Australia. Through analysis of the textual data, three themes that exemplified teamwork culture in surgery were generated: ‘‘building shared understandings through open communication’’; ‘‘managing contextual stressors in a hierarchical environment’’ and ‘‘intermittent membership influences team performance’’. In creating a safety culture in a healthcare organisation, a team’s optimal performance relies on the open discussion of teamwork and team expectation, and significantly depends on how the organisational culture promotes such discussions.
Resumo:
In this paper, we investigate the ways HRM systems support development of intellectual capital in teams in three case studies of knowledge-intensive firms (KIFs) in Denmark. By focusing on team composition and structure, findings build on the rapidly growing body of literature on HRM’s role in supporting intellectual capital development. Specifically, we make a theoretical contribution to this literature by identifying three distinct ways KIFs develop intellectual capital: 1) through HRM development systems that build relationship-centric team-based intellectual capital by targeting development of social capital; 2) through HRM employee relations systems that build human-centric team based intellectual capital by targeting human capital; 3) through a balanced approach to HRM that builds polycentric team-based intellectual capital through focusing on all aspects of intellectual capital. The findings also have managerial implications regarding the need to align team composition and structure, HRM systems, and intellectual capital focus to support development of team-based intellectual capital.
Resumo:
• Government reports consistently recognise the importance of Primary Health Care to an efficient health system. Barriers identified in Australia’s Primary Health Care include workforce pressures, increase rate of chronic disease, and equitable access to Primary Health Care services. • General Practitioners (GPs) are the key to the successful delivery of Primary Health Care especially in rural and remote regions such as the Wheatbelt region in Western Australia (WA). • The Wheatbelt region of WA is vast: some 72,500 residents spread across 150,000km2 in 43 Local Government Authorities catchments. Majority of the Wheatbelt residents live in small towns. There is a higher reported rates of chronic disease, more at risk of chronic diseases and less utilisation of Primary Health Care services in this region. • General practice patients in the Wheatbelt are among those most in need of Primary Health Care services. • Wheatbelt GP Network (the “Network”) was established in 1998. It is a key health service delivery stakeholder in the Wheatbelt. • The Network has responded to the health needs of the community by creating a mobile Allied Health Team that works closely with GPs and is adaptive to ensure priority needs are met. • The Medicare Local model introduced by the Australian Government in 2011 aimed to improve the delivery of Primary Health Care services by improved health planning and coordinating service delivery. • Little if any recognition has been given to the outstanding work that many Divisions of General Practice have done in improving the delivery of Primary Health Care services such as the Network. • The Network has continued to support GPs and general practices and created a complementary system that integrated general practice with the work of an Allied Health Team. Its program mix is extensive. • The Network has consistently delivered on-required contract outputs and has a fifteen (15) years history of operating successfully in a large geographical area comprising in the main smaller communities that cannot support the traditional health services model. • The complexity of supporting International Medical Graduates in the region requires special attention. • The introduction of the Medicare Local in the South West of WA and their intention to take over the delivery of health services, thus effectively shutting the Network will have catastrophic consequences and cannot be supported economically. • The Network proposes to create a new model, built on its past work that increases the delivery of Primary Health Care services through its current Allied Health Team. • The proposal uses the Wheatbelt GP Super Clinic currently under construction in Northam, part of the Network and funded by the Australian Government is a key to the proposed new model. • Wheatbelt GP Super Clinic is different from existing models of GP Super Clinics around Australia which focus predominately on co-location of services. Wheatbelt GP Super Clinic utilises a hub and spoke model of service outreach to small rural towns to ensure equitable Primary Health Care coverage and continuum of care in a financially responsible and viable manner. In particular, the Wheatbelt GP Super Clinic recognises the importance of Allied Health Professionals and will involve them in a collaborative model with rural general practice. • The proposed model advocated by the Network aims to substitute the South West WA Medicare Local direct service delivery proposed for the Wheatbelt. The Network’s proposed model is to expand on the current hub and spoke model of Primary Health Care delivery to otherwise small unviable Wheatbelt towns. A flexible and adaptive skill mix of Allied Health Professionals, Nurse Practitioners and GPs ensure equitable access to service. Expanded scope of practices are utilised to reduce duplication of service and concentration of services in major towns. This involves a partnership approach. • If the proposed model not funded, the Network and the Wheatbelt region will stand to lose 16 Allied Health Professionals and defeats the purpose of Australian Government current funding for the construction of the Wheatbelt GP Super Clinic. • The Network has considered how its model can best be funded. It proposes a re-allocation of funds made available to the South West WA Medicare Local. • This submission argues that the proposal for the South West WA Medicare Local to take over the service delivery of Primary Health Care services in the Wheatbelt makes no economic sense when an existing agency (the Network) has the infrastructure in place, is experienced in working in this geographical area that has special needs and is capable to expand its programs to meet demand.
Resumo:
Joint venture design teams are formed to combine resources and expertise in order to secure multi-discipline engineering design services on major projects. Bringing together resources from two ordinarily competing companies to form one joint team is however challenging as each parent company brings to the project its own organisational culture, processes and team attitudes. This study examined the factors that impact on forming a successful joint venture project team. Three critical areas were identified from an extensive literature review; Joint Venture Arrangements, Parent Companies and Forming the Team; and a survey was conducted with professionals who have worked in joint venture project teams in the Australian building industry in order to identify factors that affected successful joint venture team formation, and the common lessons learnt. This study reinforced the importance of three key criteria - trust, commitment and compatibility - for partner alignment. The results also identified four key lessons learnt which included; selecting the right resources, enabling a collaborative working environment by way of project office, implementing an independent Joint Venture Manager, and allocating work which is best for project with fees reflecting risk where risk is disproportionate.
Resumo:
This series of research vignettes is aimed at sharing current and interesting research findings from our team of international Entrepreneurship researchers. In this vignette, Alireza Javanmardi Kashan and Kavoos Mohannak considers ‘How do firms develop competitive capabilities within product innovation projects?’
Resumo:
This paper reports on a current initiative at Queensland University of Technology to provide timely, flexible and sustainable training and support to academic staff in blended learning and associated techno-pedagogies via a web-conferencing classroom and collaboration tool, Elluminate Live!. This technology was first introduced to QUT in 2008 as part of the university‘s ongoing commitment to meeting the learning needs of diverse student cohorts. The centralised Learning Design team, in collaboration with the university‘s department of eLearning Services, was given the task of providing training and support to academic staff in the effective use of the technology for teaching and learning, as part of the team‘s ongoing brief to support and enhance the provision of blended learning throughout the university. The resulting program, ―Learning Design Live‖ (LDL) is informed by Rogers‘ theory of innovation and diffusion (2003) and structured according to Wilson‘s framework for faculty development (2007). This paper discusses the program‘s design and structure, considers the program‘s impact on academic capacity in blended learning within the institution, and reflects on future directions for the program and emerging insights into blended learning and participant engagement for both staff and students.
Resumo:
Cost estimating has been acknowledged as a crucial component of construction projects. Depending on available information and project requirements, cost estimates evolve in tandem with project lifecycle stages; conceptualisation, design development, execution and facility management. The premium placed on the accuracy of cost estimates is crucial to producing project tenders and eventually in budget management. Notwithstanding the initial slow pace of its adoption, Building Information Modelling (BIM) has successfully addressed a number of challenges previously characteristic of traditional approaches in the AEC, including poor communication, the prevalence of islands of information and frequent reworks. Therefore, it is conceivable that BIM can be leveraged to address specific shortcomings of cost estimation. The impetus for leveraging BIM models for accurate cost estimation is to align budgeted and actual cost. This paper hypothesises that the accuracy of BIM-based estimation, as more efficient, process-mirrors of traditional cost estimation methods, can be enhanced by simulating traditional cost estimation factors variables. Through literature reviews and preliminary expert interviews, this paper explores the factors that could potentially lead to more accurate cost estimates for construction projects. The findings show numerous factors that affect the cost estimates ranging from project information and its characteristic, project team, clients, contractual matters, and other external influences. This paper will make a particular contribution to the early phase of BIM-based project estimation.
Resumo:
Cost estimating is a key task within Quantity Surveyors’ (QS) offices. Provision of an accurate estimate is vital to ensure that the objectives of the client are met by staying within the client’s budget. Building Information Modelling (BIM) is an evolving technology that has gained attention in the construction industries all over the world. Benefits from the use of BIM include cost and time savings if the processes used by the procurement team are adapted to maximise the benefits of BIM. BIM can be used by QSs to automate aspects of quantity take-off and the preparation of estimates, decreasing turnaround time and assist in controlling errors and inaccuracies. The Malaysian government has decided to require the use of BIM for its projects beginning from 2016. However, slow uptake is reported in the use of BIM both within companies and to support collaboration within the Malaysian industry. It has been recommended that QSs to start evaluating the impact of BIM on their practices. This paper reviews the perspectives of QSs in Malaysia towards the use of BIM to achieve more dependable results in their cost estimating practice. The objectives of this paper include identifying strategies in improving practice and potential adoption drivers that lead QSs to BIM usage in their construction projects. From the expert interviews, it was found out that, despite still using traditional methods and not practising BIM, the interviewees still acquire limited knowledge related to BIM. There are some drivers that potentially motivate them to employ BIM in their practices. These include client demands, innovation in traditional methods, speed in estimating costs, reduced time and costs, improvement in practices and self-awareness, efficiency in projects, and competition from other companies. The findings of this paper identify the potential drivers in encouraging Malaysian Quantity Surveyors to exploit BIM in their construction projects.
Resumo:
Following the Association of Southeast Asian Nations (ASEAN) senior transport officials meeting in May 2011, the Secretariat requested the Asian Development Bank (ADB) to provide assistance to improve road safety in ASEAN. In response, ADB, funded by the Japan Fund for Poverty Reduction, has begun an innovative approach to capacity building that has already been adapted and replicated in other sub-regions. This paper will discuss the model central to the project. The Road Safety Capacity Building for ASEAN Project commenced in May 2013. Each country has appointed a National Focal Point (NFP) to identify and coordinate information. A team of International Experts were appointed to develop materials and present a comprehensive train the trainer program focused on five key areas. Thirty eight senior Government officers from across ASEAN attended a two week program at ADB headquarters in Manila and will arrange and deliver specific training and associated activities to other colleagues within their country. ADB has appointed a National Consultant to work in partnership with the trainees on a range of activities including development of “pipeline project proposals” for funding consideration investors and donors. As part of the project, a draft ASEAN Regional Road Safety Strategy document has been prepared and consultation will further refine its directions and contents. The project will reach its conclusion in 2015 and a follow up phase three project is being considered.
Resumo:
Introduction. The Brisbane City Council holds a biannual Homeless Connect event which brings together business and community groups on one day to provide free services to people experiencing or at risk of homelessness. Pharmacists were involved in this initiative and provided health services in a multidisciplinary healthcare environment building on the lessons of previous Homeless Connect events (Chan et al, 2015) Aims. To explore pharmacists reflections on their role in a multidisciplinary healthcare team providing services at a community outreach event for those experiencing homelessness. Methods. The pharmacists (n=2) documented the types of services provided during the Homeless Connect event. A semi-structured interview was conducted post-event to investigate barriers, facilitators and changes that would be recommended for future events. Their perceptions of their role in the multidisciplinary healthcare team were also explored. Results. Primarily, the services provided included delivery of primary healthcare, advice on accessing cost effective pharmacy services and addressing medication enquiries. The pharmacists also provided moisturiser samples and health information leaflets. Interdisciplinary referrals were primarily between the pharmacists and podiatrists; no pharmacist-medical practitioner referrals occurred. The pharmacists did believe they had a positive role in this health initiative but improvements could be implemented to improve the delivery of these services in future events. Discussion. Pharmacists can play an important role in providing services to people experiencing or at risk of homelessness and the overall experience was positive for the pharmacists. They were able to integrate into a multidisciplinary healthcare team in this setting but strategies for further collaboration were identified. The possibility of involving pharmacy students in future events was identified.
Resumo:
The built environment is a major contributor to the world’s carbon dioxide emissions, with a considerable amount of energy being consumed in buildings due to heating, ventilation and air-conditioning, space illumination, use of electrical appliances, etc., to facilitate various anthropogenic activities. The development of sustainable buildings seeks to ameliorate this situation mainly by reducing energy consumption. Sustainable building design, however, is a complicated process involving a large number of design variables, each with a range of feasible values. There are also multiple, often conflicting, objectives involved such as the life cycle costs and occupant satisfaction. One approach to dealing with this is through the use of optimization models. In this paper, a new multi-objective optimization model is developed for sustainable building design by considering the design objectives of cost and energy consumption minimization and occupant comfort level maximization. In a case study demonstration, it is shown that the model can derive a set of suitable design solutions in terms of life cycle cost, energy consumption and indoor environmental quality so as to help the client and design team gain a better understanding of the design space and trade-off patterns between different design objectives. The model can very useful in the conceptual design stages to determine appropriate operational settings to achieve the optimal building performance in terms of minimizing energy consumption and maximizing occupant comfort level.