999 resultados para phase rule
Resumo:
LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.
Resumo:
X-ray diffraction analyses of the pure components n-tricosane and n-pentacosane and of their binary mixed samples have enabled us to characterize the crystalline phases observed at low temperature. On the contrary to what was announced in literature on the structural behavior of mixed samples in odd-odd binary systems with D n = 2, the three domains are not all orthorhombic. This work has enabled us to show that two of the domains are, in fact, monoclinic, (Aa, Z = 4) and the other one is orthorhombic (Pca21, Z = 4). The conclusions drawn in this work can be easily transposed to other binary systems of n-alkanes.
Resumo:
Pre- and postnatal corticosteroids are often used in perinatal medicine to improve pulmonary function in preterm infants. To mimic this clinical situation, newborn rats were treated systemically with dexamethasone (Dex), 0.1-0.01 mg/kg/day on days P1-P4. We hypothesized that postnatal Dex may have an impact on alveolarization by interfering with extracellular matrix proteins and cellular differentiation. Morphological alterations were observed on 3D images obtained by high-resolution synchrotron radiation X-ray tomographic microscopy. Alveolarization was quantified stereologically by estimating the formation of new septa between days P4 and P60. The parenchymal expression of tenascin-C (TNC), smooth muscle actin (SMA), and elastin was measured by immunofluorescence and gene expression for TNC by qRT-PCR. After Dex treatment, the first phase of alveolarization was significantly delayed between days P6 and P10, whereas the second phase was accelerated. Elastin and SMA expressions were delayed by Dex treatment, whereas TNC expression was delayed and prolonged. A short course of neonatal steroids impairs the first phase of alveolarization, most likely by altering the TNC and elastin expression. Due to an overshooting catch-up during the second phase of alveolarization, the differences disappear when the animals reach adulthood.
Resumo:
Le "Chest wall syndrome" (CWS) est défini comme étant une source bénigne de douleurs thoraciques, localisées sur la paroi thoracique antérieure et provoquées par une affection musculosquelettique. Le CWS représente la cause la plus fréquente de douleurs thoraciques en médecine de premier recours. Le but de cette étude est de développer et valider un score de prédiction clinique pour le CWS. Une revue de la littérature a d'abord été effectuée, d'une part pour savoir si un tel score existait déjà, et d'autre part pour retrouver les variables décrites comme étant prédictives d'un CWS. Le travail d'analyse statistique a été effectué avec les données issues d'une cohorte clinique multicentrique de patients qui avaient consulté en médecine de premier recours en Suisse romande avec une douleur thoracique (59 cabinets, 672 patients). Un diagnostic définitif avait été posé à 12 mois de suivi. Les variables pertinentes ont été sélectionnées par analyses bivariées, et le score de prédiction clinique a été développé par régression logistique multivariée. Une validation externe de ce score a été faite en utilisant les données d'une cohorte allemande (n= 1212). Les analyses bivariées ont permis d'identifier 6 variables caractérisant le CWS : douleur thoracique (ni rétrosternale ni oppressive), douleur en lancées, douleur bien localisée, absence d'antécédent de maladie coronarienne, absence d'inquiétude du médecin et douleur reproductible à la palpation. Cette dernière variable compte pour 2 points dans le score, les autres comptent pour 1 point chacune; le score total s'étend donc de 0 à 7 points. Dans la cohorte de dérivation, l'aire sous la courbe sensibilité/spécificité (courbe ROC) est de 0.80 (95% de l'intervalle de confiance : 0.76-0.83). Avec un seuil diagnostic de > 6 points, le score présente 89% de spécificité et 45% de sensibilité. Parmi tous les patients qui présentaient un CWS (n = 284), 71% (n = 201) avaient une douleur reproductible à la palpation et 45% (n= 127) sont correctement diagnostiqués par le score. Pour une partie (n = 43) de ces patients souffrant de CWS et correctement classifiés, 65 investigations complémentaires (30 électrocardiogrammes, 16 radiographies du thorax, 10 analyses de laboratoire, 8 consultations spécialisées, et une tomodensitométrie thoracique) avaient été réalisées pour parvenir au diagnostic. Parmi les faux positifs (n = 41), on compte trois angors stables (1.8% de tous les positifs). Les résultats de la validation externe sont les suivants : une aire sous la courbe ROC de 0.76 (95% de l'intervalle de confiance : 0.73-0.79) avec une sensibilité de 22% et une spécificité de 93%. Ce score de prédiction clinique pour le CWS constitue un complément utile à son diagnostic, habituellement obtenu par exclusion. En effet, pour les 127 patients présentant un CWS et correctement classifiés par notre score, 65 investigations complémentaires auraient pu être évitées. Par ailleurs, la présence d'une douleur thoracique reproductible à la palpation, bien qu'étant sa plus importante caractéristique, n'est pas pathognomonique du CWS.
Resumo:
[Table des matières] 1.1. Bref historique de la stratégie nationale de lutte contre le cancer. 1.2. Mandat d'évaluation. 1. 3. Approche d'évaluation choisie. 1.4. Phase 1 : programme d'évaluation 1999. 2. Conclusions et recommandations générales. 2.1. Stratégie et concept directeur. 2.2. Structure soutenant le programme national de lutte contre le cancer. 2.3. Rôle et fonctionnement des différents organes du programme national. 2.4. Collaborations. 2.5. Monitoring des programmes, évaluation de projets spécifiques et indicateurs à disposition pour l'évaluation globale. 3. Propositions pour la suite de l'évaluation. 4. Résumé de l'étude 1 : évaluation de la conception et de la mise en oeuvre de la stratégie au niveau national. 5. Studie 2 : Inventar der vorhandene Datenquellen und Indikatoren. 5.1. Zusammenfassung. 5.2. Allgemeine Schlussfolgerungen und Empfehlungen. 6. Studie 3 : Konzeptualisierung und Stand der Umsetzung der vier Krebsbekämpfungsprogramme. 6.1. Einleitung. 6.2. Zusammenfassung der programmübergreifende Ergebnisse : zum Konzeptualisierungsprozess, zum Steuerungsprozess, zur Vernetzung innerhalb der Programme und im relevanten Umfeld. 6.3. Zusammenfassung der programmspezifischen Ergebnisse : Brustkrebs, Hautkrebs, Lungenkrebs, Darmkrebs. 6.4. Empfehlungen : Programmübergreifende Empfehlungen, ergänzende programmspezifische Empfehlungen.
Resumo:
This work presents an alternative to generate continuous phase shift of sinusoidal signals based on the use of super harmonic injection locked oscillators (ILO). The proposed circuit is a second harmonic ILO with varactor diodes as tuning elements. In the locking state, by changing the varactor bias, a phase shift instead of a frequency shift is observed at the oscillator output. By combining two of these circuits, relative phases up to 90 could be achieved. Two prototypes of the circuit have been implemented and tested, a hybrid version working in the range of 200-300 MHz and a multichip module (MCM) version covering the 900¿1000 MHz band.
Resumo:
A general formulation of boundary conditions for semiconductor-metal contacts follows from a phenomenological procedure sketched here. The resulting boundary conditions, which incorporate only physically well-defined parameters, are used to study the classical unipolar drift-diffusion model for the Gunn effect. The analysis of its stationary solutions reveals the presence of bistability and hysteresis for a certain range of contact parameters. Several types of Gunn effect are predicted to occur in the model, when no stable stationary solution exists, depending on the value of the parameters of the injecting contact appearing in the boundary condition. In this way, the critical role played by contacts in the Gunn effect is clearly established.
Resumo:
We study the influence of Nb doping on the TiO2 anatase-to-rutile phase transition, using combined transmission electron microscopy, Raman spectroscopy, x-ray diffraction and selected area electron diffraction analysis. This approach enabled anatase-to-rutile phase transition hindering to be clearly observed for low Nb-doped TiO2 samples. Moreover, there was clear grain growth inhibition in the samples containing Nb. The use of high resolution transmission electron microscopy with our samples provides an innovative perspective compared with previous research on this issue. Our analysis shows that niobium is segregated from the anatase structure before and during the phase transformation, leading to the formation of NbO nanoclusters on the surface of the TiO2 rutile nanoparticles.
Resumo:
There is no registered treatment (ttr) for pts with mCRPC who have progressive disease during or shortly after docetaxel (doc). EGFR overexpression increases in prostate cancer during the course of the disease. We investigated efficacy and safety of the combination of the monoclonal EGFR antibody cetuximab (cet) and doc in pts with mCRPC who are doc-refractory. Methods: Pts with mCRPC progressing during or < 90 days after at least 12 weeks of doc were included. Ttr consisted of the same doc regimen as prior to progression (35mg/m2 d1,8,15 q4w or 75mg/m2 q3w) in combination with cet (400mg/m2 d1, then 250mg/m2 weekly). Primary endpoint was progression free survival (PFS) at 12 weeks defined as absence of PSA progression or progression of metastases (mets). Secondary endpoints included toxicity, PFS at 24 weeks, PSA response, response of measureable disease and overall survival. 35 pts were needed in a Simon's two stage optimal design with a power of 90% and a significance level of 5% in order to test PFS rate at 12 weeks of £10% vs ?30%. Results: 35 evaluable pts were enrolled at 15 Swiss centers between 7/08 and 9/09. Median follow up was 14.8 months. Confirmed PFS at 12 weeks was 34% (95%CI 19-52%), PFS at 24 weeks was 20% and overall survival was 12.0 months (95%CI 7.1 -15.6). 20% (7/35) had a confirmed decline in PSA ? 50% and 31% (11/35) had a confirmed PSA decline ? 30%. Of pts with measurable disease (n=24) PR, SD and PD at week 12 was 4%, 54% and 25%, respectively (17% not evaluable). 3/9 (33%) pts with PDduring last doc ttr before inclusion reached the primary endpoint compared to 7/18 (39%) with PR or SD to last doc. 54% of evaluable pts experienced grade 3 and 6% grade 4 toxicity. Discussion: The result of the primary endpoint was promising in this first trial to test cet in combination with doc in pts with docetaxel-refractory mCRPC. Because this goal was achieved in such a highly pretreated pts population it appears that inhibition of the EGFR pathway may play a more important and persistent role in the treatment of prostate cancer than perceived so far. Further research is therefore warranted. Disclosure: R. Cathomas: - Membership on advisory board for sanofi aventis (suisse) and Merck. S. Gillessen: - Membership in advisory board for Sanofi Aventis. All other authors have declared no conflicts of interest.