853 resultados para mega-projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open source software projects are multi-collaborative works incorporating the contributions of numerous developers who, in spite of publishing their code under a public license such as GPL, Apache or BSD, retain the copyright in their contributions. Having multiple copyright-owners can make the steering of a project difficult, if not impossible, as there is no ultimate authority able to take decisions relating to the maintenance and use of the project. This predicament can be remedied by centring the dispersed copyrights in a single authority via contributor agreements. Whether to introduce contributor agreements, and if so in which form, is a pressing question for many emerging, but also for established projects. The current paper provides an insight into the ethos of different projects and their reason for adopting or rejecting particular contributor agreements. It further examines the exact set-up of the contributor agreements used and concludes that smart drafting can blur the difference between CAAs and CLAs to a considerable extent, manoeuvring them into a legal grey area. To avoid costly litigation to test the legal enforceability of individual clauses, this paper proposes the establishment of an international committee comprised of developers, product managers and lawyers interested in finding a common terminology that may serve as a foundation for every contributor agreement

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Individual learning is central to the success of the transition phase in software mainte-nance offshoring projects. However, little is known on how learning activities, such as on-the-job training and formal presentations, are effectively combined during the tran-sition phase. In this study, we present and test propositions derived from cognitive load theory. The results of a multiple-case study suggest that learning effectiveness was highest when learning tasks such as authentic maintenance requests were used. Con-sistent with cognitive load theory, learning tasks were most effective when they imposed moderate cognitive load. Our data indicate that cognitive load was influenced by the expertise of the onsite coordinator, by intrinsic task complexity, by the degree of specifi-cation of tasks, and by supportive information. Cultural and semantic distances may in-fluence learning by inhibiting supportive information, specification, and the assignment of learning tasks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The execution of a project requires resources that are generally scarce. Classical approaches to resource allocation assume that the usage of these resources by an individual project activity is constant during the execution of that activity; in practice, however, the project manager may vary resource usage over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and various work-content-related constraints are met. We formulate this problem for the first time as a mixed-integer linear program. Our computational results for a standard test set from the literature indicate that this model outperforms the state-of-the-art solution methods for this problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The benefits companies achieve by implementing an ERP system vary considerably. Many companies need to adapt their ERP integration solution in the post-implementation stage. But after the completion of such a usually very complex integration project, benefits do not emerge by all means. A misfit between the organization and the IS, especially the aspect of cross-functional team collaboration, could explain these divergences. Using an initial theoretical framework, we conducted a single case study to explore the team-oriented perceptions in a post-implementation ERP integration project. To analyze the benefits and the influences in greater depth we disentangled the integration benefits into their particular parts (process, system and information quality). Our findings show that post-implementation ERP integration changes are not always perceived as beneficiary by the involved teams and that cross-functional collaboration has an important influence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing practice of offshore outsourcing software maintenance has posed the challenge of effectively transferring knowledge to individual software engineers of the vendor. In this theoretical paper, we discuss the implications of two learning theories, the model of work-based learning (MWBL) and cognitive load theory (CLT), for knowledge transfer during the transition phase. Taken together, the theories suggest that learning mechanisms need to be aligned with the type of knowledge (tacit versus explicit), task characteristics (complexity and recurrence), and the recipients’ expertise. The MWBL proposes that learning mechanisms need to include conceptual and practical activities based on the relative importance of explicit and tacit knowledge. CLT explains how effective portfolios of learning mechanisms change over time. While jobshadowing, completion tasks, and supportive information may prevail at the outset of transition, they may be replaced by the work on conventional tasks towards the end of transition.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador: