891 resultados para electric power generation
Resumo:
Since Queensland Wire Industries Pty Ltd v Broken Hill Pty Co Ltd (1989) 167 CLR 177 it has been recognised that corporations with substantial market power are subject to special responsibilities and restraints that corporations without market power are not. In NT Power Generation Pty Ltd v Power and Water Authority (2004) 219 CLR 90 McHugh A-CJ, Gummow, Callinan and Heydon JJ in their joint reasons stated (at [76]), that s 46 of the Competition and Consumer Act 2010 (Cth) (CCA) can operate not only to prevent firms with substantial market power from doing prohibited things, but also compel them positively to do things they do not want to do. Their Honours also stated (at [126]) that the proposition that a private property owner who declines to permit competitors to use the property is immune from s 46 is “intrinsically unsound”. However, the circumstances in which a firm with substantial power must accommodate competitors, and private property rights give way to the public interest are uncertain. The purpose of this Note is to consider recent developments in two areas of the CCA where the law requires private property rights to give way to the public interest. The first part of the Note considers two recent cases which clarify the circumstances in which s 46 of the CCA can be used to compel a firm with substantial market power to accommodate a competitor and allow the competitor to make use of private property rights in the public interest. Secondly, on 12 February 2014 the Minister for Small Business, the Hon Bruce Billson,released the Productivity Commission’s Final Report, on the National Access Regime in Pt IIIA of the CCA (National Access Regime, Inquiry Report No 66, Canberra). Pt IIIA provides for the processes by which third parties may obtain access to infrastructure owned by others in the public interest. The Report recommends that Pt IIIA be retained but makes a number of suggestions for its reform, some of which will be briefly considered.
Resumo:
Unbalanced or non-linear loads result in distorted stator currents and electromagnetic torque pulsations in stand-alone doubly fed induction generators (DFIGs). This study proposes the use of a proportional-integral repetitive control (PIRC) scheme so as to mitigate the levels of harmonic and unbalance at the stator terminals of the DFIG. The PIRC is structurally simpler and requires much less computation than existing methods. Analysis of the PIRC operation and the methodology to determine the control parameters is included. Simulation study as well as laboratory test measurements demonstrate clearly the effectiveness of the proposed PIRC control scheme.
Resumo:
This paper introduces a novel cage induction generator and presents a mathematical model, through which its behavior can be accurately predicted. The proposed generator system employs a three-phase cage induction machine and generates single-phase and constant-frequency electricity at varying rotor speeds without an intermediate inverter stage. The technique uses any one of the three stator phases of the machine as the excitation winding and the remaining two phases, which are connected in series, as the power winding. The two-series-connected-and-one-isolated (TSCAOI) phase winding configuration magnetically decouples the two sets of windings, enabling independent control. Electricity is generated through the power winding at both sub- and super-synchronous speeds with appropriate excitation to the isolated single winding at any frequency of generation. A dynamic mathematical model, which accurately predicts the behavior of the proposed generator, is also presented and implemented in MATLAB/Simulink. Experimental results of a 2-kW prototype generator under various operating conditions are presented, together with theoretical results, to demonstrate the viability of the TSCAOI power generation. The proposed generator is simple and capable of both storage and retrieval of energy through its excitation winding and is expected to be suitable for applications, such as small wind turbines and microhydro systems.
Resumo:
Modulation and control of a cascade multilevel static synchronous compensator (STATCOM) configuration to improve the quality of voltage generated by wind power systems are presented. The proposed STATCOM configuration needs only four dc-link capacitors and 24 switches to synthesise nine-level operation. In addition to that, switching losses are further reduced by splitting the voltage source inverter of the STATCOM into two units called the `bulk inverter` and the `conditioning inverter`. The high-power bulk inverter is operated at low frequency whereas the low-power conditioning inverter is operated at high frequency to suppress harmonics produced by the bulk inverter. Fluctuations at the point of common coupling voltage, caused by sudden wind changes, are suppressed by controlling reactive power of the STATCOM. Simulation and experimental results are presented to verify the efficacy of the proposed modulation and control techniques used in the STATCOM.
Resumo:
Fault identification in industrial machine is a topic of major importance under engineering point of view. In fact, the possibility to identify not only the type, but also the severity and the position of a fault occurred along a shaft-line allows quick maintenance and shorten the downtime. This is really important in the power generation industry where the units are often of several tenths of meters long and where the rotors are enclosed by heavy and pressure-sealed casings. In this paper, an industrial experimental case is presented related to the identification of the unbalance on a large size steam turbine of about 1.3 GW, belonging to a nuclear power plant. The case history is analyzed by considering the vibrations measured by the condition monitoring system of the unit. A model-based method in the frequency domain, developed by the authors, is introduced in detail and it is then used to identify the position of the fault and its severity along the shaft-line. The complete model of the unit (rotor – modeled by means of finite elements, bearings – modeled by linearized damping and stiffness coefficients and foundation – modeled by means of pedestals) is analyzed and discussed before being used for the fault identification. The assessment of the actual fault was done by inspection during a scheduled maintenance and excellent correspondence was found with the identified one by means of authors’ proposed method. Finally a complete discussion is presented about the effectiveness of the method, even in presence of a not fine tuned machine model and considering only few measuring planes for the machine vibration.
Resumo:
During the last few years, there has been an increased attention paid on the developments of DC microgrids (DCMGs) and their applications. For economical and more flexible wind power generation, doubly fed induction generator (DFIG) is regarded as a most commonly used generator in wind farms. This paper presents a configuration and operation method for a DCMG connected with DFIGs, in which the controller of the DFIG is designed for maximum power point tracking (MPPT). The generation of harmonics and their effects on the generator in this configuration are analyzed and a harmonic compensation method is proposed. Furthermore, the simulation results are presented to show that the DFIG can be operated effectively in DCMGs and harmonic currents can be reduced.
Resumo:
A mode switching doubly fed induction generator (MSDFIG) scheme is proposed for the purpose of achieving low-voltage ride-through for wind turbines. The MSDFIG operates as a doubly fed induction generator (DFIG) under normal condition but upon the detection of a low-voltage incident, the generator is to smoothly transfer to operate under the induction generator mode through the switching in of a set of stator-side crowbar. The MSDFIG automatically reverts back to the DFIG mode when network voltage recovers. A new strategy on the control of the crowbar resistance is included. Analysis shows that the proposed MSDFIG scheme can ride through the complete low-voltage and voltage recovery stages. Effectiveness of the scheme is demonstrated through simulation and experiment studies.
Resumo:
The Japanese electricity industry has experienced regulatory reforms since the mid-1990s. This article measures productivity in Japan's steam power-generation sector and examines the effect of reforms on the productivity of this industry over the period 1978-2003. We estimate the Luenberger productivity indicator, which is a generalization of the commonly used Malmquist productivity index, using a data envelopment analysis approach. Factors associated with productivity change are investigated through dynamic generalized method of moments (GMM) estimation of panel data. Our empirical analysis shows that the regulatory reforms have contributed to productivity growth in the steam power-generation sector in Japan.
Resumo:
A Z-source inverter based grid-interface for a variable-speed wind turbine connected to a permanent magnet synchronous generator is proposed. A control system is designed to harvest maximum wind energy under varied wind conditions with the use of the permanent magnet synchronous generator, diode-rectifier and Z-source inverter. Control systems for speed regulation of the generator and for DC- and AC- sides of the Z-source inverter are investigated using computer simulations and laboratory experiments. Simulation and experimental results verify the efficacy of the proposed approach.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
Integration of rooftop photovoltaics (PVs) in residential networks at moderate penetration levels is becoming a reality in many countries including Australia. Despite the technical challenges in properly accommodating PV units, one of the major benefits is the ability of PV units to extend useful life time of distribution transformers. This effect is not quantified in the existing literature. This paper carries out an analysis into the impacts of rooftop PVs at different penetration levels on the performance of distribution transformers and residential networks. This paper presents a methodology to quantify the benefit of the distribution transformer life extension brought about by customer-owned rooftop PV units. The proposed methodology is applied to a real distribution system with various scenarios, including different penetration levels. The results show the distribution transformer loss-of-life function, as a function of the rooftop PV penetration level, is monotonically decreasing function which saturates after a certain penetration level. The best life improvements occur with transformers that are highly loaded and the presence of a significant PV installation may support the deferral of transformer upgrades.
Resumo:
This paper presents an efficient algorithm for optimizing the operation of battery storage in a low voltage distribution network with a high penetration of PV generation. A predictive control solution is presented that uses wavelet neural networks to predict the load and PV generation at hourly intervals for twelve hours into the future. The load and generation forecast, and the previous twelve hours of load and generation history, is used to assemble load profile. A diurnal charging profile can be compactly represented by a vector of Fourier coefficients allowing a direct search optimization algorithm to be applied. The optimal profile is updated hourly allowing the state of charge profile to respond to changing forecasts in load.
Resumo:
A high-frequency-link micro inverter is proposed with a front-end dual inductor push-pull converter and a grid-connected half-wave cycloconverter. Pulse width modulation is used to control the front-end converter and phase shift modulation is used at the back-end converter to obtain grid synchronized output current. A series resonant circuit and high-frequency transformer are used to interface the front-end and the back-end converters. The operation of the proposed micro-inverter in grid-connected mode is validated using MATLAB/Simpower simulation. Experimental results are provided to further validate the operation.
Resumo:
High-voltage circuit breakers are among the most important equipments for ensuring the efficient and safe operation of an electric power system. On occasion, circuit breaker operators may wish to check whether equipment is performing satisfactorily and whether controlled switching systems are producing reliable and repeatable stress control. Monitoring of voltage and current waveforms during switching using established methods will provide information about the magnitude and frequency of voltage transients as a result of re-ignitions and restrikes. However, high frequency waveform measurement requires shutdown of circuit breaker and use of specialized equipment. Two utilities, Hydro-Québec in Canada and Powerlink Queensland in Australia, have been working on the development and application of a non-intrusive, cost-effective and flexible diagnostic system for monitoring high-voltage circuit breakers for reactive switching. The proposed diagnostic approach relies on the non-intrusive assessment of key parameters such as operating times, prestrike characteristics, re-ignition and restrike detection. Transient electromagnetic emissions have been identified as a promising means to evaluate the abovementioned parameters non-intrusively. This paper describes two complimentary methods developed concurrently by Powerlink and Hydro-Québec. Also, return of experiences on the application to capacitor bank and shunt reactor switching is presented.
Resumo:
Thyristor forced commutated AC/DC convertors are useful for improving the power factor and waveform of AC-side line current. These are controlled through pulse-width modulation schemes for best performance. However, the 3-phase versions impose restrictions on the PWM strategies that can be implemented for excellent harmonic rejection. This paper presents new PWM control strategies for the 3-phase converters and compares them along with the conventional 4-pulse PWM strategy for harmonic elimination. Finally, two new PWM strategies are shown to be the best, for which oscillograms are presented from actual implementation.