844 resultados para discretionary judgement in contract
Resumo:
National Highway Traffic Safety Administration, Vehicle Engineering Research Division, Washington, D.C.
Resumo:
"Work Performed Under Contract No. AC02-77CH00178."
Resumo:
"Work Performed Under Contract No. EG-77-C-01-4042."
Resumo:
The utilization of direct solar gains in buildings can be affected by operating profiles, such as schedules for internal gains, thermostat controls, and ventilation rates. Building energy analysis methods use various assumptions about these profiles. This paper describes the effects of typical internal gain assumptions in energy calculations. The results of this study indicate that calculations of annual heating and cooling loads are sensitive to internal gains, but in most cases are relatively insensitive to hourly variation in internal gains.
Resumo:
"Work Performed Under Contract No. EG-77-C-01-4042."
Resumo:
"May 1977."
Resumo:
"Contract No. DACW39-73-C-0129."
Resumo:
"August 1973."
Resumo:
"December 1973."
Resumo:
"Report no. CG-D-08-81."
Resumo:
"May 1960 {TIS Issuance Date]"
Resumo:
Because the use of filters to sample particulate matter suspended in the upper atmosphere has been investigated and has yielded rather disappointing results, an examination of other methods of upper atmospheric sampling is desirable, and this is the aim of the present report. The nature of any radioactive material, and its relation to the size and composition of the suspended particles is of particular interest.
Resumo:
"Quarterly progress report".
Resumo:
"September 1960 [OTI Extension Issuance Date]"--Cover.
Resumo:
"Work done under AEC Contract: AT911-1)-GEN-8."