876 resultados para Wind-based planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ERS-1 Satellite was launched in July 1991 by the European Space Agency into a polar orbit at about km800, carrying a C-band scatterometer. A scatterometer measures the amount of radar back scatter generated by small ripples on the ocean surface induced by instantaneous local winds. Operational methods that extract wind vectors from satellite scatterometer data are based on the local inversion of a forward model, mapping scatterometer observations to wind vectors, by the minimisation of a cost function in the scatterometer measurement space.par This report uses mixture density networks, a principled method for modelling conditional probability density functions, to model the joint probability distribution of the wind vectors given the satellite scatterometer measurements in a single cell (the `inverse' problem). The complexity of the mapping and the structure of the conditional probability density function are investigated by varying the number of units in the hidden layer of the multi-layer perceptron and the number of kernels in the Gaussian mixture model of the mixture density network respectively. The optimal model for networks trained per trace has twenty hidden units and four kernels. Further investigation shows that models trained with incidence angle as an input have results comparable to those models trained by trace. A hybrid mixture density network that incorporates geophysical knowledge of the problem confirms other results that the conditional probability distribution is dominantly bimodal.par The wind retrieval results improve on previous work at Aston, but do not match other neural network techniques that use spatial information in the inputs, which is to be expected given the ambiguity of the inverse problem. Current work uses the local inverse model for autonomous ambiguity removal in a principled Bayesian framework. Future directions in which these models may be improved are given.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study examines the cultural value systems of employees working in major industrial and commercial centers of six ex-communist Central and Eastern European countries (CEEC) and the former Soviet Republics (FSR). The study throws light on how human resources are managed in these countries and has key messages for overseas operators who are already doing business or planning to start on in these countries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explains how strategic planning is able to deliver strategic integration within organizations. While communication and participation within planning processes are perceived to have an integrative effect, we argue that these effects are unlikely to arise simply from bringing people together. Rather, we suggest that, given the varying interests of actors in different business units, integration will only arise from active negotiations and compromises between these actors. The paper is based upon a case of strategic planning in a multinational that was attempting to develop greater strategic integration across Europe. Drawing upon an activity theory framework, we examine how a common strategy emerges over time through modifications to the planning process and to different actors’ roles within it. The findings are used to develop a process model that shows how different business unit characteristics of planning experience and relative power shape different experiences of communication and participation activities and different processes for achieving integration. The paper concludes with a discussion of how this process model contributes to the literature on strategic planning, political processes of strategy-making, and strategy-as-practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – To investigate the impact of performance measurement in strategic planning process. Design/methodology/approach – A large scale survey was conducted online with Warwick Business School alumni. The questionnaire was based on the Strategic Development Process model by Dyson. The questionnaire was designed to map the current practice of strategic planning and to determine its most influential factors on the effectiveness of the process. All questions were close ended and a seven-point Likert scale used. The independent variables were grouped into four meaningful factors by factor analysis (Varimax, coefficient of rotation 0.4). The factors produced were used to build regression models (stepwise) for the five assessments of strategic planning process. Regression models were developed for the totality of the responses, comparing SMEs and large organizations and comparing organizations operating in slowly and rapidly changing environments. Findings – The results indicate that performance measurement stands as one of the four main factors characterising the current practice of strategic planning. This research has determined that complexity coming from organizational size and rate of change in the sector creates variation in the impact of performance measurement in strategic planning. Large organizations and organizations operating in rapidly changing environments make greater use of performance measurement. Research limitations/implications – This research is based on subjective data, therefore the conclusions do not concern the impact of strategic planning process' elements on the organizational performance achievements, but on the success/effectiveness of the strategic planning process itself. Practical implications – This research raises a series of questions about the use and potential impact of performance measurement, especially in the categories of organizations that are not significantly influenced by its utilisation. It contributes to the field of performance measurement impact. Originality/value – This research fills in the gap literature concerning the lack of large scale surveys on strategic development processes and performance measurement. It also contributes in the literature of this field by providing empirical evidences on the impact of performance measurement upon the strategic planning process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper looks at how a strategic plan is constructed through a communicative process. Drawing on Ricoeur’s concepts of decontextualization and recontextualization, we conceptualize strategic planning activities as being constituted through the iterative and recursive relationship of talk and text. Based on an in-depth case study, our findings show how multiple actors engage in a formal strategic planning process which is manifested in a written strategy document. This document is thus central in the iterative talk to text cycles. As individuals express their interpretations of the current strategic plan in talk, they are able to make amendments to the text that then shape future textual versions of the plan. This iterative cycle is repeated until a final plan is agreed. We develop our findings into a model of the communication process that explains how texts become more authoritative over time and, in doing so, how they inscribe power relationships and social order within organizations. These findings contribute to the literature on the purposes of largely institutionalized processes of strategic planning and to the literature on organization as a communications process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Scenario Planning is a strategy tool with growing popularity in both academia and practical situations. Current practices in the teaching of scenario planning are largely based on existing literature which utilises scenario planning to develop strategies for the future, primarily considering the assessment of perceived macro-external environmental uncertainties. However there is a body of literature hitherto ignored by scenario planning researchers, which suggests that Perceived Environmental Uncertainty (PEU) influences micro-external or industrial environmental as well as the internal environment of the organisation. This paper provides a review of the most dominant theories on scenario planning process, demonstrates the need to consider PEU theory within scenario planning and presents how this can be done. The scope of this paper is to enhance the scenario planning process as a tool taught for Strategy Development. A case vignette is developed based on published scenarios to demonstrate the potential utilisation of the proposed process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The majority of research on the pharmaceutical sector has focused on an overall micro economic, medical oriented welfare issues, whereas the marketing management role of the innovative drug manufacturer has to a large extent been disregarded. Using the case of Turkey, through a series of in-depth interviews with highly innovative companies, other marketing management possibilities to develop pricing strategies and plan for profit are explored based on broader definitions of value and transparency. Our results suggest that pharmaceutical companies as well as governments might have a too narrow focus of value and underestimate the potential long term benefits of a broader approach to marketing management and long term relationships between the various stakeholders.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to help managers to successfully plan, implement, and operate enterprise resource planning (ERP) projects using a risk management framework. Design/methodology/approach – This paper adopted a combined literature review and case study method. Using literature review, the paper first identified major issues of managing ERP projects and develops a risk management framework for managing those issues. The proposed risk management framework was then applied to a ERP implementation project of a UK-based energy services group and its effectiveness for managing ERP projects implementation had been demonstrated. Additionally, the risk factors as identified from the case application are compared with the risk factors from the previous researches so as to suggest mitigating measures. Findings – All the risk factors are categorized into planning, implementation and operations phases along with project processes, organizational transformation and information technology (IT) perspectives. Project implementation phase is the most vulnerable to failure. The case study results reveal that the effect of other projects on on-going ERP project, management of overall IT architecture and non-availability of resources for organizational transformation are most critical from likelihood and impact perspectives. Managing risk across various phases of project and equal emphasize to effective project management, organizational transformation and IT adoption are the key to success in ERP implementation. Practical implications – The risk factors, which were identified using literature review and the case study, have great significance as mitigating measures of those risks may result successful implementation of ERP projects in the industry. Additionally, proposed risk management framework could be customized to implement ERP projects elsewhere. Originality/value – ERP projects are risky as they are capital intensive, technically complex, and call for organizational transformation. There are both success and failure stories. However, both researchers and practitioners agree, that if it can be implemented and operated successfully and benefits should be achievable. Although there are many studies on ERP implementation, little has been discussed on managing risks of ERP projects. Therefore, this paper bridges the gap.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The rapid global loss of biodiversity has led to a proliferation of systematic conservation planning methods. In spite of their utility and mathematical sophistication, these methods only provide approximate solutions to real-world problems where there is uncertainty and temporal change. The consequences of errors in these solutions are seldom characterized or addressed. We propose a conceptual structure for exploring the consequences of input uncertainty and oversimpli?ed approximations to real-world processes for any conservation planning tool or strategy. We then present a computational framework based on this structure to quantitatively model species representation and persistence outcomes across a range of uncertainties. These include factors such as land costs, landscape structure, species composition and distribution, and temporal changes in habitat. We demonstrate the utility of the framework using several reserve selection methods including simple rules of thumb and more sophisticated tools such as Marxan and Zonation. We present new results showing how outcomes can be strongly affected by variation in problem characteristics that are seldom compared across multiple studies. These characteristics include number of species prioritized, distribution of species richness and rarity, and uncertainties in the amount and quality of habitat patches. We also demonstrate how the framework allows comparisons between conservation planning strategies and their response to error under a range of conditions. Using the approach presented here will improve conservation outcomes and resource allocation by making it easier to predict and quantify the consequences of many different uncertainties and assumptions simultaneously. Our results show that without more rigorously generalizable results, it is very dif?cult to predict the amount of error in any conservation plan. These results imply the need for standard practice to include evaluating the effects of multiple real-world complications on the behavior of any conservation planning method.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ERS-1 Satellite was launched in July 1991 by the European Space Agency into a polar orbit at about 800 km, carrying a C-band scatterometer. A scatterometer measures the amount of backscatter microwave radiation reflected by small ripples on the ocean surface induced by sea-surface winds, and so provides instantaneous snap-shots of wind flow over large areas of the ocean surface, known as wind fields. Inherent in the physics of the observation process is an ambiguity in wind direction; the scatterometer cannot distinguish if the wind is blowing toward or away from the sensor device. This ambiguity implies that there is a one-to-many mapping between scatterometer data and wind direction. Current operational methods for wind field retrieval are based on the retrieval of wind vectors from satellite scatterometer data, followed by a disambiguation and filtering process that is reliant on numerical weather prediction models. The wind vectors are retrieved by the local inversion of a forward model, mapping scatterometer observations to wind vectors, and minimising a cost function in scatterometer measurement space. This thesis applies a pragmatic Bayesian solution to the problem. The likelihood is a combination of conditional probability distributions for the local wind vectors given the scatterometer data. The prior distribution is a vector Gaussian process that provides the geophysical consistency for the wind field. The wind vectors are retrieved directly from the scatterometer data by using mixture density networks, a principled method to model multi-modal conditional probability density functions. The complexity of the mapping and the structure of the conditional probability density function are investigated. A hybrid mixture density network, that incorporates the knowledge that the conditional probability distribution of the observation process is predominantly bi-modal, is developed. The optimal model, which generalises across a swathe of scatterometer readings, is better on key performance measures than the current operational model. Wind field retrieval is approached from three perspectives. The first is a non-autonomous method that confirms the validity of the model by retrieving the correct wind field 99% of the time from a test set of 575 wind fields. The second technique takes the maximum a posteriori probability wind field retrieved from the posterior distribution as the prediction. For the third technique, Markov Chain Monte Carlo (MCMC) techniques were employed to estimate the mass associated with significant modes of the posterior distribution, and make predictions based on the mode with the greatest mass associated with it. General methods for sampling from multi-modal distributions were benchmarked against a specific MCMC transition kernel designed for this problem. It was shown that the general methods were unsuitable for this application due to computational expense. On a test set of 100 wind fields the MAP estimate correctly retrieved 72 wind fields, whilst the sampling method correctly retrieved 73 wind fields.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An intelligent agent, operating in an external world which cannot be fully described in its internal world model, must be able to monitor the success of a previously generated plan and to respond to any errors which may have occurred. The process of error analysis requires the ability to reason in an expert fashion about time and about processes occurring in the world. Reasoning about time is needed to deal with causality. Reasoning about processes is needed since the direct effects of a plan action can be completely specified when the plan is generated, but the indirect effects cannot. For example, the action `open tap' leads with certainty to `tap open', whereas whether there will be a fluid flow and how long it might last is more difficult to predict. The majority of existing planning systems cannot handle these kinds of reasoning, thus limiting their usefulness. This thesis argues that both kinds of reasoning require a complex internal representation of the world. The use of Qualitative Process Theory and an interval-based representation of time are proposed as a representation scheme for such a world model. The planning system which was constructed has been tested on a set of realistic planning scenarios. It is shown that even simple planning problems, such as making a cup of coffee, require extensive reasoning if they are to be carried out successfully. The final Chapter concludes that the planning system described does allow the correct solution of planning problems involving complex side effects, which planners up to now have been unable to solve.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An implementation of a Lexical Functional Grammar (LFG) natural language front-end to a database is presented, and its capabilities demonstrated by reference to a set of queries used in the Chat-80 system. The potential of LFG for such applications is explored. Other grammars previously used for this purpose are briefly reviewed and contrasted with LFG. The basic LFG formalism is fully described, both as to its syntax and semantics, and the deficiencies of the latter for database access application shown. Other current LFG implementations are reviewed and contrasted with the LFG implementation developed here specifically for database access. The implementation described here allows a natural language interface to a specific Prolog database to be produced from a set of grammar rule and lexical specifications in an LFG-like notation. In addition to this the interface system uses a simple database description to compile metadata about the database for later use in planning the execution of queries. Extensions to LFG's semantic component are shown to be necessary to produce a satisfactory functional analysis and semantic output for querying a database. A diverse set of natural language constructs are analysed using LFG and the derivation of Prolog queries from the F-structure output of LFG is illustrated. The functional description produced from LFG is proposed as sufficient for resolving many problems of quantification and attachment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Strategic planning and more specifically, the impact of strategic planning on organisational performance has been the subject of significant academic interest since the early 1970's. However, despite the significant amount of previous work examining the relationship between strategic planning and organisational performance, a comprehensive literature review identified a number of areas where contributions to the domain of study could be made. In overview, the main areas for further study identified from the literature review were a) a further examination of both the dimensionality and conceptualisation of strategic planning and organisational performance and b) a further, multivariate, examination of the relationship between strategic planning and performance, to capture the newly identified dimensionality. In addition to the previously identified strategic planning and organisational performance constructs, a comprehensive literature based assessment was undertaken and five main areas were identified for further examination, these were a) organisational b) comprehensive strategic choice, c) the quality of strategic options generated, d) political behavior and e) implementation success. From this, a conceptual model incorporating a set of hypotheses to be tested was formulated. In order to test the conceptual model specified and also the stated hypotheses, data gathering was undertaken. The quantitative phase of the research involved a mail survey of senior managers in medium to large UK based organisations, of which a total of 366 fully useable responses were received. Following rigorous individual construct validity and reliability testing, the complete conceptual model was tested using latent variable path analysis. The results for the individual hypotheses and also the complete conceptual model were most encouraging. The findings, theoretical and managerial implications, limitations and directions for future research are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.