934 resultados para South Asian literature--Early works to 1800


Relevância:

100.00% 100.00%

Publicador:

Resumo:

SCAR KGIS (SCAR King George Island GIS Project) was an integrated topographic database for King George Island, South Shetland Islands, including the SCAR Feature Catalogue to semantically integrate the data sets. The project, operated by the University of Freiburg, was available at http://portal.uni-freiburg.de/AntSDI as "The Antarctic Spatial Data Infrastructure (AntSDI)". Operation ended in 2007. The remaining data files were archived in shape format (zipped) in projections as recommended by SCAR. The source data was provided by a variety of institutions which were not referenced in the original product.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.