867 resultados para Safety, Construction management, Statistics


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Phase II project follows a previous project titled Strategies to Address Nighttime Crashes at Rural, Unsignalized Intersections. Based on the results of the previous study, the Iowa Highway Research Board (IHRB) indicated interest in pursuing further research to address the quality of lighting, rather than just the presence of light, with respect to safety. The research team supplemented the literature review from the previous study, specifically addressing lighting level in terms of measurement, the relationship between light levels and safety, and lamp durability and efficiency. The Center for Transportation Research and Education (CTRE) teamed with a national research leader in roadway lighting, Virginia Tech Transportation Institute (VTTI) to collect the data. An integral instrument to the data collection efforts was the creation of the Roadway Monitoring System (RMS). The RMS allowed the research team to collect lighting data and approach information for each rural intersection identified in the previous phase. After data cleanup, the final data set contained illuminance data for 101 lighted intersections (of 137 lighted intersections in the first study). Data analysis included a robust statistical analysis based on Bayesian techniques. Average illuminance, average glare, and average uniformity ratio values were used to classify quality of lighting at the intersections.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: Clinical indicators are increasingly used to assess safety of patient care. In obstetrics, only a few indicators have been validated to date and none is used across specialties. The purpose of this study was to identify and assess for face and content validity a group of safety indicators that could be used by anaesthetists, obstetricians and neonatologists involved in labour and delivery units. MATERIALS AND METHODS: We first conducted a systematic review of the literature to identify potential measures. Indicators were then validated by a panel of 30 experts representing all specialties working in labour and delivery units. We used the Delphi method, an iterative questionnaire-based consensus seeking technique. Experts determined on a 7-point Likert scale (1=most representative/7=less representative) the soundness of each indicator as a measure of safety and their possible association with errors and complications caused by medical management. RESULTS: We identified 44 potential clinical indicators from the literature. Following the Delphi process, 13 indicators were considered as highly representative of safety during obstetrical care (mean score</=2.3). Experts ranked 6 of these indicators as being strongly associated to potential errors and complications. CONCLUSIONS: We identified and validated for face and content, a group of six clinical indicators to measure potentially preventable iatrogenic complications in labour and delivery units.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

BACKGROUND: Chemotherapy is prescribed according to protocols of several cycles. These protocols include not only therapeutic agents but also adjuvant solvents and inherent supportive care measures. Multiple errors can occur during the prescription, the transmission of documents and the drug delivery processes, and lead to potentially serious consequences. OBJECTIVE: To assess the effect of a computerised physician order entry (CPOE) system on the number of errors in prescription recorded by the centralised chemotherapy unit of a pharmacy service in a university hospital. PATIENTS AND METHODS: Existing chemotherapy protocols were standardised by a multidisciplinary team (composed of a doctor, a pharmacist and a nurse) and a CPOE system was developed from a File Maker Pro database. Chemotherapy protocols were progressively introduced into the CPOE system. The effect of the system on prescribing errors was measured over 15 months before and 21 months after starting computerised protocol prescription. Errors were classified as major (dosage and drug name) and minor (volume or type of infusion solution). RESULTS: Before computerisation, 141 errors were recorded for 940 prescribed chemotherapy regimens (15%). After introduction of the CPOE system, 75 errors were recorded for 1505 prescribed chemotherapy regimens (5%). Of these errors, 69 (92%) were recorded in prescriptions that did not use a computerised protocol. A dramatic decrease in the number of errors was noticeable when 50% of the chemotherapy protocols were prescribed through the CPOE system. CONCLUSION: Errors in chemotherapy prescription nearly disappeared after implementation of CPOE. The safety of chemotherapy prescription was markedly improved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Switzerland, the land management regime is characterized by a liberal attitude towards the institution of property rights, which is guaranteed by the Constitution. Under the present Swiss constitutional arrangement, authorities (municipalities) are required to take into account landowners' interests when implementing their spatial planning policy. In other words, the institution of property rights cannot be restricted easily in order to implement zoning plans and planning projects. This situation causes many problems. One of them is the gap between the way land is really used by the landowners and the way land should be used based on zoning plans. In fact, zoning plans only describe how landowners should use their property. There is no sufficient provision for handling cases where the use is not in accordance with zoning plans. In particular, landowners may not be expropriated for a non-conforming use of the land. This situation often leads to the opening of new building areas in greenfields and urban sprawl, which is in contradiction with the goals set into the Federal Law on Spatial Planning. In order to identify legal strategies of intervention to solve the problem, our paper is structured into three main parts. Firstly, we make a short description of the Swiss land management regime. Then, we focus on an innovative land management approach designed to implement zoning plans in accordance with property rights. Finally, we present a case study that shows the usefulness of the presented land management approach in practice. We develop three main results. Firstly, the land management approach brings a mechanism to involve landowners in planning projects. Coordination principle between spatial planning goals and landowners' interests is the cornerstone of all the process. Secondly, the land use is improved both in terms of space and time. Finally, the institution of property rights is not challenged, since there is no expropriation and the market stays free.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Quantitative information from magnetic resonance imaging (MRI) may substantiate clinical findings and provide additional insight into the mechanism of clinical interventions in therapeutic stroke trials. The PERFORM study is exploring the efficacy of terutroban versus aspirin for secondary prevention in patients with a history of ischemic stroke. We report on the design of an exploratory longitudinal MRI follow-up study that was performed in a subgroup of the PERFORM trial. An international multi-centre longitudinal follow-up MRI study was designed for different MR systems employing safety and efficacy readouts: new T2 lesions, new DWI lesions, whole brain volume change, hippocampal volume change, changes in tissue microstructure as depicted by mean diffusivity and fractional anisotropy, vessel patency on MR angiography, and the presence of and development of new microbleeds. A total of 1,056 patients (men and women ≥ 55 years) were included. The data analysis included 3D reformation, image registration of different contrasts, tissue segmentation, and automated lesion detection. This large international multi-centre study demonstrates how new MRI readouts can be used to provide key information on the evolution of cerebral tissue lesions and within the macrovasculature after atherothrombotic stroke in a large sample of patients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Traffic safety engineers are among the early adopters of Bayesian statistical tools for analyzing crash data. As in many other areas of application, empirical Bayes methods were their first choice, perhaps because they represent an intuitively appealing, yet relatively easy to implement alternative to purely classical approaches. With the enormous progress in numerical methods made in recent years and with the availability of free, easy to use software that permits implementing a fully Bayesian approach, however, there is now ample justification to progress towards fully Bayesian analyses of crash data. The fully Bayesian approach, in particular as implemented via multi-level hierarchical models, has many advantages over the empirical Bayes approach. In a full Bayesian analysis, prior information and all available data are seamlessly integrated into posterior distributions on which practitioners can base their inferences. All uncertainties are thus accounted for in the analyses and there is no need to pre-process data to obtain Safety Performance Functions and other such prior estimates of the effect of covariates on the outcome of interest. In this slight, fully Bayesian methods may well be less costly to implement and may result in safety estimates with more realistic standard errors. In this manuscript, we present the full Bayesian approach to analyzing traffic safety data and focus on highlighting the differences between the empirical Bayes and the full Bayes approaches. We use an illustrative example to discuss a step-by-step Bayesian analysis of the data and to show some of the types of inferences that are possible within the full Bayesian framework.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado) on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil) for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira) since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado). In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD) and geometric mean diameter (GMD). Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC) and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower organic matter content. However, the percentage of larger aggregates was higher in the native vegetation treatment, which boosted MWD and GMD values. Therefore, assessment of some land use and management systems show that even decades after their implementation to mitigate the degenerative effects resulting from the installation of the Hydroelectric Plant, more efficient approaches are still required to recover the structural quality of the soil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pancreaticoduodenectomy is a major procedure in visceral surgery. Post-operative mortality is around 5% in high-volume hospitals, thanks to improvement in global patients care. Morbidity remains high though. The treatment of complications most often require a multidisciplinary approach. Delayed gastric emptying, intraabdominal abscesses and pancreatic fistulas are the most frequent complications. Post-pancreatectomy hemorrhage, although more rare, is a severe and dreadful event. Despite its morbidity, duodenopancreatectomy significantly improves survival of patients with biliopancreatic cancer. Early recognition of these complications and a prompt treatment increase the safety of this procedure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Geographic information systems (GIS) and artificial intelligence (AI) techniques were used to develop an intelligent snow removal asset management system (SRAMS). The system has been evaluated through a case study examining snow removal from the roads in Black Hawk County, Iowa, for which the Iowa Department of Transportation (Iowa DOT) is responsible. The SRAMS is comprised of an expert system that contains the logical rules and expertise of the Iowa DOT’s snow removal experts in Black Hawk County, and a geographic information system to access and manage road data. The system is implemented on a mid-range PC by integrating MapObjects 2.1 (a GIS package), Visual Rule Studio 2.2 (an AI shell), and Visual Basic 6.0 (a programming tool). The system could efficiently be used to generate prioritized snowplowing routes in visual format, to optimize the allocation of assets for plowing, and to track materials (e.g., salt and sand). A test of the system reveals an improvement in snowplowing time by 1.9 percent for moderate snowfall and 9.7 percent for snowstorm conditions over the current manual system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Transportation agencies in Iowa are responsible for a significant public investment with the installation and maintenance of traffic control devices and pavement markings. Included in this investment are thousands of signs and other inventory items, equipment, facilities, and staff. The proper application of traffic control devices and pavement markings is critical to public safety on streets and highways, and local governments have a prescribed responsibility under the Code of Iowa to properly manage these assets. This research report addresses current traffic control and pavement marking application, maintenance, and management in Iowa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Roadside cross-drainage culverts have been found to impact vehicle accident injury levels. Designers have commonly used three safety treatments to protect errant drivers from culvert accidents. These treatments have included: culvert extension, guardrail installation and grating. In order to define which safety treatment is the most appropriate, benefit-cost analysis has used accident cost reduction to estimate societal gains earned by using any safety treatment. The purpose of this study was to estimate accident costs for a wide range of roadway and roadside characteristics so that designers can calculate benefit/cost ratios for culvert safety treatment options under any particular scenario. This study began with conducting a parametric study in order to find variables which have significant impact on accident cost changes. The study proceeded with highway scenario modeling which included scenarios with different values for combinations of roadway and roadside variables. These variables were chosen based upon findings from the parametric study and their values were assigned based upon highway classification. This study shows that the use of different culvert safety treatments should be flexible to roadway and roadside characteristics. It also shows that culvert extension and grating were the safety treatments found to produce the lowest accident costs for all highway scenarios modeled. Therefore, it is believed that the expanded adoption of culvert extension and culvert grates can improve overall highway safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Phase II project follows a previous project titled Strategies to Address Nighttime Crashes at Rural, Unsignalized Intersections. Based on the results of the previous study, the Iowa Highway Research Board (IHRB) indicated interest in pursuing further research to address the quality of lighting, rather than just the presence of light, with respect to safety. The research team supplemented the literature review from the previous study, specifically addressing lighting level in terms of measurement, the relationship between light levels and safety, and lamp durability and efficiency. The Center for Transportation Research and Education (CTRE) teamed with a national research leader in roadway lighting, Virginia Tech Transportation Institute (VTTI) to collect the data. An integral instrument to the data collection efforts was the creation of the Roadway Monitoring System (RMS). The RMS allowed the research team to collect lighting data and approach information for each rural intersection identified in the previous phase. After data cleanup, the final data set contained illuminance data for 101 lighted intersections (of 137 lighted intersections in the first study). Data analysis included a robust statistical analysis based on Bayesian techniques. Average illuminance, average glare, and average uniformity ratio values were used to classify quality of lighting at the intersections.