835 resultados para Project portfolio management (ppm)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Acid mine drainage (AMD) is a widespread environmental problem associated with both working and abandoned mining operations. As part of an overall strategy to determine a long-term treatment option for AMD, a pilot passive treatment plant was constructed in 1994 at Wheat Jane Mine in Cornwall, UK. The plant consists of three separate systems; each containing aerobic reed beds, anaerobic cell and rock filters, and represents the largest European experimental facility of its kind. The systems only differ by the type of pre-treatment utilised to increase the pH of the influent minewater (pH<4): lime-dosed (LD), anoxic limestone drain (ALD) and lime free (LF), which receives no form of pre-treatment. The Wheal Jane pilot plant offered a unique facility and a major research project was established to evaluate the pilot plant and study in detail the biological mechanisms and the geochemical and physical processes that control passive treatment systems. The project has led to data, knowledge, models and design criteria for the future design, planning and sustainable management of passive treatment systems. A multidisciplinary team of scientists and managers from the U.K. universities, the Environment Agency and the Mining Industry has been put together to obtain the maximum advantage from the excellent facilities facility at Wheal Jane. (C) 2004 Elseaier B.V All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private development consisting of an extension to an existing building to provide a wholesale butchery facility. The project used a conventionally organized management process. The organization structure adopted on the project is analysed using concepts from the systems theory, which are included in Walkers theoretical model of the structure of building project organizations. This model proposes that the process of building provision can be viewed as systems and sub-systems that are differentiated from each other at decision points. Further to this, the sub-systems can be viewed as the interaction of managing system and operating system. Using Walkers model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. The project's organization structure diverged from the models propositions resulting in delay to the project's completion and cost overrun but the client was satisfied with the project functionally.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The PhD process is uncertain, idiosyncratic and vague. Research into the management of PhDs has proved very useful for supervisors and students. It is important for everyone involved in the process to be aware of what can be done to improve the likelihood of success for PhD studies. There are many ways of tackling a PhD and it is not possible to describe construction management as a generic type of study. Rather, construction management is a source of problems and data, whereas solutions and approaches need to be based within established academic disciplines. The clear definition of a research project is an essential prerequisite for success. Although PhDs are difficult, there are many things that can be done by departments, supervisors and students to ease the difficulties. In the long run, the development of an active and dynamic research community is dependent upon a steady flow of high quality PhDs. No-one benefits from an uncompleted or failed PhD.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The context of construction management (CM) reveals that this method of procurement is as much a management philosophy as a contract structure. It is important to consider legal and contractual issues in this context. The interplay between management and law is complex and often misunderstood. Before considering specific issues, the use of contractual remedies in business agreements is discussed. In addition, the extent to which standardising a form of contract detracts or contributes to the success of projects is also considered. The dearth of judicial decisions, and the lack of a standard form, render it difficult to be specific about legal issues. Therefore, the main discussion of legal issues is centred around a recently completed research project which involved eliciting the views of a cross-section of experienced construction management clients, consultants and trade contractors. These interviews are used as the basis for highlighting some of the most important legal points to consider when setting up CM projects. The interviews revealed that the advantage of CM is the proximity of the client to the trade contractors and the disadvantage is that it depends on a high degree of professionalism and experience; qualities which are unfortunately difficult to find in the UK construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the rapid development in technology over recent years, construction, in common with many areas of industry, has become increasingly complex. It would, therefore, seem to be important to develop and extend the understanding of complexity so that industry in general and in this case the construction industry can work with greater accuracy and efficiency to provide clients with a better service. This paper aims to generate a definition of complexity and a method for its measurement in order to assess its influence upon the accuracy of the quantity surveying profession in UK new build office construction. Quantitative data came from an analysis of twenty projects of varying size and value and qualitative data came from interviews with professional quantity surveyors. The findings highlight the difficulty in defining and measuring project complexity. The correlation between accuracy and complexity was not straightforward, being subjected to many extraneous variables, particularly the impact of project size. Further research is required to develop a better measure of complexity. This is in order to improve the response of quantity surveyors, so that an appropriate level of effort can be applied to individual projects, permitting greater accuracy and enabling better resource planning within the profession.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Consider the statement "this project should cost X and has risk of Y". Such statements are used daily in industry as the basis for making decisions. The work reported here is part of a study aimed at providing a rational and pragmatic basis for such statements. Of particular interest are predictions made in the requirements and early phases of projects. A preliminary model has been constructed using Bayesian Belief Networks and in support of this, a programme to collect and study data during the execution of various software development projects commenced in May 2002. The data collection programme is undertaken under the constraints of a commercial industrial regime of multiple concurrent small to medium scale software development projects. Guided by pragmatism, the work is predicated on the use of data that can be collected readily by project managers; including expert judgements, effort, elapsed times and metrics collected within each project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

iLearn is a Web 2.0 tool developed in Blackboard to help students with Personal Development Planning (PDP). This paper describes a case study on how the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP benefits the students. The e-Portfolio tool benefits students as it enables them to create and share portfolios, record achievements and reflections that support future job applications and promotion. Students find it beneficial because they can make use of iLearn e-Portfolio to keep academic records and achievements, activities and interests, work experience, reflective practice, employer information and some other useful resources, and also to tailor their CV and covering letters including evidence to support their CV, transferable skills and selling points. Useful information for preparing for an interview, reflecting after an event and any thoughts and evaluation can be kept in iLearn e-Portfolio. Keeping assessment and feedback records in iLearn e-Portfolio enables students to know their progress, to identify any gaps they need to fill to develop their study practices and areas for development. The key points from the feedback on the assignments and assessments are beneficial for future improvement. The reflections on the assignments and how students make use of the advice are particularly useful to improve their overall performance. In terms of pedagogical benefits, the “Individual Learner Profile” records and reviews evidence in verbal communication, basic and higher academic skills, time management, numeracy skill and IT skills, students become increasingly aware of their own strengths and any weaker areas that may require development. The e-Portfolio also provides opportunity for students to reflect on the experience and skills they have gained whilst participating in activities outside their studies. As the iLearn e-Portfolio is a reflective practice tool, it is consistent with the principle of Schon's reflective practitioner to reframe problems and to explore the consequences of actions. From the students’ feedback, for those who engage regularly in iLearn, they are better able to set agendas for their Personal Tutorial meetings and provide their Personal Tutor with a unique record of their achievements, skills and attributes which help them writing effective references for them. They make the most of their student experience in general. They also enhance their transferable skills and employability overall. The iLearn e-Portfolio prepares for the workplace and life beyond University including continuing professional development. Students are aware of their transferable skills, evidence of the skills and skill level, including award or accreditation, and their personal reflection on their transferable skills. It is beneficial for students to be aware of their transferable skills, to produce evidence of the skills and skills level such as award and accreditation, and to record their personal reflection on their transferable skills. Finally, the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP will improve their employability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to focus on the intellectual property (IP) aspects of mergers and acquisitions (M&A) transactions. Design/methodology/approach – A holistic approach is proposed that embraces IP as an integral part of the M&A process in the form of a roadmap for the strategic and purposeful management of IP assets in M&A deals. Findings – Addressing IP issues in transactions in isolation can lead to undesirable consequences (e.g. considerable costs for unplanned purchases of rights). IP due diligence and IP integration project processes can be automated using collaborative software solutions. Thereby, risk can be reduced through the creation of a high level of transparency and predefined responsibilities. Practical implications – Although the proposed IP management framework is based on intellectual property matters relevant to German jurisdiction, conclusions derived and the proposed roadmap are transferable to other jurisdictions and hence have a broader relevance. Evidence for this is provided by the successful application of the roadmap in the context of the multinational transaction stated above. Originality/value – This paper is based on the authors' collective experience, insight and reflected observation of M&A practice gained in advisory M&A roles in management consultancies over a period of more than a decade. The paper summarizes the authors' reflections and observations and brings these into the context of the current management literature. Moreover, this paper builds on earlier published research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

iLearn is a quasi-Web 2.0 tool developed in Blackboard to help users with Personal Development Planning (PDP). This paper describes a case study on how the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP benefits the users, who are training to be professionals in construction management and surveying, The e-Portfolio tool benefits users as it enables them to create and share portfolios, record achievements and reflections that support future job applications and promotion. Users find it beneficial because they can make use of iLearn e-Portfolio to keep academic records and achievements, activities and interests, work experience, reflective practice, employer information and some other useful resources, and also to tailor their CV and covering letters including evidence to support their CV, transferable skills and selling points. Useful information for preparing for an interview, reflecting after an event and any thoughts and evaluation can be kept in iLearn e-Portfolio. Keeping assessment and feedback records in iLearn e-Portfolio enables learners to know their progress, to identify any gaps they need to fill to develop their study practices and areas for development. The key points from the feedback on the assignments and assessments are beneficial for future improvement. The reflections on the tasks and how they make use of the advice are particularly useful to improve their overall performance. In terms of pedagogical benefits, the “Individual Learner Profile” records and reviews evidence in verbal communication, basic and higher academic skills, time management, numeracy skill and IT skills, learners become increasingly aware of their own strengths and any weaker areas that may require development. The e-Portfolio also provides opportunity for them to reflect on the experience and skills they have gained whilst participating in activities outside their studies. As the iLearn e-Portfolio is a reflective practice tool, it is consistent with the principle of Schon's reflective practitioner to reframe problems and to explore the consequences of actions. From the users’ feedback, for those who engage regularly in iLearn, they are better able to set agendas for their supervision meetings and provide their supervisor with a unique record of their achievements, skills and attributes which help them writing effective references for them. They make the most of their learning experience in general. They also enhance their transferable skills and employability overall. The iLearn e-Portfolio prepares them for the workplace including continuing professional development. Users are aware of their transferable skills, evidence of the skills and skill level, including award or accreditation, and their personal reflection on their transferable skills. It is beneficial for them to be aware of their transferable skills, to produce evidence of the skills and skills level such as award and accreditation, and to record their personal reflection on their transferable skills. Finally, the innovative use of mobile digital technology in iLearn e-Portfolio for developing reflective portfolios for PDP will improve their employability.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction materials and equipment are essential building blocks of every construction project and may account for 50-60 per cent of the total cost of construction. The rate of their utilization, on the other hand, is the element that most directly relates to a project progress. A growing concern in the industry that inadequate efficiency hinders its success could thus be accommodated by turning construction into a logistic process. Although mostly limited, recent attempts and studies show that Radio Frequency IDentification (RFID) applications have significant potentials in construction. However, the aim of this research is to show that the technology itself should not only be used for automation and tracking to overcome the supply chain complexity but also as a tool to generate, record and exchange process-related knowledge among the supply chain stakeholders. This would enable all involved parties to identify and understand consequences of any forthcoming difficulties and react accordingly before they cause major disruptions in the construction process. In order to achieve this aim the study focuses on a number of methods. First of all it develops a generic understanding of how RFID technology has been used in logistic processes in industrial supply chain management. Secondly, it investigates recent applications of RFID as an information and communication technology support facility in construction logistics for the management of construction supply chain. Based on these the study develops an improved concept of a construction logistics architecture that explicitly relies on integrating RFID with the Global Positioning System (GPS). The developed conceptual model architecture shows that categorisation provided through RFID and traceability as a result of RFID/GPS integration could be used as a tool to identify, record and share potential problems and thus vastly improve knowledge management processes within the entire supply chain. The findings thus clearly show a need for future research in this area.