868 resultados para Project management Computer programs
Resumo:
Awareness of climate change and adaptations of building stock play a key role in the UK government’s environmental agenda. While some European countries and countries like Japan move forward by bringing their sustainability agenda to the public sector, the UK seems to be slow in embracing these ideas and long term sustainability in improved products and processes for better performance, efficiency and innovative application of renewable technology is yet to come. While funding remains a major constraint research show that a number of detrimental issues including; organisation, risk, mind sets of the stakeholders, planning constraints, reluctance to accept change and the unexploited markets are major contributing factors. Most of these barriers can be overcome with research, development and information and knowledge transfer techniques. Educating all stakeholders can act as an accelerator for innovation. This paper examines innovation in the built environment and how research and education can stimulate this process. It explores drivers and barriers for innovation and how research and education in construction, design, engineering and project management can enhance this process. It presents and discusses lessons learnt from two action research projects in relation to innovation.
Resumo:
Design-build experiences (DBEs) are an essential element of any programme based on the CDIO methodology. They enable students to develop practical hands-on skills, they enable the learning of theory by stealth and they provide a forum for developing professional skills such as team working and project management. The hands-on aspect of certain DBEs has significant risk associated with it, which must be addressed through the formal evaluation of risks and the development of a methodology for controlling them. This paper considers the aspects of design-build experiences that may impact on student safety. In particular, it examines the risk associated with each of the four stages of CDIO and gives examples of risks which may commonly apply across engineering disciplines. A system for assessing and controlling the risks in any particular DBE is presented and the paper finishes by discussing the significance of health and safety in the educational environment.
Resumo:
This paper discusses the calculation of electron impact collision strengths and effective collision strengths for iron peak elements of importance in the analysis of many astronomical and laboratory spectra. It commences with a brief overview of R-matrix theory which is the basis of computer programs which have been widely used to calculate the relevant atomic data used in this analysis. A summary is then given of calculations carried out over the last 20 y for electron collisions with Fe II. The grand challenge, represented by the calculation of accurate collision strengths and effective collision strengths for this ion, is then discussed. A new parallel R-matrix program PRMAT, which is being developed to meet this challenge, is then described and results of recent calculations, using this program to determine optically forbidden transitions in e- – Ni IV on a Cray T3E-1200 parallel supercomputer, are presented. The implications of this e- – Ni IV calculation for the determination of accurate data from an isoelectronic e- – Fe II calculation are discussed and finally some future directions of research are reviewed.
Resumo:
In the aftermath of recent natural disasters, NGOs have become increasingly involved in the permanent reconstruction of affected communities. These organizations, often operating well outside their expertise, encounter significant barriers as they implement reconstruction programmes. This paper presents the theoretical bedrock of a current research project, the overall goal of which is to design a competency-based framework model that can be used by NGOs in post-disaster reconstruction projects. Drawing on established theories of management, a unique perspective has been developed from which a competency-based reconstruction theory emerges. This theoretical framework brings together three distinct fields; Disaster Management, Strategic Management and Project Management, each vital to the success of the model. This theoretical study will incorporate a critical review of literature within each field. It is imperative that NGOs involved in post-disaster reconstruction familiarize themselves with concepts and strategies. It is hoped that the competence-based frame-work model that is produced on the basis of this theory will help define the standard of best practice to which future NGO projects might align themselves.
Resumo:
The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.
Resumo:
Natural hazards trigger disasters, the scale of which is largely determined by vulnerability. Developing countries suffer the most from disasters due to various conditions of vulnerability which exist and there is an opportunity after disasters to take mitigative action. NGOs implementing post-disaster rehabilitation projects must be able to address the issues causing communities to live at risk of disaster and therefore must build dynamic capacity, capabilities and competencies, enabling them to operate in unstable environments. This research is built upon a theoretical framework of dynamic competency established by combining elements of disaster management, strategic management and project management theory. A number of NGOs which have implemented reconstruction and rehabilitation projects both in Sri Lanka following the Asian Tsunami and Bangladesh following Cyclone Sidr are being investigated in great depth using a causal mapping procedure. ‘Event’ specific maps have been developed for each organization in each disaster. This data will be analysed with a view to discovering the strategies which lead to vulnerability reduction in post-disaster communities and the competencies that NGOs must possess in order to achieve favourable outcomes. It is hypothesized that by building organizational capacity, capabilities and competencies to be dynamic in nature, while focusing on a more emergent strategic approach, with emphasis on adaptive capability and innovation, NGOs will be better equipped to contribute to sustainable community development through reconstruction. We believe that through this study it will be possible to glean a new understanding of social processes that emerge within community rehabilitation projects.
Resumo:
The construction industry is inherently hazardous, with a significant number of accidents and incidents occurring, particularly on confined construction sites. This research identifies, clarifies and tabulates the various managerial health and safety issues encountered on confined construction sites, based on a qualitative approach, to aid in the management of the complex health and safety concerns. The methodology is based on qualitative research incorporating case studies, interviews, causal loop diagrams and mind mapping. The key findings in the managerial issues in the management of health and safety on confined construction sites can be summarised as follows; (1) A lack of space, (2) Increased management of site personnel, (3) Overcrowding of the work place. The implication for the industry is that due to the sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters. The value of such research is to aid management professionals successfully identify the various managerial issues highlighted, resulting in the successful management of health and safety on a confined construction site.
Resumo:
Increased globalisation within the British AEC (Architectural, Engineering and Construction) sector has increased the need for companies to transfer staff to manage their overseas operations. To be able to perform abroad, expatriates must harmonise themselves to the conditions prevailing in the host country. These include getting accustomed to living, working and interacting with the host country nationals. The process is commonly referred to as 'cross-cultural adjustment'. Various factors influence the process of adjustment. In order to identify these issues, a qualitative study was undertaken, which mainly comprised of comprehensive literature review, individual interviews and focus group discussion with British expatriates working on international AEC assignments in Middle Eastern countries. Through interpretative approach, the current study aims to understand the concept of cross-cultural adjustment of British Expatriates based in Middle East and their influencing factors.
The findings suggest that success of expatriation does not entirely rest on an expatriate's ability but also on organisational support and assistance that expatriates receive prior to and during the assignment. Organisational factors such as selection mechanisms, job design, training, logistical and social support, mentoring, etc., influence various facets of expatriate adjustment. Striking cultural contrasts between British and Arab culture both in work and non work situations also dictate the level of support required by the expatriate, suggesting that relocation to less developed, remote or politically unstable regions, demands additional support and consideration by the parent company. This study is relevant to the AEC companies employing British expatriates, who need to be cognisant of the issues highlighted above to make rational and informed decisions when handling international assignments in the Middle East.
Resumo:
Inner city, confined site construction is quickly becoming the norm within the construction sector. The aim of this paper is to identify and document the effect, if any, that a confined construction site environment has on the productivity of on-site personnel. In order to compile the relevant information and attain appropriate results on the matter in question, a qualitative analytical approach is adopted. This process incorporates multiple cases studies from Ireland, Northern Ireland and USA. From the resulting case studies, a minimum of three individual interviews and focus group seminars are conducted to aid in the collection of the data while also assisting in the confirmation of the factors identified from a critique of the relevant literature. From the resulting case studies and discussions, a list of the key issues pertaining to the on-site productivity of personnel emerged and is documented as follows; 1) Overcrowding of personnel at workstations, 2) Lack of space for the effective movement of personnel on-site, 3) Numerous trades working within the one space on-site. Through identifying the issues highlighted and proactively mitigating or eliminating the factors detailed, on-site management professionals can strive to ensure maximum productivity from the industry’s most important resource – people.