814 resultados para Project 2002-035-C : Linking Best-Value Procurement Assessment to Outcome Performance Indicators
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.
Resumo:
Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A ‘scoping study' has recently been undertaken to determine the ‘state-of-the-art’ of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.
Resumo:
The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
The impact of relations between an organization and its workers and the relations among workers on individual knowledge generation and sharing practices has not, to date, been addressed in an integrated way. This paper discusses the findings of a study analyzing issues at macro, locally-constructed and micro levels in a public sector organization, to identify and integrate the complex sets of mediators. Key factors were found to include (a) the contested nature of the process of knowledge construction, (b) the worker’s experience of the organization’s internal environment, (c) how the organization is understood to value knowledge sharing, (d) relations with colleagues, and (e) the perceived outcomes of knowledge sharing behaviors. Implications for practice are discussed.
Resumo:
Survey results provide a preliminary assessment of the relative contribution of a range of tactical business strategies to innovation performance by firms in the Australian construction industry. Over 1,300 firms were surveyed in 2004, resulting in a response rate of 29%. Respondents were classified as high, medium or low innovators according to an innovation index based on the novelty and impact of their innovations and their adoption of listed technological and organizational advances. The relative significance of 23 business strategies concerning (1) employees, (2) marketing, (3) technology, (4) knowledge and (5) relationships was examined by determining the extent to which they distinguished high innovators from low innovators. The individual business strategies that most strongly distinguished high innovators were (1) ‘investing in R&D’, (2) ‘participating in partnering and alliances on projects’, (3) ‘ensuring project learnings are transferred into continuous business processes’, (4) ‘monitoring international best practice’, and (5) ‘recruiting new graduates’. Of the five types of strategies assessed, marketing strategies were the least significant in supporting innovation. The results provide practical guidance to managers in project-based industries wishing to improve their innovation performance.
Resumo:
PROJECT BRIEF Information provided by the Built Environment Industry Innovation Council as background to this project includes the following information on construction and innovation within the industry. • The construction industry contributes around $67 billion to GDP and employs around 970,000 and generates exports of nearly $150 million. • The industry has one of the lowest innovation rates of any industry in Australia, ranking third last across all Australian industries in terms of its proportion of business expenditure on innovation, and second last in terms of the proportion of income generated from innovation (ABS, 2006). • Key innovation challenges include addressing energy and water use efficiency, and housing costs in preparing for the implementation of the Carbon Pollution Reduction Scheme. The sector will need to build its capability and capacity to deliver the technical and operational expertise required.The broader Built Environment Innovation Project aims to address the following two objectives: 1. Identify current innovative practice across the Built Environment industry. 2. Develop a knowledge exchange strategy for this information to be disseminated to all industry stakeholders. Industry practice issues are critical to the built environment industry’s ability to innovate, and the BRITE project from the CRC for Construction Innovation has previously undertaken work to identify the key factors that drive innovation. Part 1 of the current project aims to extend this work by conducting a stocktake of current and emerging innovative practices within the built environment industry. Part 2 of the project addresses the second of these objectives, that is, to recommend a knowledge exchange strategy for promoting the wider uptake of innovative practices that makes the information identified in Part 1 of the study (on emerging innovative practices) accessible to Australian built environment industry stakeholders. The project brief was for the strategy to include a mechanism to enable this information resource to be updated as new initiatives/practices are developed. A better understanding of the built environment industry’s own knowledge infrastructure also has the potential to enhance innovation outcomes for the industry. This project will develop a coordinated knowledge exchange strategy, informed by the best available information on current innovation practices within the industry and suggest directions for gaining a better understanding of: the industry contexts that lead to innovative practices; the industry (including enterprise and individual) drivers for innovation; and appropriate knowledge exchange pathways for delivering future industry innovation. A deliverable of Part 2 will be a recommendation for a knowledge exchange strategy to accelerate adoption of innovative practices in the built environment industry, including resource implications and how such a recommendation could be taken forward as an ongoing resource.