908 resultados para Proficiency Rating
Resumo:
This paper discusses the use of Jason-2 radar altimeter measurements to estimate the Ganga-Brahmaputra surface freshwater flux into the Bay of Bengal for the period mid-2008 to December 2011. A previous estimate was generated for 1993-2008 using TOPEX-Poseidon, ERS-2 and ENVISAT, and is now extended using Jason-2. To take full advantages of the new availability of in situ rating curves, the processing scheme is adapted and the adjustments of the methodology are discussed here. First, using a large sample of in situ river height measurements, we estimate the standard error of Jason-2-derived water levels over the Ganga and the Brahmaputra to be respectively of 0.28 m and 0.19 m, or less than similar to 4% of the annual peak-to-peak variations of these two rivers. Using the in situ rating curves between water levels and river discharges, we show that Jason-2 accurately infers Ganga and Brahmaputra instantaneous discharges for 2008-2011 with mean errors ranging from similar to 2180 m(3)/s (6.5%) over the Brahmaputra to similar to 1458 m(3)/s (13%) over the Ganga. The combined Ganga-Brahmaputra monthly discharges meet the requirements of acceptable accuracy (15-20%) with a mean error of similar to 16% for 2009-2011 and similar to 17% for 1993-2011. The Ganga-Brahmaputra monthly discharge at the river mouths is then presented, showing a marked interannual variability with a standard deviation of similar to 12500 m(3)/s, much larger than the data set uncertainty. Finally, using in situ sea surface salinity observations, we illustrate the possible impact of extreme continental freshwater discharge event on the northern Bay of Bengal as observed in 2008.
A nine-level inverter topology for medium-voltage induction motor drive with open-end stator winding
Resumo:
A new scheme for nine-level voltage space-vector generation for medium-voltage induction motor (IM) drives with open-end stator winding is presented in this paper. The proposed nine-level power converter topology consists of two conventional three-phase two-level voltage source inverters powered by isolated dc sources and six floating-capacitor-connected H-bridges. The H-bridge capacitor voltages are effectively maintained at the required asymmetrical levels by employing a space vector modulation (SVPWM) based control strategy. An interesting feature of this topology is its ability to function in five-or three-level mode, in the entire modulation range, at full-power rating, in the event of any failure in the H-bridges. This feature significantly improves the reliability of the proposed drive system. Each leg of the three-phase two-level inverters used in this topology switches only for a half cycle of the reference voltage waveform. Hence, the effective switching frequency is reduced by half, resulting in switching loss reduction in high-voltage devices. The transient as well as the steady-state performance of the proposed nine-level inverter-fed IM drive system is experimentally verified in the entire modulation range including the overmodulation region.
Resumo:
Before installation, a voltage source converter is usually subjected to heat-run test to verify its thermal design and performance under load. For heat-run test, the converter needs to be operated at rated voltage and rated current for a substantial length of time. Hence, such tests consume huge amount of energy in case of high-power converters. Also, the capacities of the source and loads available in the research and development (R&D) centre or the production facility could be inadequate to conduct such tests. This paper proposes a method to conduct heat-run tests on high-power, pulse width modulated (PWM) converters with low energy consumption. The experimental set-up consists of the converter under test and another converter (of similar or higher rating), both connected in parallel on the ac side and open on the dc side. Vector-control or synchronous reference frame control is employed to control the converters such that one draws certain amount of reactive power and the other supplies the same; only the system losses are drawn from the mains. The performance of the controller is validated through simulation and experiments. Experimental results, pertaining to heat-run tests on a high-power PWM converter, are presented at power levels of 25 kVA to 150 kVA.
Resumo:
In the process of service provisioning, providing required service to the user without user intervention, with reduction of the cognitive over loading is a real challenge. In this paper we propose a user centred context aware collaborative service provisioning system, which make use of context along with collaboration to provide the required service to the user dynamically. The system uses a novel approach of query expansion along with interactive and rating matrix based collaboration. Performance of the system is evaluated in Mobile-Commerce environment. The results show that the system is time efficient and perform with better precision and recall in comparison with context aware system.
Resumo:
The current work addresses the use of producer gas, a bio-derived gaseous alternative fuel, in engines designed for natural gas, derived from diesel engine frames. Impact of the use of producer gas on the general engine performance with specific focus on turbo-charging is addressed. The operation of a particular engine frame with diesel, natural gas and producer gas indicates that the peak load achieved is highest with diesel fuel (in compression ignition mode) followed by natural gas and producer gas (both in spark ignite mode). Detailed analysis of the engine power de-rating on fuelling with natural gas and producer gas indicates that the change in compression ratio (migration from compression to spark ignited mode), difference in mixture calorific value and turbocharger mismatch are the primary contributing factors. The largest de-rating occurs due to turbocharger mismatch. Turbocharger selection and optimization is identified as the strategy to recover the non-thermodynamic power loss, identified as the recovery potential (the loss due to mixture calorific value and turbocharger mismatch) on operating the engine with a fuel different from the base fuel. A turbocharged after-cooled six cylinder, 5.9 l, 90 kWe (diesel rating) engine (12.2 bar BMEP) is available commercially as a naturally aspirated natural gas engine delivering a peak load of 44.0 kWe (6.0 bar BMEP). The engine delivers a load of 27.3 kWe with producer gas under naturally aspirated mode. On charge boosting the engine with a turbocharger similar in configuration to the diesel engine turbocharger, the peak load delivered with producer gas is 36 kWe (4.8 bar BMEP) indicating a de-rating of about 60% over the baseline diesel mode. Estimation of knock limited peak load for producer gas-fuelled operation on the engine frame using a Wiebe function-based zero-dimensional code indicates a knock limited peak load of 76 kWe, indicating the potential to recover about 40 kWe. As a part of the recovery strategy, optimizing the ignition timing for maximum brake torque based on both spark sweep tests and established combustion descriptors and engine-turbocharger matching for producer gas-fuelled operation resulted in a knock limited peak load of 72.8 kWe (9.9 bar BMEP) at a compressor pressure ratio of 2.30. The de-rating of about 17.0 kWe compared to diesel rating is attributed to the reduction in compression ratio. With load recovery, the specific biomass consumption reduces from 1.2 kg/kWh to 1.0 kg/kWh, an improvement of over 16% while the engine thermal efficiency increases from 28% to 32%. The thermodynamic analysis of the compressor and the turbine indicates an isentropic efficiency of 74.5% and 73%, respectively.
Resumo:
Availability of producer gas engines at MW being limited necessitates to adapt engine from natural gas operation. The present work focus on the development of necessary kit for adapting a 12 cylinder lean burn turbo-charged natural gas engine rated at 900 kWe (Waukesha make VHP5904LTD) to operate on producer and set up an appropriate capacity biomass gasification system for grid linked power generation in Thailand. The overall plant configuration had fuel processing, drying, reactor, cooling and cleaning system, water treatment, engine generator and power evacuation. The overall project is designed for evacuation of 1.5 MWe power to the state grid and had 2 gasification system with the above configuration and 3 engines. Two gasification system each designed for about 1100 kg/hr of woody biomass was connected to the engine using a producer gas carburetor for the necessary Air to fuel ratio control. In the use of PG to fuel IC engines, it has been recognized that the engine response will differ as compared to the response with conventional fueled operation due to the differences in the thermo-physical properties of PG. On fuelling a conventional engine with PG, power de-rating can be expected due to the lower calorific value (LCV), lower adiabatic flame temperature (AFT) and the lower than unity product to reactant more ratio. Further the A/F ratio for producer gas is about 1/10th that of natural gas and requires a different carburetor for engine operation. The research involved in developing a carburetor for varying load conditions. The patented carburetor is based on area ratio control, consisting of a zero pressure regulator and a separate gas and air line along with a mixing zone. The 95 litre engine at 1000 rpm has an electrical efficiency of 33.5 % with a heat input of 2.62 MW. Each engine had two carburetors designed for producer gas flow each capable of handling about 1200 m3/hr in order to provide similar engine heat input at a lower conversion efficiency. Cold flow studies simulating the engine carburetion system results showed that the A/F was maintained in the range of 1.3 +/- 0.1 over the entire flow range. Initially, the gasification system was tested using woody biomass and the gas composition was found to be CO 15 +/- 1.5 % H-2 22 +/- 2% CH4 2.2 +/- 0.5 CO2 11.25 +/- 1.4 % and rest N-2, with the calorific value in the range of 5.0 MJ/kg. After initial trials on the engine to fine tune the control system and adjust various engine operating parameter a peak load of 800 kWe was achieved, while a stable operating conditions was found to be at 750 kWe which is nearly 85 % of the natural gas rating. The specific fuel consumption was found to be 0.9 kg of biomass per kWh.
Resumo:
Biocards are formal descriptions of biological phenomena and their underlying functional principles. They are used in bioinspired design to document search results and to communicate the findings for use in the further design process. The present study explored the effect of abstraction level used in biocards. This was done in two workshops conducted with design students in Denmark and India. Students were given a design assignment and instructions for how to perform the BID ideation work. Half of the students were given biocards with abstract descriptions while the other half got biocards with concrete descriptions. The novelty of found solutions was evaluated by the students by rating novelty of each solution on a scale from 1 to 5. Mean values for abstract descriptions were 0,3 higher than for concrete descriptions indicating that more innovative solutions were found when students used biocards with abstract descriptions compared to concrete descriptions. The difference in mean value is significant with a confidence level better than 1%. It seems likely that more abstract descriptions in biocards helps avoiding design fixation in biomimetic design work.
Resumo:
The middle reach of the Yangtze River, customarily called the Jingjiang River, together with its diversion channels and Dongting Lake, form a large complicated drainage system. In the last five decades, significant geomorphological changes have occurred in the drainage system, including the shrinkage of diversion channels, contraction of Dongting Lake, changes in the rating curve at the Luoshan station, and cutoffs of the lower Jingjiang River. These changes are believed to be the cause of the occurrence of abnormal floods in the Jingjiang River. Qualitative analyses suggest that the first three factors aggravate the flood situation in the lower Jingjiang River, while the last factor seems beneficial for flood prevention. To quantitatively evaluate these conclusions, a finite-volume numerical model was constructed. A series of numerical simulations were carried out to test the individual and combined effects of the aforementioned four factors, and these simulations showed that high flood stages in the Jingjiang River clearly are related to the geomorphological changes.
Resumo:
MELECON 2012 - 2012 16th IEEE Mediterranean Electrotechnical Conference, 25 Mar - 28 Mar 2012, Túnez
Resumo:
Background: Few studies have analyzed predictors of length of stay (LOS) in patients admitted due to acute bipolar manic episodes. The purpose of the present study was to estimate LOS and to determine the potential sociodemographic and clinical risk factors associated with a longer hospitalization. Such information could be useful to identify those patients at high risk for long LOS and to allocate them to special treatments, with the aim of optimizing their hospital management. Methods: This was a cross-sectional study recruiting adult patients with a diagnosis of bipolar disorder (Diagnostic and Statistical Manual of Mental Disorders, 4th edition, text revision (DSM-IV-TR) criteria) who had been hospitalized due to an acute manic episode with a Young Mania Rating Scale total score greater than 20. Bivariate correlational and multiple linear regression analyses were performed to identify independent predictors of LOS. Results: A total of 235 patients from 44 centers were included in the study. The only factors that were significantly associated to LOS in the regression model were the number of previous episodes and the Montgomery-Åsberg Depression Rating Scale (MADRS) total score at admission (P < 0.05). Conclusions: Patients with a high number of previous episodes and those with depressive symptoms during mania are more likely to stay longer in hospital. Patients with severe depressive symptoms may have a more severe or treatment-resistant course of the acute bipolar manic episode.
Resumo:
Increased boating activities and new waterfront developments have contributed an estimated 3,000 dismantled, abandoned, junked, wrecked, derelict vessels to Florida coastal waters. This report outlines a method of siting and prioritizing derelict vessel removal using the Florida Keys as a test area. The data base was information on 240 vessels, obtained from Florida Marine Patrol files. Vessel location was plotted on 1:250,000 regional and 1:5,000 and 1:12,000 site maps. Type of vessel, length, hull material, engine, fuel tanks, overall condition, afloat and submerged characteristics, and accessibility, were used to derive parametric site indices of removal priority and removal difficulty. Results indicate 59 top priority cases which should be the focus of immediate clean up efforts in the Florida Keys. Half of these cases are rated low to moderate in removal difficulty; the remainder are difficult to remove. Removal difficulty is a surrogate for removal cost: low difficulty -low cost, high difficulty - high cost. The rating scheme offers coastal planners options of focusing removal operations either on (1) specific areas with clusters of high priority derelict vessels or on (2) selected targeted derelicts at various, specific locations. (PDF has 59 pages.)
Resumo:
Real time monitoring allows the determination of the line state and the calculation of the actual rating value. The real time monitoring systems measure sag, conductor tension, conductor temperature or weather related magnitudes. In this paper, a new ampacity monitoring system for overhead lines, based on the conductor tension, the ambient temperature, the solar radiation and the current intensity, is presented. The measurements are transmitted via GPRS to a control center where a software program calculates the ampacity value. The system takes into account the creep deformation experienced by the conductors during their lifetime and calibrates the tension-temperature reference and the maximum allowable temperature in order to obtain the ampacity. The system includes both hardware implementation and remote control software.
Resumo:
8 p.
Resumo:
Background: This study aimed to examine factors associated with treatment adherence in first-episode psychosis (FEP) patients followed up over 8 years, especially involuntary first admission and stopping cannabis use. Methods: This prospective, longitudinal study of FEP patients collected data on symptoms, adherence, functioning,and substance use. Adherence to treatment was the main outcome variable and was categorized as ‘good’ or ‘bad’. Cannabis use during follow-up was stratified as continued use, stopped use, and never used. Bivariate and logistic regression models identified factors significantly associated with adherence and changes in adherence over the 8-year follow-up period. Results: Of the 98 FEP patients analyzed at baseline, 57.1% had involuntary first admission, 74.4% bad adherence,and 52% cannabis use. Good adherence at baseline was associated with Global Assessment of Functioning score (p = 0.019), Hamilton Depression Rating Scale score (p = 0.017) and voluntary admission (p < 0.001). Adherence patterns over 8 years included: 43.4% patients always bad, 26.1% always good, 25% improved from bad to good. Among the improved adherence group, 95.7% had involuntary first admission and 38.9% stopped cannabis use. In the subgroup of patients with bad adherence at baseline, involuntary first admission and quitting cannabis use during follow up were associated with improved adherence. Conclusions: The long-term association between treatment adherence and type of first admission and cannabis use in FEP patients suggest targets for intervention to improve clinical outcomes.
Resumo:
Rating enables the information asymmetry existing in the issuer-investor relationship to be reduced, particularly for issues with a high degree of complexity, as is the case of securitizations. However, there may be a serious conflict of interest between the issuer’s choice and remuneration of the agency and the credit rating awarded, resulting in lower quality and information power of the published rating. In this paper, we propose an explicative model of the number of ratings requested, by analyzing the relevance of the number of ratings to measure the reliability, where multirating is shown to be associated to the quality, size, liquidity and the degree of information asymmetry relating to the issue. Thus, we consider that the regulatory changes that foster the widespread publication of simultaneous ratings could help to alleviate the problem of rating model arbitrage and the crisis of confidence in credit ratings in general and in the securitization issues, in particular.