759 resultados para PRODUCCIÓN DE ENERGÍA ELÉCTRICA - COLOMBIA
Resumo:
In electric vehicles, passengers sit very close to an electric system of significant power. The high currents achieved in these vehicles mean that the passengers could be exposed to significant magnetic fields. One of the electric devices present in the power train are the batteries. In this paper, a methodology to evaluate the magnetic field created by these batteries is presented. First, the magnetic field generated by a single battery is analyzed using finite elements simulations. Results are compared to laboratory measurements, taken from a real battery, in order to validate the model. After this, the magnetic field created by a complete battery pack is estimated and results are discussed.
Resumo:
Frequency Response Analysis is a well-known technique for the diagnosis of power transformers. Currently, this technique is under research for its application in rotary electrical machines. This paper presents significant results on the application of Frequency Response Analysis to fault detection in field winding of synchronous machines with static excitation. First, the influence of the rotor position on the frequency response is evaluated. Secondly, some relevant test results are shown regarding ground fault and inter-turn fault detection in field windings at standstill condition. The influence of the fault resistance value is also taken into account. This paper also studies the applicability of Frequency Response Analysis in fault detection in field windings while rotating. This represents an important feature because some defects only appear with the machine rated speed. Several laboratory test results show the applicability of this fault detection technique in field windings at full speed with no excitation current.
Resumo:
New Fault-Resistance Estimation Algorithm for Rotor-Winding Ground-Fault Online Location in Synchronous Machines With Static Excitation
Resumo:
On-line partial discharge (PD) measurements have become a common technique for assessing the insulation condition of installed high voltage (HV) insulated cables. When on-line tests are performed in noisy environments, or when more than one source of pulse-shaped signals are present in a cable system, it is difficult to perform accurate diagnoses. In these cases, an adequate selection of the non-conventional measuring technique and the implementation of effective signal processing tools are essential for a correct evaluation of the insulation degradation. Once a specific noise rejection filter is applied, many signals can be identified as potential PD pulses, therefore, a classification tool to discriminate the PD sources involved is required. This paper proposes an efficient method for the classification of PD signals and pulse-type noise interferences measured in power cables with HFCT sensors. By using a signal feature generation algorithm, representative parameters associated to the waveform of each pulse acquired are calculated so that they can be separated in different clusters. The efficiency of the clustering technique proposed is demonstrated through an example with three different PD sources and several pulse-shaped interferences measured simultaneously in a cable system with a high frequency current transformer (HFCT).
Resumo:
This report analyzes the basis of hydrogen and power integration strategies, by using water electrolysis processes as a means of flexible energy storage at large scales. It is a prospective study, where the scope is to describe the characteristics of current power systems (like the generation technologies, load curves and grid constraints), and define future scenarios of hydrogen for balancing the electrical grids, considering the efficiency, economy and easiness of operations. We focus in the "Spanish case", which is a good example for planning the transition from a power system holding large reserve capacities, high penetration of renewable energies and limited interconnections, to a more sustainable energy system being capable to optimize the volumes, the regulation modes, the utilization ratios and the impacts of the installations. Thus, we explore a novel aspect of the "hydrogen economy" which is based in the potentials of existing power systems and the properties of hydrogen as energy carrier, by considering the electricity generation and demand globally and determining the optimal size and operation of the hydrogen production processes along the country; e.g. the cost production of hydrogen becomes viable for a base-load scenario with 58 TWh/year of power surplus at 0.025 V/kWh, and large number electrolyzer plants (50 MW) running in variable mode (1-12 kA/m2)
Resumo:
For the energy valorization of alperujo, residue of the olive oil two phases extraction process, it is necessary to perform a drying process to reduce moisture content from over 60% to less than 10%. In order to reduce primary energy consumption and get an economic return, usually in this kind of drying facilities Gas Turbine CHP is used as a heat source. There have been recently in Spain some fires in this kind of GT-CHP facilities, which have caused high material losses. In some of these fires it has been suggested that the fire was caused by the output of incandescent alperujo in the flue gasesof the drying system. Therefore, the aim of this study is to determine experimentally and analytically under which operational conditions a process of alperujo self-ignition in the drying process can begin, and determine the actual fire hazard in this type of TG-CHP system. For analytical study, the temperature and initial composition of the combustion gases of the Gas Turbine at the entrance of the drying process was calculated and the gas equilibrium conditions reached in contact with the biomass were calculated and, therefore, the temperature of the biomass during the drying process. Moreover, the layer and dust ignition temperature of alperujo has been experimentally determined, according to EN 50281-2-1: 2000. With these results, the operating conditions of the drying process, in which there are real risk of auto-ignition of alperujo have been established.Para la valorización energética del alperujo, residuo del proceso de extracción en dos fases del aceite de oliva, es necesario realizar un proceso de secado para reducir su contenido de humedad de más del 60% al 10% m/m en b.h. Con el fin de reducir el consumo de energía primaria y obtener una rentabilidad económica, normalmente en este tipo de instalaciones de secado se usa la cogeneración con turbina de gas (TG) como fuente de calor. En España en los últimos años han ocurrido algunos casos de incendio en este tipo de instalaciones de cogeneración, que han supuesto pérdidas materiales muy elevadas. Por esta razón, el objetivo de este trabajo es determinar analítica y experimentalmente las condiciones operativas del secadero bajo las cuales podría comenzar un proceso de autoinflamación del alperujo y determinar el riesgo real de incendio en este tipo de instalaciones. Para el estudio analítico, se ha planteado y validado el modelo matemático que permite calcular la temperatura y la composición de los gases de combustión a la entrada y a la salida del secadero, en función de las curvas características de la TG, de las condiciones atmosféricas, del caudal y del grado de humedad de la biomasa tratada. El modelo permite además calcular la temperatura de bulbo húmedo, que es la máxima temperatura que podría alcanzar la biomasa durante el proceso de secado y determinar la cantidad de biomasa que se puede secar completamente en función del caudal y de las condiciones de entrada de los gases de combustión. Con estos resultados y la temperatura mínima de autoinflamación del alperujo determinada experimentalmente siguiendo la norma EN 50281- 2-1:2000, se demuestra que en un proceso de secado de alperujo en condiciones normales de operación no existe riesgo de autoencendido que pueda dar origen a un incendio.
Resumo:
This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income.
Resumo:
Given the complex structure of electricity tariffs and their steady growth in Spanish, we've studied its effect over the operating costs of the wastewater treatment plants (WWTP), concluding that in the last three years the revisions of electricity rates have meant increases in electricity costs of 64.5% in the rate 3.1.A and 79.1% in the rate 6.1. This has caused the cost of electricity, which was the most important, has increased from a 44% of total operating costs in the year 2009, to more than a 56% in the year 2012.
Resumo:
La industria de bienes de capital es esencial para el desarrollo tecnológico y para garantizar un crecimiento económico a largo plazo sin restricciones externas. En el Brasil, después de un largo período de estancamiento, las inversiones volvieron a crecer a partir de 2003, dando nuevo impulso a la industria de bienes de capital. Sin embargo, se trata de una industria bastante heterogénea; mientras que en algunos sectores no se logró cubrir la expansión de la demanda, esto fue posible en otros que evidenciaron un elevado potencial tecnológico, como los proveedores de máquinas para las industrias del petróleo, la minería y la construcción, y los fabricantes de equipos de transporte y de generación y distribución de energía eléctrica. Esos sectores continuaron expandiéndose incluso en el período posterior a la crisis mundial de 2008 y casi no fueron afectados por la competencia internacional.
Resumo:
The Green Economy offers real possibilities for productive innovation, economic growth and employment creation in Spain. These three factors are critical to facilitate the necessary change in the productive model to overcome the crisis. However, the measures taken by the current Conservative government have moved in the opposite direction: significant cutting in incentives for renewable, increasing tax burden on renewable energy production to self-consumption and privatizing public spaces of social and environmental interest. This hinders the achievement of the environmental objectives of the Europe 2020 strategy. A strategy that is born already in itself highly limited, unambitious and subordinated to the interests of energy oligopolies and the imperatives of the Stability and Growth Pact (Maastricht) and the Austerity policies imposed from EU institutions to overcome the 2008 financial crisis. So the Ecological Transition goes further, claiming a substantially change in Economic Policy away form the increasing commodification proposed by the Green Economy. Despite these limitations, young and unemployed people have much to gain from a comprehensive development of environmental industries. Therefore, innovative-sustainable plans, investment and training in green sectors are necessary to make easier the transition from a services low-valued economy to an innovative and sustainable model to make our country an environmental reference in Europe.
Resumo:
GEA Consulting Engineers, acting as the design engineers, was hired by the owner, East Village 207 Residential LLC2 for energy modeling for compliance with LEED NC V3 -- This report details the results of the energy simulation done with the 100% construction documents -- This report only refers to entities within the LEED3 project boundary -- The project consists of a new eight-story high-end residential condominium building with 81 units, as shown in illustration 1, and approximately 117,905 GSF, equivalent to 10,953.73 m2, is located at 211 E 13th Street in New York, NY -- The residential portion of the building will function 24-7 -- The design goal is to utilize energy efficient measures to reduce electrical energy use and aims to achieve LEED certification -- LEED EA Credit 14 requires a building to demonstrate a percentage improvement in the proposed building performance compared with the baseline building -- The Credit rewards 1 point for achieving 12% reduction in energy costs -- Additionally, the Credit rewards another point for each subsequent reduction of 2% in the building’s energy cost
Resumo:
Este artículo estudia el impacto que la asimetría de información tiene sobre el mercado eléctrico no regulado colombiano desde una perspectiva teórica esta -- Se analizan los tratamientos que se han hecho en los principales mercados eléctricos internacionales para solucionar esta imperfección de mercado y, a la vez, analiza los resultados obtenidos, donde a partir de las experiencias se proporciona recomendaciones al mercado de energía colombiano -- También se analiza la Resolución CREG 035 de 2015 y el cambio que las modificaciones en esta traen para el funcionamiento del sector -- Los resultados obtenidos basados en las experiencias internacionales y la teoría económica indican que el mercado eléctrico colombiano está experimentando un problema de información asimétrica y esta nueva Resolución no ayuda a mitigarlo
Resumo:
In this paper, a general vision of cogeneration penetration in the European Union is shown; after this, a case study is included, evaluating as a function of two factors (electricity and emission allowance prices) the suitability of installing, for an industry with a determined thermal demand, two different options. The first one is a gas turbine cogeneration plant generating steam through a heat recovery steam generator (HRSG). The second one consists of installing a natural gas boiler for steam production covering the electricity demand from the grid. The CO2 emissions from both options are compared regarding different kinds of generation mixes from the electricity grid in the case of using the industrial boiler; taking into account the advantages of using biomass in relation to emissions, a last comparison has been carried out considering a biomass boiler instead of the natural gas boiler.
Resumo:
Este proyecto nace de la necesidad de tener energía eléctrica en cada hogar, debido al aumento de nuevos aparatos eléctricos, del aumento del coste de la energía por parte de las compañías eléctricas y de la inminente desaparición de los materiales fósiles como el petróleo o el carbón para la generación de electricidad. Para ello se crea este proyecto, para que comunidades de vecinos o viviendas aisladas, tengan la posibilidad de autoabastecerse de energía eléctrica. A pesar de un primer desembolso de dinero para su implantación, tras su implantación se verá reducida la factura de la luz. Este proyecto se compone de dos grandes subgrupos, la parte mecánica y la parte eléctrica o electrónica. De estas dos, nos hemos centrado en la parte mecánica. Que se descompone en varios subconjuntos que son; la base del aerogenerador, la jaula completa y el posicionamiento o la parte superior del aerogenerador. Cada subconjunto se divide en mas subconjunto y finalmente en cada componente. Para ello se ha realizado un pequeño estudio aerodinámico de las zonas ideales de colocación del aerogenerador, altura mínima de colocación para una optima generación. Por otra parte, para la elección del numero de alabes del rotor se ha tomado en cuenta un estudio realizado en un túnel de viento realizado por Ben F. Blackwell, Robert E. Sheldahl y Louis V. Feliz. En la que se llega a la conclusión que mas alabes no aumenta la eficiencia del aerogenerador. Por lo que se optó por un aerogenerador de dos alabes. Puesto que la eficiencia era pequeña debido a que cuando el aire golpea en un rotor desnudo, disminuye la velocidad de giro de éste por que el aire golpea en sus partes cóncavas y convexas generando fuerzas en sentidos opuestos. Por lo que se desarrollo un estator para la canalización del flujo del aire a los alabes del rotor. Este estator es de aberturas regulables según el caudal de aire que se disponga, también funciona como mecanismo de seguridad en caso de velocidades muy grandes de viento, para evitar que el rotor se embale y genere daños dentro de este. Este mecanismo de posicionamiento de los alabes del estator se regulan mediante un PLC que tiene varios sensores por el aerogenerador para abrir o cerrar el estator cuando haga falta. Debido a que el estator es semiautomático, se han previsto una serie de medidas de prevención de riesgos para evitar daños físicos. También es necesario que se coloque una barandilla que limite el espacio del aerogenerador o por el contrario delimitar el acceso de las azoteas a personal autorizado. El posicionamiento de los alabes del estator se controlan desde la parte superior del aerogenerador, mediante un motor step, un reductor y un disco del cual salen vástagos con garfios en el extremo que se unen al alabe móvil. La fijación entre vástago y garfio se realiza mediante un pasador. El motor step es quien proporciona un torque pequeño que al pasar por el reductor aumenta hasta darnos el par necesario para mover el conjunto de los alabes del estator con rachas de viento hasta . El motor step va fijado mediante una brida metálica al soporte de reductor para evitar que se mueva. El reductor se fija a la pieza mediante la cual pivota el disco de posicionamiento. La pieza de pivote se le han realizado una serie de rebajes disminuir el peso, por lo que para su conformado se realizará mediante inyección de plástico al igual que el garfio y el disco de posicionamiento. El aerogenerador esta sujeto mediante seis pilares inferiores y un pilar central que se encarga de sustentar el rotor. Estos pilares reparten el peso del aerogenerador y a su vez sostienen la pletina exterior que esconde los elementos que hay debajo como; la multiplicadora, el alternador, el cardan y el PLC. La pletina tendrá una abertura por la que el operario tendrá acceso a sus partes. La pletina exterior estará formada por varias láminas de acero unidas por cordones de soldadura. La pletina estará sujeta mediante tornillería a los pilares. El montaje de los subconjuntos se realizarán en el sitio donde se vaya a colocar el aerogenerador a excepción del reductor que es posible su montaje en taller. Previamente se tendrán que colocar barras roscadas en el suelo de la azotea para la posterior colocación y amarre de los pilares. En ese instante se colocará la multiplicadora y el alternador. La jaula junto con los alabes se montará encima de los pilares y a su vez se colocará el rotor. Posteriormente se colocará la tapa y el mecanismo de posicionamiento de los alabes y la cúpula. Una vez fijado el rotor se colocará el cardan que unirá rotor y multiplicadora. Se colocará el acople entre alternador y la multiplicadora. Se finalizara con el cierre de la pletina. Se colocarán los aparatos electrónicos que harán que el aerogenerador se comporte como un aparato semiautomático. En un compartimento dentro del edificio se colocarán baterías que acumularán la energía generada. En este habitáculo se colocará un aparato donde se visualice la potencia que se esta generando así como la velocidad de rotación y la velocidad del viento. Junto a este aparato un pulsador de parada de emergencia. Alrededor del aerogenerador se colocarán señales que indiquen los peligros que se pueden dar así como, las precauciones a tener en cuenta. Las medidas vendrán escritas en un documento junto con los mantenimientos que se han de dar. En la puerta de acceso a la azotea y en la ventana de acceso a los interiores del aerogenerador habrá un resumen del documento anteriormente descrito.
Resumo:
26 hojas : ilustraciones, fotografías.