914 resultados para Organ (Musical instrument)--Construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the teaching and learning of fractions to Indigenous adult learners in a Civil Construction Certificate Course. More specifically it explores why the use of materials is critical to building knowledge and understanding. This focus is important for two reasons. First, it allows for considerations of a trainer’s approach for teaching fractions and, second it provides insights into how adult learners can be supported with representing their practical experiences of fractions to make generalisation thus building on their knowledge and learning experiences. The paper draws on teaching episodes from an Australian Research Council funded Linkage project that investigates how mathematics is taught and learned in Certificate Courses, here, Certificate 11 in Civil Construction. Action research and decolonising methods (Smith, 1999) were used to conduct the research. Video excerpts which feature one trainer and three students are analysed and described. Findings from the data indicate that adult learners need to be supported with materials to assist with building their capacity to know and apply understandings of fractions in a range of contexts, besides construction. Without materials and where fractions are taught via pen and paper tasks, students are less likely to retain and apply fraction ideas to their Certificate Course. Further they are less likely to understand decimals because of limited understanding of fractions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Safety has long been a problem in the construction industry. Repair, maintenance, alteration and addition (RMAA) sector has emerged to play an important role in the construction industry. It accounted for 53% of the total construction market in Hong Kong in 2007. Safety performance of the RMAA words has been alarming. Statistics indicate that the percentage of fatal industrial accidents arising from RMAA work in Hong Kong was over 56% in 2006 while the remaining 44% was from new works. Effective safety measures to address the safety problems and improve safety performance of the RMAA sector are urgently needed. Unsafe behaviour has been attributed to one of the major causes of accidents. Traditional cost-benefit analysis of workers' safety behaviour seems to be inadequate. This paper proposes to adopt a game theoretical approach to analyse safety behaviour of RMAA workers. Game theory is concerned with the decision-making process in situations where outcomes depend upon choices made by one or more players. A game theoretical model between contractor and worker has been proffered. Mathematical analysis of this game model has been done and implications of the analysis have been discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry of Hong Kong is experiencing an ageing problem and a labour shortage. To alleviate the shortage of construction workforce, the government has initiatives to assist ethnic minorities to join the construction industry. It is foreseeable that more people from the ethnic minorities will join the construction industry. The safety of workers from the ethnic minorities in construction has attracted growing research interest in many developed countries. Statistics show that workers from the ethnic minorities were nearly 30 percent more likely to have work-related injuries than local workers. However, in Hong Kong, official statistics on the safety of workers from the ethnic minorities are not available. This reflects the racial or ethnic insensitivity of the construction industry in Hong Kong. As the safety of ethnic minorities has not received the attention, this research seeking to contribute to efforts to improve the safety of workers from the ethnic minorities in the construction industry of Hong Kong is all the more urgent. This paper provides an initial report of a research project which focuses on improving the safety of ethnic minority construction workers. Qualitative and quantitative research methods applied in conducting the research are first discussed. Preliminary statistics of construction accidents involving ethnic minority construction workers will then be reported.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Virus-based transgene expression systems have become particularly valuable for recombinant protein production in plants. The dual-module in-plant activation (INPACT) expression platform consists of a uniquely designed split-gene cassette incorporating the cis replication elements of Tobacco yellow dwarf geminivirus (TYDV) and an ethanol-inducible activation cassette encoding the TYDV Rep and RepA replication-associated proteins. The INPACT system is essentially tailored for recombinant protein production in stably transformed plants and provides both inducible and high-level transient transgene expression with the potential to be adapted to diverse crop species. The construction of a novel split-gene cassette, the inducible nature of the system and the ability to amplify transgene expression via rolling-circle replication differentiates this system from other DNA- and RNA-based virus vector systems used for stable or transient recombinant protein production in plants. Here we provide a detailed protocol describing the design and construction of a split-gene INPACT cassette, and we highlight factors that may influence optimal activation and amplification of gene expression in transgenic plants. By using Nicotiana tabacum, the protocol takes 6-9 months to complete, and recombinant proteins expressed using INPACT can accumulate to up to 10% of the leaf total soluble protein.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The last few years have brought an increasing interest in the chemistry of rite interstellar and circumstellar environs. Many of the molecular species discovered in remote galactic regions have been dubbed 'non-terrestrial' because of their unique structures (Thaddeus et al, 1993). These findings have provided a challenge to chemists in many differing fields to attempt to generate these unusual species in the laboratory of particular recent interest have been the unsaturated hydrocarbon families, CnH and CnH2, which have been pursued by a number of diverse methodologies. A wine range of heterocumulenes, including CnO, HCnO, CnN, HCnN, CnS, HCnS, CnSi and HCnSi have also provided intriguing targets for laboratory experiments. Strictly the term cumulene refers to a class of compounds that possess a series of adjacent double bonds, with allene representing the simplest example (H2C=C=CH2). However for many of the non-terrestrial molecules presented here, the carbon chain cannot be described in terms of a single simple valence structure, and so we use the terms cumulene and heterocumulene in a more general sense: to describe molecular species that contain an unsaturated polycarbon chain. Mass spectrometry has proved an invaluable tool in the quest for interstellar cumulenes and heterocumulenes in the laboratory it has the ability in its many forms, to (i) generate charged analogs of these species in the gas phase, (ii) probe their connectivity, ion chemistry, and thermochemistry, and (iii) in some cases, elucidate the neutrals themselves. Here, we will discuss the progress of these studies to this time. (C) 1999 John Wiley & Sons, Inc.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) and Lean construction have existed as two different initiatives to improve construction, with distinct communities and interests. In the last 10 years or so, both have started to diffuse into advanced practice, with accelerating speed. However, recently the insight has gained strength, first among pioneering practitioners and then among academics, that these two initiatives have a considerable mutual synergy and that it is highly advantageous to implement them jointly. In view of this, there are increasing needs to make BIM champions and users aware of Lean principles, methods and tools, as well as Lean champions and implementers aware of the functionalities of BIM. This guide is intended to provide a means to fulfill these needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates the mutual relations of three current drivers of construction: lean construction, building information modelling and sustainability. These drivers are based on infrequently occurring changes, only incidentally simultaneous, in their respective domains. It is contended that the drivers are mutually supportive and thus synergistic. They are aligned in the sense that all require, promote or enable collaboration. It is argued that these three drivers should be implemented in a unified manner for rapid and robust improvements in construction industry performance and the quality of the constructed facilities and their benefits for stakeholders and wider society.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide a conceptual analysis of the interaction of lean construction and BIM for improving construction. This was investigated by compiling a detailed listing of lean construction principles and BIM functionalities which are relevant from this perspective. These were drawn from a detailed literature survey. A research framework for analysis of the interaction between lean and BIM was then compiled. The goal of the framework is to both guide and stimulate research; as such, the approach adopted up to this point is constructive. Ongoing research has identified 55 such interactions, the majority of which show positive synergy between the two.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research has developed a framework to improve the effectiveness and efficiency of stakeholder involvement during the early planning stages of residential construction projects, in order to improve many of the quality issues that occur during the construction phases of such projects. A mixed methods approach (survey, interviews and case studies) was employed to collect the required data. It is expected that with development, this framework can bring some significant benefits to future construction projects in terms of reducing rework and wastage, improving timely delivery and avoiding disputes. The research is also anticipated to produce three high impact journal articles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aim. This paper is a report of a development and validation of a new job performance scale based on an established job performance model. Background. Previous measures of nursing quality are atheoretical and fail to incorporate the complete range of behaviours performed. Thus, an up-to-date measure of job performance is required for assessing nursing quality. Methods. Test construction involved systematic generation of test items using focus groups, a literature review, and an expert review of test items. A pilot study was conducted to determine the multidimensional nature of the taxonomy and its psychometric properties. All data were collected in 2005. Findings. The final version of the nursing performance taxonomy included 41 behaviours across eight dimensions of job performance. Results from preliminary psychometric investigations suggest that the nursing performance scale has good internal consistency, good convergent validity and good criterion validity. Conclusion. The findings give preliminary support for a new job performance scale as a reliable and valid tool for assessing nursing quality. However, further research using a larger sample and nurses from a broader geographical region is required to cross-validate the measure. This scale may be used to guide hospital managers regarding the quality of nursing care within units and to guide future research in the area.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects are a high risk business activity. When undertaking projects in an international context, it is further complicated by the risk of fluctuations in the foreign exchange rates (FOREX). Construction business performance is affected by these fluctuations. They affect progress and cause delays, which in turn create problems for subcontractors, namely cost overruns, disputes, arbitration, total abandonment and litigation. FOREX fluctuations also cause the price of raw materials to increase, leading the cost overruns. Managing FOREX risk is critical and past research have focused on the need for adequate insurance, careful planning and management, and foreign exchange futures hedging to overcome issues that have been caused by the FOREX risk. Analysis of FOREX risk in international construction business usually focused only on issues at the project level. There is currently lack of understanding of Organisational Capabilities (OC) to manage the impacts of FOREX risk, which when examined, are seen in isolation. This paper attempts to bridge the gap by discussing the impacts of FOREX fluctuations on the international construction business. The focus is on the OC perspective and the need to develop OC framework to mitigate the risk in sustaining construction business performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to examine the validity of the 3-Day Physical Activity Recall (3DPAR) self-report instrument in a sample of eighth and ninth grade girls (n = 70, 54.3% white, 37.1% African American). Criterion measures of physical activity were derived using the CSA 7164 accelerometer. Participants wore a CSA monitor for 7 consecutive days and completed the self-report physical activity recall for the last 3 of those days. Self-reported total METs, 30-min blocks of MVPA, and 30-min blocks of VPA were all significantly correlated with analogous CSA variables for 7 days (r = 0.35-0.51; P < 0.01) and 3 days (r = 0.27-0.46; P < 0.05) of monitoring. The results indicate that the 3DPAR is a valid instrument for assessing overall, vigorous, and moderate to vigorous physical activity in adolescent girls.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVES To describe protocol and interobserver agreements of an instrument to evaluate nutrition and physical activity environments at child care. METHODS Interobserver data were collected from 9 child care centers, through direct observation and document review (17 observer pairs). RESULTS Mean agreement between observer pairs was 87.26% and 79.29% for the observation and document review, respectively. Items with lower agreement were primarily staff behavior, counting across the day/week, and policy classifications. CONCLUSIONS Although some revisions are required, the interobserver agreement for the environment and policy assessment and observation (EPAO instrument) appears to be quite good for assessing the nutrition and physical activity environment of child care centers.