985 resultados para Instrumentation (Physics)
Resumo:
"The Y-12 Plant of the Clinton Engineer Works was operated by the Tennessee Eastman Corporation under Contract No. W-7401-eng-23 from Januaury 1943 until May 4, 1947, at which time operations were taken over by Carbide and Carbon Chemicals Corporation for the U.S. Atomic Energy Commission under Contract No. W-7405-eng-26"--Page 2 of cover.
Resumo:
Includes bibliographical references and index.
Resumo:
"Prepared for the Air Force Ballistic Missile Division, Headquarters Air Research and Development Command, under Contract AF(647)-309, Thermonuclear Propulsion Research."
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Subtitle varies.
Resumo:
[1] Progress report no. 1, Jan. 15, 1954.--[2] Final report, June 30, 1954.
Resumo:
pt. 1. Equipment.--pt. 2. Equipment trials.--pt. 3. Base surveys.
Resumo:
Includes bibliographies.
Resumo:
Cover title.
Resumo:
Pt. 1. The strings.--Pt. 2. The wood-wind.--Pt. 3. Strings and wood-wind combined.--Pt. 4. The horns.--Pt. 5. The combination of strings, wood-wind and horns.--Pt. 6. The trumpets, cornets, trombones, tubas and instruments of percussion.--Pt. 7. Harp, mandoline, zither, guitar, piano (cembalo), organ and harmonium.
Resumo:
Includes index.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.