824 resultados para Economic effects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

All relevant international standards for determining if a metallic rod is flammable in oxygen utilize some form of “promoted ignition” test. In this test, for a given pressure, an overwhelming ignition source is coupled to the end of the test sample and the designation flammable or nonflammable is based upon the amount burned, that is, a burn criteria. It is documented that (1) the initial temperature of the test sample affects the burning of the test sample both (a) in regards to the pressure at which the sample will support burning (threshold pressure) and (b) the rate at which the sample is melted (regression rate of the melting interface); and, (2) the igniter used affects the test sample by heating it adjacent to the igniter as ignition occurs. Together, these facts make it necessary to ensure, if a metallic material is to be considered flammable at the conditions tested, that the burn criteria will exclude any region of the test sample that may have undergone preheating during the ignition process. A two-dimensional theoretical model was developed to describe the transient heat transfer occurring and resultant temperatures produced within this system. Several metals (copper, aluminum, iron, and stainless steel) and ignition promoters (magnesium, aluminum, and Pyrofuze®) were evaluated for a range of oxygen pressures between 0.69 MPa (100 psia) and 34.5 MPa (5,000 psia). A MATLAB® program was utilized to solve the developed model that was validated against (1) a published solution for a similar system and (2) against experimental data obtained during actual tests at the National Aeronautics and Space Administration White Sands Test Facility. The validated model successfully predicts temperatures within the test samples with agreement between model and experiment increasing as test pressure increases and/or distance from the promoter increases. Oxygen pressure and test sample thermal diffusivity were shown to have the largest effect on the results. In all cases evaluated, there is no significant preheating (above about 38°C/100°F) occurring at distances greater than 30 mm (1.18 in.) during the time the ignition source is attached to the test sample. This validates a distance of 30 mm (1.18 in.) above the ignition promoter as a burn length upon which a definition of flammable can be based for inclusion in relevant international standards (that is, burning past this length will always be independent of the ignition event for the ignition promoters considered here. KEYWORDS: promoted ignition, metal combustion, heat conduction, thin fin, promoted combustion, burn length, burn criteria, flammability, igniter effects, heat affected zone.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic Although corporate entrepreneurship is of vital importance for long-term firm survival and growth (Zahra and Covin, 1995), researchers still struggle with understanding how to manage corporate entrepreneurship activities. Corporate entrepreneurship consists of three parts: innovation, venturing, and renewal processes (Guth and Ginsberg, 1990). Innovation refers to the development of new products, venturing to the creation of new businesses, and renewal to redefining existing businesses (Sharma, and Chrisman, 1999; Verbeke et al., 2007). Although there are many studies focusing on one of these aspects (cf. Burgelman, 1985; Huff et al., 1992), it is very difficult to compare the outcomes of these studies due to differences in contexts, measures, and methodologies. This is a significant lack in our understanding of CE, as firms engage in all three aspects of CE, making it important to compare managerial and organizational antecedents of innovation, venturing and renewal processes. Because factors that may enhance venturing activities may simultaneously inhibit renewal activities. The limited studies that did empirically compare the individual dimensions (cf. Zahra, 1996; Zahra et al., 2000; Yiu and Lau, 2008; Yiu et al., 2007) generally failed to provide a systematic explanation for potential different effects of organizational antecedents on innovation, venturing, and renewal. With this study we aim to investigate the different effects of structural separation and social capital on corporate entrepreneurship activities. The access to existing and the development of new knowledge has been deemed of critical importance in CE-activities (Floyd and Wooldridge, 1999; Covin and Miles, 2007; Katila and Ahuja, 2002). Developing new knowledge can be facilitated by structurally separating corporate entrepreneurial units from mainstream units (cf. Burgelman, 1983; Hill and Rothaermel, 2003; O'Reilly and Tushman, 2004). Existing knowledge and resources are available through networks of social relationships, defined as social capital (Nahapiet and Ghoshal, 1998; Yiu and Lau, 2008). Although social capital has primarily been studied at the organizational level, it might be equally important at top management level (Belliveau et al., 1996). However, little is known about the joint effects of structural separation and integrative mechanisms to provide access to social capital on corporate entrepreneurship. Could these integrative mechanisms for example connect the separated units to facilitate both knowledge creation and sharing? Do these effects differ for innovation, venturing, and renewal processes? Are the effects different for organizational versus top management team integration mechanisms? Corporate entrepreneurship activities have for example been suggested to take place at different levels. Whereas innovation is suggested to be a more bottom-up process, strategic renewal is a more top-down process (Floyd and Lane, 2000; Volberda et al., 2001). Corporate venturing is also a more bottom-up process, but due to the greater required resource commitments relative to innovation, it ventures need to be approved by top management (Burgelman, 1983). As such we will explore the following key research question in this paper: How do social capital and structural separation on organizational and TMT level differentially influence innovation, venturing, and renewal processes? Methodology/Key Propositions We investigated our hypotheses on a final sample of 240 companies in a variety of industries in the Netherlands. All our measures were validated in previous studies. We targeted a second respondent in each firm to reduce problems with single-rater data (James et al., 1984). We separated the measurement of the independent and the dependent variables in two surveys to create a one-year time lag and reduce potential common method bias (Podsakoff et al., 2003). Results and Implications Consistent with our hypotheses, our results show that configurations of structural separation and integrative mechanisms have different effects on the three aspects of corporate entrepreneurship. Innovation was affected by organizational level mechanisms, renewal by integrative mechanisms on top management team level and venturing by mechanisms on both levels. Surprisingly, our results indicated that integrative mechanisms on top management team level had negative effects on corporate entrepreneurship activities. We believe this paper makes two significant contributions. First, we provide more insight in what the effects of ambidextrous organizational forms (i.e. combinations of differentiation and integration mechanisms) are on venturing, innovation and renewal processes. Our findings show that more valuable insights can be gained by comparing the individual parts of corporate entrepreneurship instead of focusing on the whole. Second, we deliver insights in how management can create a facilitative organizational context for these corporate entrepreneurship activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Principal Topic The Comprehensive Australian Study of Entrepreneurial Emergence (CAUSEE) represents the first Australian study to employ and extend the longitudinal and large scale systematic research developed for the Panel Study of Entrepreneurial Dynamics (PSED) in the US (Gartner, Shaver, Carter and Reynolds, 2004; Reynolds, 2007). This research approach addresses several shortcomings of other data sets including under coverage; selection bias; memory decay and hindsight bias, and lack of time separation between the assessment of causes and their assumed effects (Johnson et al 2006; Davidsson 2006). However, a remaining problem is that any a random sample of start-ups will be dominated by low potential, imitative ventures. In recognition of this issue CAUSEE supplemented PSED-type random samples with theoretically representative samples of the 'high potential' emerging ventures employing a unique methodology using novel multiple screening criteria. We define new ''high-potential'' ventures as new entrepreneurial innovative ventures with high aspirations and potential for growth. This distinguishes them from those ''lifestyle'' imitative businesses that start small and remain intentionally small (Timmons, 1986). CAUSEE is providing the opportunity to explore, for the first time, if process and outcomes of high potentials differ from those of traditional lifestyle firms. This will allows us to compare process and outcome attributes of the random sample with the high potential over sample of new firms and young firms. The attributes in which we will examine potential differences will include source of funding, and internationalisation. This is interesting both in terms of helping to explain why different outcomes occur but also in terms of assistance to future policymaking, given that high growth potential firms are increasingly becoming the focus of government intervention in economic development policies around the world. The first wave of data of a four year longitudinal study has been collected using these samples, allowing us to also provide some initial analysis on which to continue further research. The aim of this paper therefore is to present some selected preliminary results from the first wave of the data collection, with comparisons of high potential with lifestyle firms. We expect to see owing to greater resource requirements and higher risk profiles, more use of venture capital and angel investment, and more internationalisation activity to assist in recouping investment and to overcome Australia's smaller economic markets Methodology/Key Propositions In order to develop the samples of 'high potential' in the NF and YF categories a set of qualification criteria were developed. Specifically, to qualify, firms as nascent or young high potentials, we used multiple, partly compensating screening criteria related to the human capital and aspirations of the founders as well as the novelty of the venture idea, and venture high technology. A variety of techniques were also employed to develop a multi level dataset of sources to develop leads and firm details. A dataset was generated from a variety of websites including major stakeholders including the Federal and State Governments, Australian Chamber of Commerce, University Commercialisation Offices, Patent and Trademark Attorneys, Government Awards and Industry Awards in Entrepreneurship and Innovation, Industry lead associations, Venture Capital Association, Innovation directories including Australian Technology Showcase, Business and Entrepreneurs Magazines including BRW and Anthill. In total, over 480 industry, association, government and award sources were generated in this process. Of these, 74 discrete sources generated high potentials that fufilled the criteria. 1116 firms were contacted as high potential cases. 331 cases agreed to participate in the screener, with 279 firms (134 nascents, and 140 young firms) successfully passing the high potential criteria. 222 Firms (108 Nascents and 113 Young firms) completed the full interview. For the general sample CAUSEE conducts screening phone interviews with a very large number of adult members of households randomly selected through random digit dialing using screening questions which determine whether respondents qualify as 'nascent entrepreneurs'. CAUSEE additionally targets 'young firms' those that commenced trading from 2004 or later. This process yielded 977 Nascent Firms (3.4%) and 1,011 Young Firms (3.6%). These were directed to the full length interview (40-60 minutes) either directly following the screener or later by appointment. The full length interviews were completed by 594 NF and 514 YF cases. These are the cases we will use in the comparative analysis in this report. Results and Implications The results for this paper are based on Wave one of the survey which has been completed and the data obtained. It is expected that the findings will assist in beginning to develop an understanding of high potential nascent and young firms in Australia, how they differ from the larger lifestyle entrepreneur group that makes up the vast majority of the new firms created each year, and the elements that may contribute to turning high potential growth status into high growth realities. The results have implications for Government in the design of better conditions for the creation of new business, firms who assist high potentials in developing better advice programs in line with a better understanding of their needs and requirements, individuals who may be considering becoming entrepreneurs in high potential arenas and existing entrepreneurs make better decisions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reconfiguration of corporate structures and the retailer-supplier interface in the retail industry have restructured product markets and supply chains, as well as supermarket employment, over the past decade or so (Baret, Lehndorff & Sparks 2000; du Gay 1996). Various studies have examined the consequent changes in labour usage practices within supermarkets or superstores (Baret et al. 2000; Marchington 1995; Penn & Wirth 1993; Sparks 1992; Dawson, Findlay & Sparks 1987, 1986). Commonly, this literature explores the interplay between shifts in the structure of the labour market, broader societal trends and retailers’ employment strategies. One study found that domestic and gender dimensions, accompanied by industrial relations regimes, exert considerable influence on patterns of labour usage (Baret et al. 2000). However, while the types of labour usage and the drivers of changes to labour usage patterns have attracted significant academic attention, research has largely overlooked the ways in which the nature of supermarket work has evolved as a result of changing technology, which effectively bolsters managerial prerogative, and which has affected the skill levels of workers in the industry (Marchington 1995).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction is an information intensive industry in which the accuracy and timeliness of information is paramount. It observed that the main communication issue in construction is to provide a method to exchange data between the site operation, the site office and the head office. The information needs under consideration are time critical to assist in maintaining or improving the efficiency at the jobsite. Without appropriate computing support this may increase the difficulty of problem solving. Many researchers focus their research on the usage of mobile computing devices in the construction industry and they believe that mobile computers have the potential to solve some construction problems that leads to reduce overall productivity. However, to date very limited observation has been conducted in terms of the deployment of mobile computers for construction workers on-site. By providing field workers with accurate, reliable and timely information at the location where it is needed, it will support the effectiveness and efficiency at the job site. Bringing a new technology into construction industry is not only need a better understanding of the application, but also need a proper preparation of the allocation of the resources such as people, and investment. With this in mind, an accurate analysis is needed to provide clearly idea of the overall costs and benefits of the new technology. A cost benefit analysis is a method of evaluating the relative merits of a proposed investment project in order to achieve efficient allocation of resources. It is a way of identifying, portraying and assessing the factors which need to be considered in making rational economic choices. In principle, a cost benefit analysis is a rigorous, quantitative and data-intensive procedure, which requires identification all potential effects, categorisation of these effects as costs and benefits, quantitative estimation of the extent of each cost and benefit associated with an action, translation of these into a common metric such as dollars, discounting of future costs and benefits into the terms of a given year, and summary of all cost and benefit to see which is greater. Even though many cost benefit analysis methodologies are available for a general assessment, there is no specific methodology can be applied for analysing the cost and benefit of the application of mobile computing devices in the construction site. Hence, the proposed methodology in this document is predominantly adapted from Baker et al. (2000), Department of Finance (1995), and Office of Investment Management (2005). The methodology is divided into four main stages and then detailed into ten steps. The methodology is provided for the CRC CI 2002-057-C Project: Enabling Team Collaboration with Pervasive and Mobile Computing and can be seen in detail in Section 3.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In dynamic environments, firms seek to build capabilities which will permit them to become innovation and change ready. Programs offered by intermediaries, while varying greatly in content and format, are designed to support those firms wishing to enhance their competitiveness. Firms which participate in intermediary programs have displayed their willingness to overcome deficiencies or barriers to competitiveness through acquiring knowledge which is external to the firm. This paper reports on interviews with 24 firms who were involved in a MAP or TAP program offered by QMI Solutions. The findings of the research suggest that knowledge intermediaries serve to disrupt organisational paths and in so doing establish mechanisms for ongoing learning and change. They do this first by disrupting the firm with a positive learning experience and also by establishing processes for developing new relationships and access to knowledge which are critical for learning and change. It is the experience of learning through knowledge exchange which can trigger the pursuit of new paths and it is the processes involving new relations and knowledge processing that provides the micro-foundations for ongoing learning and change. This suggests that the role of intermediaries goes well beyond merely knowledge transfer to include longer term effects on the capability of organisations to innovate, which is critical to economic competitiveness and the survival rate of firms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of the present study was to predict the economic consequences of healthcare-acquired infections arising among admissions to Australian acute care hospitals. A quantitative algorithm informed by epidemiological and economic data was developed. All acute care hospitals in Australia were included in the study and the participants included all admissions to general medical and general surgical specialties. The main outcome measures were the numbers of cases of healthcare-acquired infection and bed days lost annually. It was estimated that there are 175 153 (95% credible interval 155 911 : 195 168) cases of healthcare-acquired infection among admissions to Australian hospitals annually, and the extra stay in hospital to treat symptoms accounts for 854 289 bed days (95% credible interval 645 091 : 1 096 244). If rates were reduced by 1%, then 150 158 bed days would be released for alternative uses. This would allow ~38 500 new admissions. Healthcare-acquired infections in patients cause bed blocks in Australian hospitals. The cost-effectiveness of hospital services might be improved by allocating more resources to infection control, releasing beds and allowing new admissions. There exists an opportunity to improve the efficiency of the Australian health care system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transit agencies across the world are increasingly shifting their fare collection mechanisms towards fully automated systems like the smart card. One of the objectives in implementing such a system is to reduce the boarding time per passenger and hence reduce the overall dwell time for the buses at the bus stops/bus rapid transit (BRT) stations. TransLink, the transit authority responsible for public transport management in South East Queensland, has introduced ‘GoCard’ technology using the Cubic platform for fare collection on its public transport system. In addition to this, three inner city BRT stations on South East Busway spine are operating as pre-paid platforms during evening peak time. This paper evaluates the effects of these multiple policy measures on operation of study busway station. The comparison between pre and post policy scenarios suggests that though boarding time per passenger has decreased, while the alighting time per passenger has increased slightly. However, there is a substantial reduction in operating efficiency was observed at the station.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The progress of a nationally representative sample of 3632 children was followed from early childhood through to primary school, using data from the Longitudinal Study of Australian Children (LSAC). The aim was to examine the predictive effects of different aspects of communicative ability, and of early vs. sustained identification of speech and language impairment, on children's achievement and adjustment at school. Four indicators identified speech and language impairment: parent-rated expressive language concern; parent-rated receptive language concern; use of speech-language pathology services; below average scores on the adapted Peabody Picture Vocabulary Test-III. School outcomes were assessed by teachers' ratings of language/literacy ability, numeracy/mathematical thinking and approaches to learning. Comparison of group differences, using ANOVA, provided clear evidence that children who were identified as having speech and language impairment in their early childhood years did not perform as well at school, two years later, as their non-impaired peers on all three outcomes: Language and Literacy, Mathematical Thinking, and Approaches to Learning. The effects of early speech and language status on literacy, numeracy, and approaches to learning outcomes were similar in magnitude to the effect of family socio-economic factors, after controlling for child characteristics. Additionally, early identification of speech and language impairment (at age 4-5) was found to be a better predictor of school outcomes than sustained identification (at aged 4-5 and 6-7 years). Parent-reports of speech and language impairment in early childhood are useful in foreshadowing later difficulties with school and providing early intervention and targeted support from speech-language pathologists and specialist teachers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.