982 resultados para Drainage ditch
Resumo:
Leisure Lake is approximately a 67 acre water body located in northwest Jackson County with a 2,681 acre drainage area. The watershed including the lake is a tributary to Lytle Creek which drains into the North Fork of the Maquoketa River. Portions of the Lytle Creek and North Fork Maquoketa River are on the 303(d) impaired waterbodies list. The project area includes a community of 370 residential properties and one business that currently has no central wastewater collection and treatment system. The purpose of this project is to construct a wastewater collection and treatment facility to improve water quality in the creek and river. The project will eliminate the non-permitted septic systems and construct a new wastewater system to properly treat wastewater prior to its discharge into the waterways.
Resumo:
This watershed project will provide technical and financial assistance to improve surface and groundwater quality. This will be accomplished by installing an alternative tile outlet for 3 agricultural drainage wells (ADWs) and providing incentives to implement nutrient and pest management.
Resumo:
Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.
Resumo:
This project will include the construction of four separate drainage and retention facilities to handle urban runoff that currently flows directly into Lake Storm Lake. These facilities will filter storm water from approximately 503 acres of urban land including two large industrial users Tyson Fresh Meats and Sara Lee Turkey Processing as well as other commercial and residential sections that currently go directly to the lake without filtration. Specifically the project involves the construction of a two cell dry bottomed detention pond system, construction of two rain gardens/bio retention areas, construction of rain gardens along storm water intakes on Highway 7, and construction of a porous rock detention area. The completed project will provide for cleaner water outleting to the fake in an area that has the largest potential for pollutants to enter the lake. This project is being done in conjunction with other watershed improvements including two additional rain gardens already in place and a multi-year dredging effort of Lake Storm Lake that will be starting its fifth year in 2006. Improvements in the rural water shed are also taking place with the help of a watershed coordinator. Some of these projects include buffer strips and filter slips along the waterways in the watershed.
Resumo:
Holiday Lake is included in the Walnut Creek watershed, which is listed on the 303(d) list of impaired water bodies. Research indicates that the causes of impairment are sedimentation and habitat alterations. To improve water quality, the goals of this project are to reduce the sediment delivery into Holiday Lake by 50% and assist in educating watershed residents about cost-effective ways to control sediment and nutrient contaminates. The best management practices will be installed to filter the water, reducing sediment and chemical loading into the lake. When all practices are installed, nearly 100% of the lake’s drainage area will be controlled.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.
Resumo:
Ilioinguinal dissection is associated with a high rate of lymphatic complications. Prolonged lymph flow causes greatest concern and preventive strategies are needed. A retrospective study of 28 consecutive patients undergoing groin dissection for melanoma metastases was performed to evaluate the influence of sartorius muscle transposition on lymph flow. Modification of the surgical technique with transposition of the sartorius muscle was not associated with reduced drainage time (P = 0.66). A 2-staged approach, with initial sentinel lymph node resection and lymph node dissection in a second operation, however, lead to shortened duration of the lymph flow (P = 0.01). Prolonged lymphorrhea was more frequent in older (P = 0.03), obese (P = 0.02) patients affected by diabetes mellitus (P = 0.03) and hypertension (P = 0.04).
Resumo:
Brief Project Summary (no greater than this space allows): Leisure Lake is a 20 acre water body located in northwest Jackson County with a 2,581 acre drainage area. This portion of the Maquoketa Watershed including the lake is a tributary to Lytle Creek which drains into the North Fork Maquoketa River and into the Maquoketa Watershed. Portions of the Lytle Creek and North Fork Maquoketa River are on the 303(d) impaired waterbodies list. The project area includes a community of 370 residential properties and one business that currently has no central waste water collection and treatment system. The County Sanitarian estimates at least 225 of these properties do not have properly operating septic systems and ultimately drain their wastewater into the lake. The purpose of this project is to construct a wastewater collection and treatment facility to improve water quality in the creek and river. The project will eliminate the non-permitted septic systems and construct a new wastewater system to properly treat wastewater prior to its discharge into the waterways.
Resumo:
PURPOSE: To study prospectively the success rate and complications of deep sclerectomy with collagen implant (DSCI). SETTING: Glaucoma Unit, Department of Ophthalmology, Hôpital Ophtalmique Jules Gonin, University of Lausanne, Lausanne, Switzerland. METHODS: This nonrandomized prospective trial comprised 105 eyes of 105 patients with medically uncontrolled primary and secondary open-angle glaucoma. Visual acuity, intraocular pressure (IOP), and slitlamp examinations were performed before surgery and after surgery at 1 and 7 days, and 1, 3, 6, 9, 12, 18, 24, 30, 36, 48, 54, 60, 66, 72, 78, 84, 90, and 96 months. Visual field examinations were repeated every 6 months. RESULTS: Mean follow-up period was 64 months +/- 26.6 (SD). Mean preoperative IOP was 26.8 +/- 7.7 mm Hg, and mean postoperative IOP was 5.2 +/- 3.35 mm Hg at day 1 and 12 +/- 3 mm Hg at month 78. At 96 months, the qualified success rate (ie, patients who achieved IOP <21 mm Hg with and without medication) was 91%, and the complete success rate (ie, IOP <21 mm Hg without medication) was 57%. At 96 months, 34% of patients had an IOP <21 mm Hg with medication. Fifty-one patients (49%) achieved an IOP < or =15 mm Hg without medication. Neodymium:YAG goniopuncture was performed in 54 patients (51%); mean time of goniopuncture performance was 21 months, and mean IOP before goniopuncture was 20 mm Hg, dropping to 11 mm Hg after goniopuncture. No shallow or flat anterior chamber, endophthalmitis, or surgery-induced cataract was observed. However, 26 patients (25%) showed a progression of preexisting senile cataract (mean time 26 months; range 18 to 37 months). Injections of 5-fluorouracil were administered to 25 patients (23%) who underwent DSCI to salvage encysted blebs. Mean number of medications per patient was reduced from 2.3 +/- 0.7 to 0.5 +/- 0.7 (signed rank P<.0001). CONCLUSION: Deep sclerectomy with collagen implant appears to provide stable and reasonable control of IOP at long-term follow-up with few immediate postoperative complications.
Resumo:
The objective of this work was to assess the effect of different periods of water stress before harvest of pepper-rosmarin (Lippia sidoides) on the contents of essential oil and flavonoids. The experiment was carried out during 270 days of cultivation, with drainage lysimeters, in a completely randomized block design with five treatments: 0, 2, 4, 6, and 8 days of water suppression before harvest, with four replicates. Fresh and dry matter yield, essential oil content, total flavonoids content, and water potential and temperature of leaves were determined. There was a decrease of approximately 50% in oil content and of 60% in total flavonoid content with the reduction of leaf water potential in 0.3 MPa. Essential oil is more sensitive to water stress than total flavonoids.
Resumo:
We present a spatiotemporal adaptive multiscale algorithm, which is based on the Multiscale Finite Volume method. The algorithm offers a very efficient framework to deal with multiphysics problems and to couple regions with different spatial resolution. We employ the method to simulate two-phase flow through porous media. At the fine scale, we consider a pore-scale description of the flow based on the Volume Of Fluid method. In order to construct a global problem that describes the coarse-scale behavior, the equations are averaged numerically with respect to auxiliary control volumes, and a Darcy-like coarse-scale model is obtained. The space adaptivity is based on the idea that a fine-scale description is only required in the front region, whereas the resolution can be coarsened elsewhere. Temporal adaptivity relies on the fact that the fine-scale and the coarse-scale problems can be solved with different temporal resolution (longer time steps can be used at the coarse scale). By simulating drainage under unstable flow conditions, we show that the method is able to capture the coarse-scale behavior outside the front region and to reproduce complex fluid patterns in the front region.
Resumo:
With advances in heart transplantation, a growing number of recipients are at risk of developing gastrointestinal disease. We reviewed our experience with gastrointestinal disease in 92 patients undergoing 93 heart transplants. All had follow-up, with the median time 4.8 years (range 0.5-9.6 years). During the period of the study we progressively adopted a policy of low immunosuppression aiming toward monotherapy with cyclosporine. Nineteen patients (20.6%) developed 28 diseases related to the gastrointestinal tract. Thirteen patients required 18 surgical interventions, five as emergencies: closure of a duodenal ulcer, five cholecystectomies (one with biliary tract drainage), a sigmoid resection for a diverticulitis with a colovesical fistula, a colostomy followed by a colostomy takedown for an iatrogenic colon perforation, appendectomy, two anorectal procedures, and six abdominal wall herniorrhaphies. At the onset of gastrointestinal disease, 8 patients were on standard triple-drug immunosuppression, all of them within 6 months of transplantation; 13 were on double-drug immunosuppression; and 7 were on cyclosporine alone. All the patients with perforations/fistulas were on steroids. Among the 11 infectious or potentially infectious diseases, 10 were on triple- or double-drug immunosuppression. One death, a patient who was on triple-drug immunosuppression, had a postmortem diagnosis of necrotic and hemorrhagic pancreatitis. Except for an incisional hernia following a laparoscopic cholecystectomy, there was no morbidity and, importantly, no septic complications. We concluded that a low immunosuppression policy is likely to be responsible for the low morbidity and mortality of posttransplant gastrointestinal disease, with a lower incidence of viscous perforation/fistula and infectious gastrointestinal disease.
Resumo:
In sentinel node (SN) biopsy, an interval SN is defined as a lymph node or group of lymph nodes located between the primary melanoma and an anatomically well-defined lymph node group directly draining the skin. As shown in previous reports, these interval SNs seem to be at the same metastatic risk as are SNs in the usual, classic areas. This study aimed to review the incidence, lymphatic anatomy, and metastatic risk of interval SNs. METHODS: SN biopsy was performed at a tertiary center by a single surgical team on a cohort of 402 consecutive patients with primary melanoma. The triple technique of localization was used-that is, lymphoscintigraphy, blue dye, and gamma-probe. Otolaryngologic melanoma and mucosal melanoma were excluded from this analysis. SNs were examined by serial sectioning and immunohistochemistry. All patients with metastatic SNs were recommended to undergo a radical selective lymph node dissection. RESULTS: The primary locations of the melanomas included the trunk (188), an upper limb (67), or a lower limb (147). Overall, 97 (24.1%) of the 402 SNs were metastatic. Interval SNs were observed in 18 patients, in all but 2 of whom classic SNs were also found. The location of the primary was truncal in 11 (61%) of the 18, upper limb in 5, and lower limb in 2. One patient with a dorsal melanoma had drainage exclusively in a cervicoscapular area that was shown on removal to contain not lymph node tissue but only a blue lymph channel without tumor cells. Apart from the interval SN, 13 patients had 1 classic SN area and 3 patients 2 classic SN areas. Of the 18 patients, 2 had at least 1 metastatic interval SN and 2 had a classic SN that was metastatic; overall, 4 (22.2%) of 18 patients were node-positive. CONCLUSION: We found that 2 of 18 interval SNs were metastatic: This study showed that preoperative lymphoscintigraphy must review all known lymphatic areas in order to exclude an interval SN.
Resumo:
The determination of sediment storage is a critical parameter in sediment budget analyses. But, in many sediment budget studies the quantification of magnitude and time-scale of sediment storage is still the weakest part and often relies on crude estimations only, especially in large drainage basins (>100km2). We present a new approach to storage quantification in a meso-scale alpine catchment of the Swiss Alps (Turtmann Valley, 110km2). The quantification of depositional volumes was performed by combining geophysical surveys and geographic information system (GIS) modelling techniques. Mean thickness values of each landform type calculated from these data was used to estimate the sediment volume in the hanging valleys and the trough slopes. Sediment volume of the remaining subsystems was determined by modelling an assumed parabolic bedrock surface using digital elevation model (DEM) data. A total sediment volume of 781·3×106?1005·7×106m3 is deposited in the Turtmann Valley. Over 60% of this volume is stored in the 13 hanging valleys. Moraine landforms contain over 60% of the deposits in the hanging valleys followed by sediment stored on slopes (20%) and rock glaciers (15%). For the first time, a detailed quantification of different storage types was achieved in a catchment of this size. Sediment volumes have been used to calculate mean denudation rates for the different processes ranging from 0·1 to 2·6mm/a based on a time span of 10ka. As the quantification approach includes a number of assumptions and various sources of error the values given represent the order of magnitude of sediment storage that has to be expected in a catchment of this size.