811 resultados para shared infrastructure


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In domain of intelligent buildings, saving energy in buildings and increasing preferences of occupants are two important factors. These factors are the important keys for evaluating the performance of work environment. In recent years, many researchers combine these areas to create the system that can change from original to the modern work environment called intelligent work environment. Due to advance of agent technology, it has received increasing attention in the area of intelligent pervasive environments. In this paper, we review several issues in intelligent buildings, with respect to the implementation of control system for intelligent buildings via multi-agent systems. Furthermore, we present the MASBO (Multi-Agent System for Building cOntrol) that has been implemented for controlling the building facilities to reach the balancing between energy efficiency and occupant’s comfort. In addition to enhance the MASBO system, the collaboration through negotiation among agents is presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although many examples exist for shared neural representations of self and other, it is unknown how such shared representations interact with the rest of the brain. Furthermore, do high-level inference-based shared mentalizing representations interact with lower level embodied/simulation-based shared representations? We used functional neuroimaging (fMRI) and a functional connectivity approach to assess these questions during high-level inference-based mentalizing. Shared mentalizing representations in ventromedial prefrontal cortex, posterior cingulate/precuneus, and temporo-parietal junction (TPJ) all exhibited identical functional connectivity patterns during mentalizing of both self and other. Connectivity patterns were distributed across low-level embodied neural systems such as the frontal operculum/ventral premotor cortex, the anterior insula, the primary sensorimotor cortex, and the presupplementary motor area. These results demonstrate that identical neural circuits are implementing processes involved in mentalizing of both self and other and that the nature of such processes may be the integration of low-level embodied processes within higher level inference-based mentalizing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the UK, public expenditure on transport infrastructure is nearly £6 billion for the past few years. Over £500 million per year were spent on bridge assessment and strengthening and reducing the backlog of road requiring maintenance. A further £200 million a year will be spent on keeping the safe operation of the network and efficiently through day to day maintenance, lighting and signing . The Department of Transport is planning to extend private sector experience in road management and operation by introducing Design, Build, Finance and Operate (DBFO) This paper investigates the different ways of financing road transport infrastructure including road pricing, private finance in transport infrastructure, the role of the private sector, Design, Build, Finance and Operate (DBFO) schemes, the benefits and problems of such schemes. The paper considers planning gain as a means of financing transport infrastructure with examples of developers to fund link road building and improvements to the local planning system

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We present argon predissociation vibrational spectra of the OH-.H2O and Cl-.H2O complexes in the 1000-1900 cm(-1) energy range, far below the OH stretching region reported in previous studies. This extension allows us to explore the fundamental transitions of the intramolecular bending vibrations associated with the water molecule, as well as that of the shared proton inferred from previous assignments of overtones in the higher energy region. Although the water bending fundamental in the Cl-.H2O spectrum is in very good agreement with expectations, the OH-.H2O spectrum is quite different than anticipated, being dominated by a strong feature at 1090 cm(-1). New full-diniensionality calculations of the OH-.H2O vibrational level structure using diffusion Monte Carlo and the VSCF/CI methods indicate this band arises from excitation of the shared proton.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Libya with its strategic location and natural resources stands as a crucial link between the Arab world, Europe, and Africa. The people of Libya have an optimistic outlook with regard to the Libyan economy after the suspension of the United Nations sanctions in 1999 that had been imposed on Libya in 1992, as well as the recent emphasis on privatization from the government. Since then, local and foreign investors have been encouraged to take a more prominent role in order to help privatize some of the state run-industries; the attention to privatization is aimed to help Libya’s economic growth and reduce its heavy dependency on oil revenues. Considering the economic situation, Libya is a rich country. However, it needs to modernize, it needs more and better infrastructure, it needs non-oil based financing, furthermore, it needs to develop a financial model for development and investment from the private sector. Although the Libyan government is working on the improvement of the business environment to make it more attractive for foreign investors in a way to move towards privatization, they have ignored some of the challenges that privatization will be facing in Libya. Privatization can not be implemented overnight. They have taken this for granted without careful consideration of its challenges. This paper attempts to investigate and discuss the challenges that need to be taken into account before privatization of infrastructure projects can be introduced in Libya. This paper is based on interviews with senior technical officials in the government.