825 resultados para activity-based management


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main objective of the work undertaken here was to develop an appropriate microbial technology to protect the larvae of M.rosenbergii in hatchery from vibriosis. This technology precisely is consisted of a rapid detection system of vibrios and effective antagonistic probiotics for the management of vibrios. The present work was undertaken with the realizations that to stabilize the production process of commercial hatcheries an appropriate, comprehensive and fool proof technology is required primarily for the rapid detection of Vibrio and subsequently for its management. Nine species of Vibrio have been found to be associated with larvae of M. rosenbergii in hatchery. Haemolytic assay of the Vibrio and Aeromonas on prawn blood agar showed that all isolates of V. alginolyticus and Aeromonas sp., from moribund, necrotized larve were haemolytic and the isolates of V.cholerae, V.splendidus II, V.proteolyticus and V.fluvialis from the larvae obtained from apparently healthy larval rearing systems were non-haemolytic. Hydrolytic enzymes such as lipase, chitinase and gelatinase were widespread amongst the Vibrio and Aeromonas isolates. Dominance of V.alginolyticus among the isolates from necrotic larvae and the failure in isolating them from rearing water strongly suggest that they infect larvae and multiply in the larval body and cause mortality in the hatchery. The observation suggested that the isolate V. alginolyticus was a pathogen to the larvae of M.rosenbergii. To sum up, through this work, nine species of Vibrio and genus Aeromonas associated with M.rosenbergii larval rearing systems could be isolated and segregated based on the haemolytic activity and the antibodies (PA bs) for use in diagnosis or epidemiological studies could be produced, based on a virulent culture of V.alginolyticus. This could possibly replace the conventional biochemical tests for identification. As prophylaxis to vibriosis, four isolates of Micrococcus spp. and an isolate of Pseudomonas sp. could be obtained which could possibly be used as antagonistic probiotics in the larval rearing system of M.rosenbergii.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Schiff base complexes of transition metal ions have played a significant role in coordination chemistry.The convenient route of synthesis and thermal stability of Schiff base complexes have contributed significantly for their possible applications in catalysis,biology,medicine and photonics.Significant variations in cataltytic activity with structure and type are observed for these complexes.The thesis deals with synthsis and characterization of transition metal complexes of quinoxaline based Schiff base ligands and their catalytic activity study.The Schiff bases synthesized in the present study are quinoxaline-2-carboxalidine-2-amino-5-methylphenol,3-hydroxyquinoxaline-2-carboxalidine-2-amino-5-methylphenol,quinoxaline-2-aminothiophenol.They provide great structural diversity during complexation.To the best of our knowledge, the transition metal complexes of quinoxaline based Schiff bases are poorly utilised in academic and industrial research.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Department of Applied Economics, Cochin University of Science and Technology

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The thesis entitled Personnel Management Practices in the Kerala-Based Scheduled Commercial Banks. Personnel management function is of cardinal importance, requiring a sophisticated and scientific approach. In a labour-intensive, service industry like banking. Productivity and ultimate profitability of the entire organization depend considerably on the effectiveness with which personnel management function is executed; and the prudence with which personnel problems are handle. The main objectives of the study are to understand the current status of personnel management functions in the banks and to evaluate the practices in the light of the principles and theories of personnel management so as to identify the strengths and weaknesses. The universe of this study is the eight Scheduled Commercial Banks based in Kerala. The major limitation of the study is that as State Bank of Travancore, the lone public sector bank based in Kerala did not grant permission for collection of data, this study had to be confined to private sector banks only. Almost the entire data used for this study are primary and were collected from the files and other records or the concerned banks. This report has chapters dealing with the functional areas of personnel management such as determination of human resource requirements, recruitment and selection, training and development, performance appraisal, promotions and compensation. Findings reveal that the practice of personnel management in the Kerala-based private sector scheduled commercial banks has not gained a degree of sophistication compatible with its role in modern business management.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Studies in urban water supply system are few in the state of Kerala. It is a little researched area. In the case of water pricing a number of studies are available. In Kerala state, exception to Jacob John’s study on “Economics of Public Water Supply System”, which is a case study of Trivandrum Water Supply System in 1997, no exhaustive research work has so far come out in this field. loreover no indepth research study has come up, so far, relating to household ater demand analysis and the distribution system of urban piped water supply. he proposed study is first of its kind, which focuses on the distributional and Iailability problems of piped water supply in an urban centre in Kerala state. Hence there is a felt need for enquiring into the sufficiency of )table water supplied to people in urban areas and the efficiency maintained in roviding the scarce resource and preventing its misuse by the consumers. It is in llS backdrop that this study was undertaken and its empirical part was conducted |Calicut city in the state of Kerala. Study is confined to the water supply system ithe city of Calicut

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In der vorliegenden Arbeit wird ein am Strengths-Modell orientiertes Case Management-Projekt zur Prozess- und Ergebnisoptimierung der bereits bestehenden ambulanten gerontopsychiatrischen Versorgungsstruktur untersucht. Dazu arbeitete eine Krankenpflegerin mit psychiatrischer Fachausbildung in einer Berliner Sozialstation auf Basis einer professionellen Beziehung für 4-6 Wochen bei Klientinnen mit gerontopsychiatrischen Problemlagen, erstellte ein Assessment, leistete notwendige Unterstützung zunächst selbst, vermittelte gestützt auf die eigenen Erfahrungen weiterführende Dienste, leitete diese Dienste an, zog sich dann aus dem direkten Kontakt mit den Klientinnen zurück und blieb beratend für die weiterführenden Dienste verfügbar. Zur Untersuchung des Projekts wurden qualitative und quantitative Verfahren eingesetzt. Zur Beschreibung der Inhalte wurden die für jede Klientin verfasste Dokumentation und die Ergebnisse von grob strukturierten Interviews mit der Case Managerin, angelehnt an eine reduzierte Form der Methode Grounded Theory, in einem iterativen Prozess analysiert. In einem zweiten Schritt wurde dann untersucht, inwieweit die einzelnen Arbeitsinhalte des Case Managements die sozial-räumlichdingliche Umweltanpassung und Proaktivität der Klientinnen unterstützten. Die Wirkungen des Projektes auf Kognition, Aktivitäten des täglichen Lebens (ADL), Instrumentelle Aktivitäten des täglichen Lebens (IADL), Stimmung sowie soziales und störendes Verhalten wurden mittels eines standardisierten Fragebogens mit einem quasi-experimentellen prospektiven Untersuchungsdesign analysiert. Zur Analyse der subjektiven Wirkung des Projektes auf Angehörige wurden in den Ergebnissen von grob strukturierten Interviews mittels eines iterativen Prozesses Themen identifiziert. Die Klientinnen (n=11) erhielten durchschnittlich 23 Stunden Case Management. Neben den typischen Case Management-Aufgaben führte die Case Managerin, basierend auf den Gewohnheiten, Interessen und Selbsteinschätzungen der Klientinnen, therapeutische und pflegerische Maßnahmen durch und unterstützte dabei die sozial-dinglichräumliche Umweltanpassung und Proaktivität der Klientinnen. Zusätzlich wurden Hauspflegerinnen von der Case Managerin individuell in der Wohnung von Klientinnen hinsichtlich der Kommunikation mit und Unterstützung der Proaktivität von Klientinnen angeleitet. Die Hauspflegerinnen führten die von der Case Managerin eingeleiteten Maßnahmen erfolgreich fort. Bei den Klientinnen zeigten sich signifikante Verbesserungen in Gedächtnis, Stimmung, IADL-Funktionen und Sozialverhalten, aber nicht in ADL-Funktionen und störendem Verhalten. Diese Verbesserungen wurden subjektiv von den Angehörigen (n=7) bestätigt. Zusätzlich empfanden Angehörige eine zeitliche aber keine psychische Entlastung. Mit diesem Projekt wurde gezeigt, dass ein zeitlich begrenztes klientenzentriertes Case Management kognitive, soziale und emotionale Funktionen von gerontopsychiatrisch Erkrankten verbessert, Angehörige zeitlich entlastet und dass Hauspflegerinnen bei entsprechender Anleitung die vom Case Management eingeleiteten Maßnahmen fortführen können. In Folgestudien mit größerem Umfang sollten diese Ergebnisse überprüft werden um dann zu entscheiden, ob dieser Ansatz geeignet ist, die ambulante gerontopsychiatrische Versorgung gemeindenah zu verbessern.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Currently the push toward frontier areas, which until twenty years ago were still largely untouched by commercial agriculture, is taking place on a massive scale. This push is being driven not the least by global economic developments, such as the price increase of agriculture commodities like coffee and cocoa. In most cases the indigenous communities become trapped between the state monopoly in natural resource management and the competition for resources by external actors. In this processes the indigenous communities start to lose their access to resources. Another victim in this process is the environment where the natural resources are imbedded. International and national organizations working to conserve environment have became conscious of the important role that indigenous people could fulfill as partners in this endeavour. This partnership in struggle has produced a new discourse on the relationship between indigenous people and their environment. As a further consequence, programs were set up to develop what became known as Community Based Natural Resource Management (CBNRM) with its numerous variations. Based on a case study in a village on the eastern border of the Lore Lindu National Park in Central Sulawesi, this study questioned the basic assumption behind the concept of Community Based Natural Resource Management (CBNRM). Namely the assumption that communities living at the margin of forest are socially and culturally homogenous, still more or less egalitarian, and basically living in harmony with their natural environment. This study was inspired by the persistent critique – although still a minority – on the basic assumption the CBNRM from academicians and practitioners working through the Entitlement perspective. Another inspiration was the mounting critique toward the participatory approach. In its effort the study explore further the usefulness of certain approaches. One of the approach much relied on in this study was the local history of the community studied, through exerting oral and local written documents on local history, legends and local stories. These sources proofed quite capable in bringing the local history into the light. Another was the actor oriented approach, which later came to be supported by the concept of Social Pool Resources. The latter concept proofed to be useful as analytical instrument to integrate social institutions and the common pool resources, as a field of action for the different actors as human agencies.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Expansion of rubber tree plantations and agricultural mechanization caused a decline of swamp buffalo numbers in the Naban River National Nature Reserve (NRNNR), Yunnan Province, China. We analysed current use of buffaloes for field work and the recent development of the regional buffalo population, based on interviews with 184 farmers in 2007/2008 and discussions with 62 buffalo keepers in 2009. Three types of NRNNR farms were distinguished, differing mainly in altitude, area under rubber, and involvement in livestock husbandry. While pig based farms (PB; n=37) have abandoned buffalo keeping, 11% of the rubber based farms (RB; n=71) and 100% of the livestock-corn based farms (LB; n=76) kept buffaloes in 2008. Herd size was 2.5 +/-1.80 (n=84) buffaloes in early 2008 and 2.2 +/-1.69 (n=62) in 2009. Field work on own land was the main reason for keeping buffaloes (87.3 %), but lending work buffaloes to neighbours (79.0%) was also important. Other purposes were transport of goods (16.1%), buffalo trade (11.3%) and meat consumption (6.4%). Buffalo care required 6.2 +/-3.00 working hours daily, while annual working time of a buffalo was 294 +/-216.6 hours. The area ploughed with buffaloes remained constant during the past 10 years despite an expansion of land cropped per farm. Although further replacement of buffaloes by tractors occurs rapidly, buffaloes still provide cheap work force and buffer risks on poor NRNNR farms. Appropriate advice is needed for improved breeding management to increase the efficiency of buffalo husbandry and provide better opportunities for buffalo meat sale in the region.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

by Daniel K. Moon.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

We present a system for dynamic network resource configuration in environments with bandwidth reservation and path restoration mechanisms. Our focus is on the dynamic bandwidth management results, although the main goal of the system is the integration of the different mechanisms that manage the reserved paths (bandwidth, restoration, and spare capacity planning). The objective is to avoid conflicts between these mechanisms. The system is able to dynamically manage a logical network such as a virtual path network in ATM or a label switch path network in MPLS. This system has been designed to be modular in the sense that in can be activated or deactivated, and it can be applied only in a sub-network. The system design and implementation is based on a multi-agent system (MAS). We also included details of its architecture and implementation

Relevância:

40.00% 40.00%

Publicador:

Resumo:

World Health Organization (WHO) has prioritized physical activity (PA) as one of the mostrelevant strategies leading the decreasing prevalence of noncommunicable chronic diseases. Pedometer has emerged as one of the valid intervention programs, reliable and useful to assess,measure and promote the physical activity practice, through counts the number of steps perday. One of the aims is to establish the goals based on steps per day made by a person and thepositive feedback, which can generate behavior changes and adoption of healthy habits, from a regular physical activity practice perspective. This review attends to enhance the current state ofpedometer program, as an intervention one, in all kind of population; its health impact and theapplication methodologies, using the pedometer as a steps quantifier device, with feasible access,use and management. Additionally, the review will be useful as a framework to design futureresearch projects, aim to develop, adapt and apply evidence based pedometer protocols, insideclinical, academic and community context.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The main objective pursued in this thesis targets the development and systematization of a methodology that allows addressing management problems in the dynamic operation of Urban Wastewater Systems. The proposed methodology will suggest operational strategies that can improve the overall performance of the system under certain problematic situations through a model-based approach. The proposed methodology has three main steps: The first step includes the characterization and modeling of the case-study, the definition of scenarios, the evaluation criteria and the operational settings that can be manipulated to improve the system’s performance. In the second step, Monte Carlo simulations are launched to evaluate how the system performs for a wide range of operational settings combinations, and a global sensitivity analysis is conducted to rank the most influential operational settings. Finally, the third step consists on a screening methodology applying a multi-criteria analysis to select the best combinations of operational settings.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La gestió de xarxes és un camp molt ampli i inclou molts aspectes diferents. Aquesta tesi doctoral està centrada en la gestió dels recursos en les xarxes de banda ampla que disposin de mecanismes per fer reserves de recursos, com per exemple Asynchronous Transfer Mode (ATM) o Multi-Protocol Label Switching (MPLS). Es poden establir xarxes lògiques utilitzant els Virtual Paths (VP) d'ATM o els Label Switched Paths (LSP) de MPLS, als que anomenem genèricament camins lògics. Els usuaris de la xarxa utilitzen doncs aquests camins lògics, que poden tenir recursos assignats, per establir les seves comunicacions. A més, els camins lògics són molt flexibles i les seves característiques es poden canviar dinàmicament. Aquest treball, se centra, en particular, en la gestió dinàmica d'aquesta xarxa lògica per tal de maximitzar-ne el rendiment i adaptar-la a les connexions ofertes. En aquest escenari, hi ha diversos mecanismes que poden afectar i modificar les característiques dels camins lògics (ample de banda, ruta, etc.). Aquests mecanismes inclouen els de balanceig de la càrrega (reassignació d'ample de banda i reencaminament) i els de restauració de fallades (ús de camins lògics de backup). Aquests dos mecanismes poden modificar la xarxa lògica i gestionar els recursos (ample de banda) dels enllaços físics. Per tant, existeix la necessitat de coordinar aquests mecanismes per evitar possibles interferències. La gestió de recursos convencional que fa ús de la xarxa lògica, recalcula periòdicament (per exemple cada hora o cada dia) tota la xarxa lògica d'una forma centralitzada. Això introdueix el problema que els reajustaments de la xarxa lògica no es realitzen en el moment en què realment hi ha problemes. D'altra banda també introdueix la necessitat de mantenir una visió centralitzada de tota la xarxa. En aquesta tesi, es proposa una arquitectura distribuïda basada en un sistema multi agent. L'objectiu principal d'aquesta arquitectura és realitzar de forma conjunta i coordinada la gestió de recursos a nivell de xarxa lògica, integrant els mecanismes de reajustament d'ample de banda amb els mecanismes de restauració preplanejada, inclosa la gestió de l'ample de banda reservada per a la restauració. Es proposa que aquesta gestió es porti a terme d'una forma contínua, no periòdica, actuant quan es detecta el problema (quan un camí lògic està congestionat, o sigui, quan està rebutjant peticions de connexió dels usuaris perquè està saturat) i d'una forma completament distribuïda, o sigui, sense mantenir una visió global de la xarxa. Així doncs, l'arquitectura proposada realitza petits rearranjaments a la xarxa lògica adaptant-la d'una forma contínua a la demanda dels usuaris. L'arquitectura proposada també té en consideració altres objectius com l'escalabilitat, la modularitat, la robustesa, la flexibilitat i la simplicitat. El sistema multi agent proposat està estructurat en dues capes d'agents: els agents de monitorització (M) i els de rendiment (P). Aquests agents estan situats en els diferents nodes de la xarxa: hi ha un agent P i diversos agents M a cada node; aquests últims subordinats als P. Per tant l'arquitectura proposada es pot veure com una jerarquia d'agents. Cada agent és responsable de monitoritzar i controlar els recursos als que està assignat. S'han realitzat diferents experiments utilitzant un simulador distribuït a nivell de connexió proposat per nosaltres mateixos. Els resultats mostren que l'arquitectura proposada és capaç de realitzar les tasques assignades de detecció de la congestió, reassignació dinàmica d'ample de banda i reencaminament d'una forma coordinada amb els mecanismes de restauració preplanejada i gestió de l'ample de banda reservat per la restauració. L'arquitectura distribuïda ofereix una escalabilitat i robustesa acceptables gràcies a la seva flexibilitat i modularitat.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.