900 resultados para Letting of contracts Queensland
Resumo:
More than 2000 turbidite, debris-flow, and slump deposits recovered at Site 823 record the history of the Queensland Trough since the middle Miocene and provide new insights about turbidites, debris flow, and slump deposits (herein termed gravity deposits). Changes in the composition and nature of gravity deposits through time can be related to tectonic movements, fluctuations in eustatic sea level, and sedimentological factors. The Queensland Trough is a long, relatively narrow, structural depression that formed as a result of Cretaceous to Tertiary rifting of the northeastern Australia continental margin. Thus, tectonics established the geometry of this marginal basin, and its steep slopes set the stage for repeated slope failures. Seismic data indicate that renewed faulting, subsidence, and associated tectonic tilting occurred during the early late Miocene (continuing into the early Pliocene), resulting in unstable slopes that were prone to slope failures and to generation of gravity deposits. Tectonic subsidence, together with a second-order eustatic highstand, resulted in platform drowning during the late Miocene. The composition of turbidites reflects their origin and provides insights about the nature of sedimentation on adjacent shelf areas. During relative highstands and times of platform drowning, planktonic foraminifers were reworked from slopes and/or drowned shelves and were redeposited in turbidites. During relative lowstands, quartz and other terrigenous sediment was shed into the basin. Quartzose turbidites and clay-rich hemipelagic muds also can record increased supply of terrigenous sediment from mainland Australia. Limestone fragments were eroded from carbonate platforms until the drowned platforms were buried under hemipelagic sediments following the late Miocene drowning event. Bioclastic grains and neritic foraminifers were reworked from neritic shelves during relative lowstands. During the late Pliocene (2.6 Ma), the increased abundance of bioclasts and quartz in turbidites signaled the shallowing and rejuvenation of the northeastern Australia continental shelf. However, a one-for-one relationship cannot be recognized between eustatic sea-level fluctuations and any single sedimentologic parameter. Perhaps, tectonism and sedimentological factors along the Queensland Trough played an equally important role in generating gravity deposits. Turbidites and other gravity deposits (such as those at Site 823) do not necessarily represent submarine fan deposits, particularly if they are composed of hemipelagic sediments reworked from drowned platforms and slopes. When shelves are drowned and terrigenous sediment is not directly supplied by nearby rivers/point sources, muddy terrigenous sediments blanket the entire slope and basin, rather than forming localized fans. Slope failures affect the entire slope, rather than localized submarine canyons. Slopes may become destabilized as a result of tectonic activity, inherent sediment weaknesses, and/or during relative sea-level lowstands. For this reason, sediment deposits in this setting reflect tectonic and eustatic events that caused slope instabilities, rather than migration of different submarine fan facies.
Resumo:
The continental margin off northeast Australia, comprising the Great Barrier Reef (GBR) platform and Queensland Trough, is the largest tropical mixed siliciclastic/carbonate depositional system in existence. We describe a suite of 35 piston cores and two Ocean Drilling Program (ODP) sites from a 130*240 km rectangular area of the Queensland Trough, the slope and basin setting east of the central GBR platform. Oxygen isotope records, physical property (magnetic susceptibility and greyscale) logs, analyses of bulk carbonate content and radiocarbon ages at these locations are used to construct a high resolution stratigraphy. This information is used to quantify mass accumulation rates (MARs) for siliciclastic and carbonate sediments accumulating in the Queensland Trough over the last 31,000 years. For the slope, highest MARs of siliciclastic sediment occur during transgression (1.0 Million Tonnes per year; MT/yr), and lowest MARs of siliciclastic (<0.1 MT/yr) and carbonate (0.2 MT/yr) sediment occur during sea level lowstand. Carbonate MARs are similar to siliciclastic MARs for transgression and highstand (1.1-1.4 MT/yr). In contrast, for the basin, MARs of siliciclastic (0-0.1 MT/yr) and carbonate sediment (0.2-0.4 MT/yr) are continuously low, and within a factor of two, for lowstand, transgression, and highstand. Generic models for carbonate margins predict that maximum and minimum carbonate MARs on the slope will occur during highstand and lowstand, respectively. Conversely, most models for siliciclastic margins suggest maximum and minimum siliciclastic MARs will occur during lowstand and transgression, respectively. Although carbonate MARs in the Queensland Trough are similar to those predicted for carbonate depositional systems, siliciclastic MARs are the opposite. Given uniform siliciclastic MARs in the basin through time, we conclude that terrigenous material is stored on the shelf during sea level lowstand, and released to the slope during transgression as wave driven currents transport shelf sediment offshore.
Resumo:
Actualmente se está empezando a consolidar una nueva forma de gestionar la conservación y mantenimiento de la red viaria de las Administraciones Públicas, basándose en contratos de colaboración público-privadas (PPP). Las motivaciones que están provocando este movimiento son de diversa índole. Por un lado, en el seno de la Unión Europea, existen serias restricciones presupuestarias debido al alto endeudamiento del sector público, lo que está llevando a buscar la forma óptima de disminuir el endeudamiento público, sin dejar de prestar servicios a la sociedad como la conservación y mantenimiento de las redes viarias. Por esta vertiente, se trata de convertir contratos convencionales de conservación viaria a esquemas de colaboración público-privada, donde se transferiría al sector privado el riesgo de disponibilidad de la vía mediante el uso de indicadores de calidad y servicio. Con esta transferencia de riesgo, junto con la transferencia del riesgo de demanda/construcción, no consolidaría la deuda de la sociedad de propósito específico constituida para la gestión del contrato de colaboración público-privada dentro de las cuentas públicas, con lo que se conseguiría no aumentar el déficit público, permitiendo continuar ofreciendo el servicio demandado por la sociedad. Por otro lado, la segunda motivación del desarrollo de este tipo de contratos, no tan economicista como la anterior y más enfocada a la gestión, se trata de utilizar los contratos de gestión basados en el uso de indicadores de calidad de servicio para mejorar las prestaciones de la red viaria competencia de una Administración. Con el uso de estos indicadores, el gestor tiene una herramienta muy útil para controlar la actividad del sector privado y asegurar que se ofrece un buen servicio. En la presente tesis, la investigación se ha centrado más en la vertiente de los indicadores de calidad relacionados con la gestión eficiente de las vías objeto de conservación y mantenimiento mediante el empleo de contratos de gestión privada que utilicen este tipo de herramientas de control, monitorización y gestión. En una primera parte, la presente tesis estudia el estado de la red de carreteras, referido principalmente a España, comparando su estado con el resto de redes de carreteras de Europa, detectando las principales carencias de la misma, sobre todo en cuanto a la gestión y conservación de firmes. En un segundo bloque, la tesis analiza el estado del arte de los nuevos procedimientos de gestión de la conservación y mantenimiento basados en indicadores de calidad del servicio en el mundo, destacándose que se trata de un tema relativamente reciente, con gran interés para el sector de la gestión y financiación de infraestructuras viarias. Al ser tan novedoso, por la falta de experiencias previas, las distintas Administración, tanto propias como foráneas, han pecado de un exceso de celo a la hora de establecer los umbrales sobre los que giran los distintos indicadores de calidad de servicio que permiten controlar la gestión de la conservación y mantenimiento de la vía. Partiendo de la labor de análisis descrita, la tesis realiza una investigación más detallada de los indicadores de calidad de servicio correspondientes a firmes bituminosos, debido a que estos indicadores son los más delicados y decisivos a la hora de realizar una correcta gestión de la vía a largo plazo. Dentro de los indicadores de firmes bituminosos, se ha realizado un modelo específico de evolución de comportamiento a lo largo del tiempo de la regularidad superficial, parámetro básico para numerosas Administraciones y organismos investigadores para poder conocer la evolución de un firme a lo largo del tiempo. A esta metodología se le ha dado el nombre de Modelo JRB para evaluar la racionalidad económica de indicadores de calidad asociados a parámetros de firmes. El modelo propuesto básicamente evalúa el valor óptimo desde la perspectiva económica que ha de tener el parámetro técnico que defina alguna propiedad del firme, aplicado a la definición de los indicadores de calidad de servicio. Esta visión del valor umbral del indicador deja a un lado consideraciones de equidad o de cualquier otra índole, basándose más en una visión económica. La metodología del Modelo JRB se puede aplicar a cualquier indicador de calidad relacionado con firmes, ya que lo que se obtiene es el valor óptimo económico que debería tener el umbral del indicador de calidad. El Modelo JRB consta de varias fases. En las primeras etapas el Modelo realiza el cálculo de los costes totales de transporte utilizando como herramienta el software HDM-IV desarrollado por el Banco Mundial. En etapas posteriores, el Modelo realiza análisis de sensibilidad para distintas propuestas de sección de firme, intensidades de tráfico y restricciones al parámetro técnico que define el indicador de calidad de servicio. Como ejercicio práctico de cara a contrastar la metodología del Modelo JRB se ha realizado un Caso de Estudio. Se ha tomado un tramo teórico, con características similares a la red de carreteras española, y con una flota vehicular similar a la española, donde se ha elegido como indicador de calidad la regularidad superficial (IRI). Con las sensibilidades realizadas con el Modelo JRB, se ha determinado el rango de valores que debería tener un indicador de calidad basado en el IRI para que dichos valores fueran óptimos desde la perspectiva económica Nowadays is becoming a new way to manage O&M (operation and maintenance) in public road networks, based on PPP contracts (public-private partnership). There are several issues which are driving this trend. On the one hand, EU (European Union) has serious budgetary constraints due to the high public sector borrowing. EU politicians are looking for the best way to reduce public debt, keeping services to society such as O&M of road networks. For this aspect, conventional O&M contracts are switching to PPP scenarios, where availability risk would be transfer to private sector using PI (performance indicators), along with demand risk transfer With this risk transference, along with the transfer of demand/construction risk, SPV (specific purpose vehicle) debt doesn’t consolidate in public accounts, so deficit wouldn’t increase, allowing the continuation of services demanded by society. On the other hand, the second motivation for developing this kind of contracts, not so economist as above and more focused to management, it is about using O&M contracts based on the use of PI to improve road network maintenance. Using these indicators, manager has a very useful tool to monitor private sector activity and ensure that it is provided a good service. In this thesis, the research has been focused on PI quality aspect, related with efficient management of PPP contracts for roads, which use these tools for control, monitoring and management. In the first part, this thesis examines the state of road network, based mainly in Spain, comparing with other road networks in Europe, identifying the main gaps in it, especially with regard to the management and maintenance of pavements. In a second block, the thesis analyzes the state of art of new O&M contracts based on PI in the world, emphasizing that they are relatively recent. These kinds of contracts have a great interest in road management and financing sector. Administrations all around the world have launch tenders with very exigent PI thresholds due to several factors: this knowledge is a new area, the lack of previous experiences and the variety of Administrations which have bid these contracts. Building on the described analysis, thesis develops a more detailed research about PI for bituminous pavements, because these PI are the most delicate and decisive in making a proper long term road management. Among bituminous pavements PI, IRI (International Roughness Index) has been analyzed with more detail and has been developed a specific model of behaviour evolution over time for evenness (IRI), basic parameter for many administrations and research departments in order to know the evolution of a pavement over time. This methodology has been given the name of JRB Model to evaluate the economic rationality of performance indicators associated with pavements parameters. The proposed model basically evaluates the optimal value from an economic perspective it must have the technical parameter which defines some pavement characteristic applied to the definition of performance indicators. This point of view of indicator value threshold sets aside justice considerations or otherwise, based more on an economic perspective. JRB Model methodology can be applied to any performance indicator associated to pavements, because what you get is the economic optimum threshold should have the performance indicator. JRB Model consists of several phases. In the early stages, the Model calculates transport total cost using HDM-IV software, developed by the World Bank, as a tool. In later stages, the Model performs sensitivity analyzes for different pavement section, AADT and restrictions to the technical parameter which defines the performance indicator. As a practical exercise to test JRB Model methodology, it has done a Case Study. It has taken a theoretical section, with similar characteristics to Spanish road network, and a vehicles fleet similar to Spanish. Evenness (IRI) was chosen as a performance indicator. JRB Model calculated some sensitivities, which were useful to determined thresholds range for pavement performance indicators based on IRI to be optimal from an economic perspective.
Estudio de viabilidad de un campo exploratorio en África central según diferentes regímenes fiscales
Resumo:
El objetivo del presente proyecto consiste en analizar la viabilidad de un campo de E&P (Exploración y Producción) de hidrocarburos situado en Gabón en función de diferentes regímenes fiscales con el fin de estudiar el reparto de la renta entre el gobierno y la compañía petrolífera. Tras estudiar los parámetros técnicos del proyecto y confirmar su viabilidad desde un punto de vista puramente técnico, en la segunda parte del estudio se analiza para un mismo campo el impacto que tiene la variación de una serie de parámetros que dependen únicamente del tipo de contrato acordado entre el gobierno y la compañía petrolífera. Existen principalmente dos tipos de contratos que los gobiernos de los países productores aplican a las compañías extranjeras que pretenden operar en ellos. Mediante el estudio realizado se pone de manifiesto que las decisiones estratégicas en proyectos de E&P de hidrocarburos están íntimamente sujetas a condiciones fiscales. La decisión de firmar un tipo de contrato u otro puede ser determinante para la rentabilidad o no de este tipo de proyectos. ABSTRACT The main goal of this project is to analyze the feasibility of a E&P project located in Gabon according to different tax regimes in order to study the profits distribution between the government and the oil company. After studying the technical parameters and confirm its viability from a technical point of view, in the second part of the study were analyzed for the same field the impact of the variation of some parameters that only depends on the type of contract agreed between the government and the oil company. There are mainly two types of contracts that governments of producing countries apply to foreign companies seeking to operate in them. Through the study it appears that strategic decisions in E&P projects are closely hydrocarbon tax policies apply.
Resumo:
En el sector de la edificación, las grandes constructoras comienzan a considerar aspectos medioambientales, no limitándose a lo establecido por la legislación vigente, y buscando la implementación de buenas prácticas. Si bien este hecho es una realidad para las grandes empresas constructoras, todavía falta que la gran mayoría de las empresas del sector (pequeñas y medianas) adopten ésta tendencia. En este sentido, las publicaciones y estadísticas consultadas revelan que el sector de la construcción sigue siendo el sector con menor número de Sistemas de Gestión Ambiental (SGA) certificados en comparación con otros sectores industriales, debido principalmente a las peculiaridades de su actividad. Por otra parte, el sector de la construcción genera grandes cantidades de residuos de construcción y demolición (RCD). Aunque, en los últimos años la actividad de la construcción ha disminuido, debido a la crisis económica del país, no hay que olvidar todos los problemas causados por este tipo de residuos, o mejor dicho, por su gestión. La gestión de los RCD actual está lejos de alcanzar la meta propuesta en la Directiva Marco de Residuos (DMR), la cual exige un objetivo global para el año 2020 en el que el 70% de todos los RCD generados deberán ser reciclados en los países de la UE. Pero, la realidad es que sólo el 50% de la RCD generados en la Unión Europea se recicla. Por este motivo, en los últimos años se ha producido una completa modificación del régimen jurídico aplicable a los RCD, incorporando importantes novedades a nuestro ordenamiento interno como son: la redacción de un Estudio de gestión de RCD (en fase de diseño) y un Plan de gestión de RCD (en fase de ejecución). Entre estas medidas destaca el poder conocer, con la antelación suficiente, la cantidad y el momento en que los RCD son generados, para así poder planificar la gestión más adecuada para cada categoría de RCD. Es por ello que el desarrollo de cualquier instrumento que determine la estimación de RCD así como iniciativas para su control debe ser considerado como una herramienta para dar respuestas reales en el campo de la sostenibilidad en la edificación. Por todo lo anterior, el principal objetivo de la Tesis Doctoral es mejorar la gestión actual de los RCD, a través de la elaboración e implementación en obra de un Sistema de gestión de RCD en fase de ejecución que podrá ser incluido en el Sistema de Gestión Ambiental de las empresas constructoras. Para ello, se ha identificado la actividad que más residuo genera, así como las diferentes categorías de RCD generadas durante su ejecución, a través del análisis de nueve obras de edificación de nueva planta. Posteriormente, se han determinado y evaluado, en función de su eficacia y viabilidad, veinte buenas prácticas encaminadas a reducir la generación de RCD. También, se han identificado y evaluado, en función de su coste económico, cinco alternativas de gestión para cada categoría de RCD generada. Por último, se ha desarrollado e implementado un Sistema de Gestión de RCD en una empresa de construcción real. En definitiva, el Sistema de Gestión de RCD propuesto contiene una herramienta de estimación de RCD y también proporciona una relación de buenas prácticas, según su viabilidad y eficacia, sobre los aspectos más significativos en cuanto a la gestión de RCD se refiere. El uso de este Sistema de gestión de RCD ayudará a los técnicos de la construcción en el desarrollo de los documentos "Estudio de gestión de RCD " y "Plan de gestión de RCD " - requeridos por ley -. Además, el Sistema promueve la gestión ambiental de la empresa, favoreciendo la cohesión del proceso constructivo, estableciendo responsabilidades en el ámbito de RCD y proporcionando un mayor control sobre el proceso. En conclusión, la implementación de un sistema de gestión de RCD en obra ayuda a conseguir una actividad de edificación, cuyo principal objetivo sea la generación de residuos cero. ABSTRACT Currently, in the building sector, the main construction companies are considering environmental issues, not being limited to the current legislation, and seeking the implementation of good practices. While this fact is a reality for large construction companies, still the vast majority of construction companies (small and medium enterprises) need to accept this trend. In this sense, official publications and statistics reveal that the construction sector remains with the lowest number of certified Environmental Management Systems (EMS) compared to other industrial sectors, mainly due to the peculiarities of its activity. Moreover, the construction industry in Spain generates large volumes of construction and demolition waste (CDW) achieving a low recycling rate compared to other European Union countries and to the target set for 2020. Despite the complete change in the legal regime for CDW in Spain, there are still several difficulties for their application at the construction works. Among these difficulties the following can be highlighted: onsite segregation, estimating CDW generation and managing different CDW categories. Despite these difficulties, the proper CDW management must be one of the main aspects considered by construction companies in the EMS. However, at present the EMS used in construction companies consider very superficially CDW management issues. Therefore, current EMS should go a step further and include not only procedures for managing CDW globally, but also specific procedures for each CDW category, taking into account best practices for prevention, minimization and proper CDW management in order to achieve building construction works with zero waste generation. The few scientific studies analysing EMS implementation in construction enterprises focus on studying the benefits and barriers of their implementation. Despite the drawbacks found, implementing an EMS would bring benefits such as improving the corporate image in relation to the environment, ensuring compliance with the law or reducing environmental risks. Also, the international scientific community has shown great interest in defining models to estimate in advance the CDW that will be generated during the building construction or rehabilitation works. These studies analyse the overall waste generation and its different CDW categories. However, despite the many studies found on CDW quantification, analysing its evolution throughout the construction activities is a factor that must be further studied and discussed in greater depth, as results would be of great significance when planning the CDW management. According to the scientific studies analysing the implementation of good environmental practices in construction sites, it seems that, in general, the CDW collection system is done in a decentralized manner by each subcontracted company. In addition, the corporate image generated when poor practices are done may adversely affect the company's reputation and can result in loss of contracts. Finally, although there are numerous guides and manuals of good practices for CDW management, no references have been found implementing these measures in the Environmental Management System of the construction companies. From all the above, this thesis aims to provide answers to reduce the environmental impact caused by CDW generation in building construction works, in order to get a building process with zero waste generation. In this sense, is essential to generate new knowledge in order to implement a system which can carry out comprehensive management of CDW generated onsite, at the design stage until the end of its life cycle, taking into account both technical and economic criteria. Therefore, the main objective of this thesis is to define and implement a CDW management system for residential building construction works, helping construction agents not only to manage the CDW in accordance with current legislation, but also minimizing their generation on site by applying best practices, resulting in achieving the goal of zero waste in building works.
Resumo:
La tesis está focalizada en la resolución de problemas de optimización combinatoria, haciendo uso de las opciones tecnológicas actuales que ofrecen las tecnologías de la información y las comunicaciones, y la investigación operativa. Los problemas de optimización combinatoria se resuelven en general mediante programación lineal y metaheurísticas. La aplicación de las técnicas de resolución de los problemas de optimización combinatoria requiere de una elevada carga computacional, y los algoritmos deben diseñarse, por un lado pensando en la efectividad para encontrar buenas soluciones del problema, y por otro lado, pensando en un uso adecuado de los recursos informáticos disponibles. La programación lineal y las metaheurísticas son técnicas de resolución genéricas, que se pueden aplicar a diferentes problemas, partiendo de una base común que se particulariza para cada problema concreto. En el campo del desarrollo de software, los frameworks cumplen esa función de comenzar un proyecto con el trabajo general ya disponible, con la opción de cambiar o extender ese comportamiento base o genérico, para construir el sistema concreto, lo que permite reducir el tiempo de desarrollo, y amplía las posibilidades de éxito del proyecto. En esta tesis se han desarrollado dos frameworks de desarrollo. El framework ILP permite modelar y resolver problemas de programación lineal, de forma independiente al software de resolución de programación lineal que se utilice. El framework LME permite resolver problemas de optimización combinatoria mediante metaheurísticas. Tradicionalmente, las aplicaciones de resolución de problemas de optimización combinatoria son aplicaciones de escritorio que permiten gestionar toda la información de entrada del problema y resuelven el problema en local, con los recursos hardware disponibles. Recientemente ha aparecido un nuevo paradigma de despliegue y uso de aplicaciones que permite compartir recursos informáticos especializados por Internet. Esta nueva forma de uso de recursos informáticos es la computación en la nube, que presenta el modelo de software como servicio (SaaS). En esta tesis se ha construido una plataforma SaaS, para la resolución de problemas de optimización combinatoria, que se despliega sobre arquitecturas compuestas por procesadores multi-núcleo y tarjetas gráficas, y dispone de algoritmos de resolución basados en frameworks de programación lineal y metaheurísticas. Toda la infraestructura es independiente del problema de optimización combinatoria a resolver, y se han desarrollado tres problemas que están totalmente integrados en la plataforma SaaS. Estos problemas se han seleccionado por su importancia práctica. Uno de los problemas tratados en la tesis, es el problema de rutas de vehículos (VRP), que consiste en calcular las rutas de menor coste de una flota de vehículos, que reparte mercancías a todos los clientes. Se ha partido de la versión más clásica del problema y se han hecho estudios en dos direcciones. Por un lado se ha cuantificado el aumento en la velocidad de ejecución de la resolución del problema en tarjetas gráficas. Por otro lado, se ha estudiado el impacto en la velocidad de ejecución y en la calidad de soluciones, en la resolución por la metaheurística de colonias de hormigas (ACO), cuando se introduce la programación lineal para optimizar las rutas individuales de cada vehículo. Este problema se ha desarrollado con los frameworks ILP y LME, y está disponible en la plataforma SaaS. Otro de los problemas tratados en la tesis, es el problema de asignación de flotas (FAP), que consiste en crear las rutas de menor coste para la flota de vehículos de una empresa de transporte de viajeros. Se ha definido un nuevo modelo de problema, que engloba características de problemas presentados en la literatura, y añade nuevas características, lo que permite modelar los requerimientos de las empresas de transporte de viajeros actuales. Este nuevo modelo resuelve de forma integrada el problema de definir los horarios de los trayectos, el problema de asignación del tipo de vehículo, y el problema de crear las rotaciones de los vehículos. Se ha creado un modelo de programación lineal para el problema, y se ha resuelto por programación lineal y por colonias de hormigas (ACO). Este problema se ha desarrollado con los frameworks ILP y LME, y está disponible en la plataforma SaaS. El último problema tratado en la tesis es el problema de planificación táctica de personal (TWFP), que consiste en definir la configuración de una plantilla de trabajadores de menor coste, para cubrir una demanda de carga de trabajo variable. Se ha definido un modelo de problema muy flexible en la definición de contratos, que permite el uso del modelo en diversos sectores productivos. Se ha definido un modelo matemático de programación lineal para representar el problema. Se han definido una serie de casos de uso, que muestran la versatilidad del modelo de problema, y permiten simular el proceso de toma de decisiones de la configuración de una plantilla de trabajadores, cuantificando económicamente cada decisión que se toma. Este problema se ha desarrollado con el framework ILP, y está disponible en la plataforma SaaS. ABSTRACT The thesis is focused on solving combinatorial optimization problems, using current technology options offered by information technology and communications, and operations research. Combinatorial optimization problems are solved in general by linear programming and metaheuristics. The application of these techniques for solving combinatorial optimization problems requires a high computational load, and algorithms are designed, on the one hand thinking to find good solutions to the problem, and on the other hand, thinking about proper use of the available computing resources. Linear programming and metaheuristic are generic resolution techniques, which can be applied to different problems, beginning with a common base that is particularized for each specific problem. In the field of software development, frameworks fulfill this function that allows you to start a project with the overall work already available, with the option to change or extend the behavior or generic basis, to build the concrete system, thus reducing the time development, and expanding the possibilities of success of the project. In this thesis, two development frameworks have been designed and developed. The ILP framework allows to modeling and solving linear programming problems, regardless of the linear programming solver used. The LME framework is designed for solving combinatorial optimization problems using metaheuristics. Traditionally, applications for solving combinatorial optimization problems are desktop applications that allow the user to manage all the information input of the problem and solve the problem locally, using the available hardware resources. Recently, a new deployment paradigm has appeared, that lets to share hardware and software resources by the Internet. This new use of computer resources is cloud computing, which presents the model of software as a service (SaaS). In this thesis, a SaaS platform has been built for solving combinatorial optimization problems, which is deployed on architectures, composed of multi-core processors and graphics cards, and has algorithms based on metaheuristics and linear programming frameworks. The SaaS infrastructure is independent of the combinatorial optimization problem to solve, and three problems are fully integrated into the SaaS platform. These problems have been selected for their practical importance. One of the problems discussed in the thesis, is the vehicle routing problem (VRP), which goal is to calculate the least cost of a fleet of vehicles, which distributes goods to all customers. The VRP has been studied in two directions. On one hand, it has been quantified the increase in execution speed when the problem is solved on graphics cards. On the other hand, it has been studied the impact on execution speed and quality of solutions, when the problem is solved by ant colony optimization (ACO) metaheuristic, and linear programming is introduced to optimize the individual routes of each vehicle. This problem has been developed with the ILP and LME frameworks, and is available in the SaaS platform. Another problem addressed in the thesis, is the fleet assignment problem (FAP), which goal is to create lower cost routes for a fleet of a passenger transport company. It has been defined a new model of problem, which includes features of problems presented in the literature, and adds new features, allowing modeling the business requirements of today's transport companies. This new integrated model solves the problem of defining the flights timetable, the problem of assigning the type of vehicle, and the problem of creating aircraft rotations. The problem has been solved by linear programming and ACO. This problem has been developed with the ILP and LME frameworks, and is available in the SaaS platform. The last problem discussed in the thesis is the tactical planning staff problem (TWFP), which is to define the staff of lower cost, to cover a given work load. It has been defined a very rich problem model in the definition of contracts, allowing the use of the model in various productive sectors. It has been defined a linear programming mathematical model to represent the problem. Some use cases has been defined, to show the versatility of the model problem, and to simulate the decision making process of setting up a staff, economically quantifying every decision that is made. This problem has been developed with the ILP framework, and is available in the SaaS platform.
Resumo:
O presente trabalho tem como objetivo descrever e avaliar o impacto da implantação do programa De volta para casa, na consolidação da reforma psiquiátrica no Brasil. O método adotado foi a pesquisa quanti- qualitativa numa abordagem de estudo de caso. O local do estudo foi às três (03) residências terapêuticas localizadas no município de Santo André. Todos os 25 (vinte e cinco) moradores foram sujeitos da pesquisa, utilizamos como instrumentos: entrevista semi-estruturada, livro de anotações diárias e os prontuários. Os resultados forma analisados segundo Bardin (1979) construindo categorias que demonstrassem com clareza: o perfil sócio demográfico dos egressos de hospitais psiquiátricos, e demonstrasse os indicadores de qualidade e autonomia. Procurando focar a implementação do processo de reabilitação psicossocial com estes moradores.
Resumo:
O presente trabalho tem como objetivo descrever e avaliar o impacto da implantação do programa De volta para casa, na consolidação da reforma psiquiátrica no Brasil. O método adotado foi a pesquisa quanti- qualitativa numa abordagem de estudo de caso. O local do estudo foi às três (03) residências terapêuticas localizadas no município de Santo André. Todos os 25 (vinte e cinco) moradores foram sujeitos da pesquisa, utilizamos como instrumentos: entrevista semi-estruturada, livro de anotações diárias e os prontuários. Os resultados forma analisados segundo Bardin (1979) construindo categorias que demonstrassem com clareza: o perfil sócio demográfico dos egressos de hospitais psiquiátricos, e demonstrasse os indicadores de qualidade e autonomia. Procurando focar a implementação do processo de reabilitação psicossocial com estes moradores.
Resumo:
A presente dissertação tem como tema central a onerosidade excessiva na revisão e extinção dos contratos no direito civil brasileiro. Ela aborda as hipóteses de rompimento do princípio do equilíbrio econômico contratual na fase de execução dos contratos em virtude da superveniência de fatos extraordinários e imprevisíveis que interrompem sua originária relação de equivalência. O presente estudo divide-se em seis grandes partes. Em primeiro lugar, fazem-se necessárias uma introdução e uma descrição da problemática relacionada ao tema. Em seguida, apresenta-se a origem histórica da revisão e da extinção contratual a partir do exame da cláusula rebus sic stantibus. Feito isso, são relatadas as teorias que as fundamentam pela doutrina e pela jurisprudência antes do advento do texto legal expresso que trata da matéria. Concluída essa fase histórica, analisa-se o direito positivo brasileiro vigente, primeiramente, por questões cronológicas, a revisão por onerosidade excessiva no Código de Defesa do Consumidor. Posteriormente, as disposições legais inseridas no Código Civil que possibilitam a revisão e resolução dos contratos por onerosidade excessiva, com uma análise dogmática dos pressupostos positivos e negativos necessários à aplicação dos arts. 317 e 478 do Código Civil. Em seguida, o estudo procura analisar algumas questões pontuais relacionadas à aplicação dos dois artigos, tais como: (i) quem tem legitimidade e interesse para requerer a revisão e resolução dos contratos, de acordo com os arts. 317 e 478 do Código Civil, respectivamente; (ii) qual é o papel do juiz na revisão e resolução dos contratos, de acordo com os arts. 317 e 478 do Código Civil, respectivamente; e (iii) se há concorrência na aplicação desses artigos ou deve ser observado um procedimento sequencial em atenção ao princípio da preservação dos contratos. Finalmente, o trabalho apresenta breve síntese e conclusões.
Resumo:
San Antonio, actual pedanía de 2.100 hb situada a 5 km de la ciudad de Requena, es un ejemplo de transformación del paisaje por efecto de la colonización humana. En 1752 poblaban esta partida dos docenas de familias de labradores, jornaleros y pastores repartidos en una veintena de casas dispersas por la campiña. La propiedad de la tierra estaba en manos de una docena de terratenientes forasteros y del concejo municipal de Requena. La superficie cultivada ascendía a uno 600 almudes de regadío y 1.000 de secano. Cien años más tarde había 730 en riego y 3.700 en secano. Este incremento estuvo acompañado de una expansión del viñedo y los cereales, a costa de pastizales y baldíos, y de una distribución y traspaso parcial de la propiedad de la tierra a manos de los colonos que se multiplicaron por diez en poco más de un siglo. Las causas que propiciaron aquella transformación fueron básicamente dos: la desamortización y venta de bienes concejiles y eclesiásticos, y la proliferación de contratos de plantación de viña a medias, mediante los cuales decenas de jornaleros lograron hacerse con una pequeña propiedad vitícola.
Resumo:
In this paper, we describe the regulations governing the rental markets for agricultural land in selected EU member states and candidate countries. The analysis focuses on various kinds of regulations and institutions connected with the land rental market, including price, tenancy duration, quantity and other regulations, as well as transaction costs. The diverse government regulations on price restrictions and tenancy duration are analysed, along with the social norms observed for rental payments and contracts. The paper also examines the type and registration of contracts, the contract enforcement rules, the regulations on the inheritability of contracts and the pre-emptive right of tenants to buy the land.
Resumo:
Investigation of the Middle Miocene-Pleistocene succession in cores at ODP Site 817A (Leg 133), drilled on the slope south of the Queensland Plateau, identified the various material fluxes contributing to sedimentation and has determined thereby the paleogeographic events which occurred close to the studied area and influenced these fluxes. To determine proportions of platform origin and of plankton origin of carbonate mud, two reference sediments were collected: (1) back-reef carbonate mud from the Young Reef area (Great Barrier Reef); and (2) Late Miocene chalk from the Loyalty Basin, off New Caledonia. Through their biofacies and mineralogical and geochemical characters, these reference sediments were used to distinguish the proportions of platform and basin components in carbonate muds of 25 core samples from Hole 817A. Two "origin indexes" (i1 and i2) relate the proportion in platform and basin materials. The relative sedimentation rate is inferred from the high-frequency cycles determined by redox intervals in the cores. Bulk carbonate deposited in each core has been calculated in two ways with close results: (1) from calcimetric data available in the Leg 133 preliminary reports (Davies et al., 1991); and (2) from average magnetic susceptibility of cores, a value negatively correlated to the average carbonate content. Vertical changes in sedimentation rates, in carbonate content, in origin indexes and in "linear fluxes" document the evolution of sediment origins from platform carbonates, planktonic carbonates and insoluble material through time. These data are augmented with the variations in organic-matter content through the 817A succession. The observed changes and their interpretation are not modified by compaction, and are compatible with major paleogeographic events including drowning of the Queensland Plateau (Middle Miocene-Early Pliocene) and the renewal of shallow carbonate production, (1) during the Late Pliocene, and (2) from the Early Pleistocene. The birth and growth of the Great Barrier Reef is also recorded from 0.5 Ma by a strengthening of detrital carbonate deposition and possibly by a lack of clay minerals in the 4 upper cores, a response to trapping of terrigenous material behind this barrier. In addition, a maximum of biological silica production is displayed in the Middle Miocene. These changes constrain the time of events and the sequence-stratigraphy framework some components of which are transgression surface, maximum flooding surface and low-stand turbidites. Sedimentation rates and material fluxes show cycles lasting 1.75 Myr. Whatever their origin (climatic and/or eustatic) these cycles affected the planktonic production primarily. The changes also show that major carbonate variations in the deposits are due to a dilution effect by insoluble material (clay, biogenic silica and volcanic glasses) and that plankton productivity, controlling the major fraction of carbonate sedimentation, depends principally on terrigenous supplies, but also on deep-water upwelling. Accuracy of the method is reduced by redeposition, reworking, and probable occurrence of hiatuses.