920 resultados para INTELLIGENCE SYSTEMS METHODOLOGY
Resumo:
Modern managers are under tremendous pressure in attempting to fulfil a profoundly complex managerial task, that of handling information resources. Information management, an intricate process requiring a high measure of human cognition and discernment, involves matching a manager's lack of information processing capacity against his information needs, with voluminous information at his disposal. The nature of the task will undoubtedly become more complex in the case of a large organisation. Management of large-scale organisations is therefore an exceedingly challenging prospect for any manager to be faced with. A system that supports executive information needs will help reduce managerial and informational mismatches. In the context of the Malaysian public sector, the task of overall management lies with the Prime Minister and the Cabinet. The Prime Minister's Office is presently supporting the Prime Minister's information and managerial needs, although not without various shortcomings. The rigid formalised structure predominant of the Malaysian public sector, so opposed to dynamic treatment of problematic issues as faced by that sector, further escalates the managerial and organisational problem of coping with a state of complexity. The principal features of the research are twofold: the development of a methodology for diagnosing the problem organisation' and the design of an office system. The methodological development is done in the context of the Malaysian public sector, and aims at understanding the complexity of its communication and control situation. The outcome is a viable model of the public sector. `Design', on the other hand, is developing a syntax or language for office systems which provides an alternative to current views on office systems. The design is done with reference to, rather than for, the Prime Minister's Office. The desirable outcome will be an office model called Office Communication and Information System (OCIS).
Resumo:
The widespread implementation of Manufacturing Resource Planning (MRPII) systems in this country and abroad and the reported dissatisfaction with their use formed the initial basis of this piece of research which concentrates on the fundamental theory and design of the Closed Loop MRPII system itself. The dissertation concentrates on two key aspects namely; how Master Production Scheduling is carried out in differing business environments and how well the `closing of the loop' operates by checking the capcity requirements of the different levels of plans within an organisation. The main hypothesis which is tested is that in U.K. manufacturing industry, resource checks are either not being carried out satisfactorily or they are not being fed back to the appropriate plan in a timely fashion. The research methodology employed involved initial detailed investigations into Master Scheduling and capacity planning in eight diverse manufacturing companies. This was followed by a nationwide survey of users in 349 companies, a survey of all the major suppliers of Production Management software in the U.K. and an analysis of the facilities offered by current software packages. The main conclusion which is drawn is that the hypothesis is proved in the majority of companies in that only just over 50% of companies are attempting Resource and Capacity Planning and only 20% are successfully feeding back CRP information to `close the loop'. Various causative factors are put forward and remedies are suggested.
Resumo:
The recent explosive growth in advanced manufacturing technology (AMT) and continued development of sophisticated information technologies (IT) is expected to have a profound effect on the way we design and operate manufacturing businesses. Furthermore, the escalating capital requirements associated with these developments have significantly increased the level of risk associated with initial design, ongoing development and operation. This dissertation has examined the integration of two key sub-elements of the Computer Integrated Manufacturing (CIM) system, namely the manufacturing facility and the production control system. This research has concentrated on the interactions between production control (MRP) and an AMT based production facility. The disappointing performance of such systems has been discussed in the context of a number of potential technological and performance incompatibilities between these two elements. It was argued that the design and selection of operating policies for both is the key to successful integration. Furthermore, policy decisions are shown to play an important role in matching the performance of the total system to the demands of the marketplace. It is demonstrated that a holistic approach to policy design must be adopted if successful integration is to be achieved. It is shown that the complexity of the issues resulting from such an approach required the formulation of a structured design methodology. Such a methodology was subsequently developed and discussed. This combined a first principles approach to the behaviour of system elements with the specification of a detailed holistic model for use in the policy design environment. The methodology aimed to make full use of the `low inertia' characteristics of AMT, whilst adopting a JIT configuration of MRP and re-coupling the total system to the market demands. This dissertation discussed the application of the methodology to an industrial case study and the subsequent design of operational policies. Consequently a novel approach to production control resulted. A central feature of which was a move toward reduced manual intervention in the MRP processing and scheduling logic with increased human involvement and motivation in the management of work-flow on the shopfloor. Experimental results indicated that significant performance advantages would result from the adoption of the recommended policy set.
Resumo:
This thesis reviews the existing manufacturing control techniques and identifies their practical drawbacks when applied in a high variety, low and medium volume environment. It advocates that the significant drawbacks inherent in such systems, could impair their applications under such manufacturing environment. The key weaknesses identified in the system were: capacity insensitive nature of Material Requirements Planning (MRP); the centralised approach to planning and control applied in Manufacturing Resources Planning (MRP IT); the fact that Kanban can only be used in repetitive environments; Optimised Productivity Techniques's (OPT) inability to deal with transient bottlenecks, etc. On the other hand, cellular systems offer advantages in simplifying the control problems of manufacturing and the thesis reviews systems designed for cellular manufacturing including Distributed Manufacturing Resources Planning (DMRP) and Flexible Manufacturing System (FMS) controllers. It advocates that a newly developed cellular manufacturing control methodology, which is fully automatic, capacity sensitive and responsive, has the potential to resolve the core manufacturing control problems discussed above. It's development is envisaged within the framework of a DMRP environment, in which each cell is provided with its own MRP II system and decision making capability. It is a cellular based closed loop control system, which revolves on single level Bill-Of-Materials (BOM) structure and hence provides better linkage between shop level scheduling activities and relevant entries in the MPS. This provides a better prospect of undertaking rapid response to changes in the status of manufacturing resources and incoming enquiries. Moreover, it also permits automatic evaluation of capacity and due date constraints and hence facilitates the automation of MPS within such system. A prototype cellular manufacturing control model, was developed to demonstrate the underlying principles and operational logic of the cellular manufacturing control methodology, based on the above concept. This was shown to offer significant advantages from the prospective of operational planning and control. Results of relevant tests proved that the model is capable of producing reasonable due date and undertake automation of MPS. The overall performance of the model proved satisfactory and acceptable.
Resumo:
Computerised production control developments have concentrated on Manufacturing Resources Planning (MRP II) systems. The literature suggests however, that despite the massive investment in hardware, software and management education, successful implementation of such systems in manufacturing industries has proved difficult. This thesis reviews the development of production planning and control systems, in particular, investigates the causes of failures in implementing MRP/MRP II systems in industrial environments and argues that the centralised and top-down planning structure, as well as the routine operational methodology of such systems, is inherently prone to failure. The thesis reviews the control benefits of cellular manufacturing systems but concludes that in more dynamic manufacturing environments, techniques such as Kanban are inappropriate. The basic shortcomings of MRP II systems are highlighted and a new enhanced operational methodology based on distributed planning and control principles is introduced. Distributed Manufacturing Resources Planning (DMRP), was developed as a capacity sensitive production planning and control solution for cellular manufacturing environments. The system utilises cell based, independently operated MRP II systems, integrated into a plant-wide control system through a Local Area Network. The potential benefits of adopting the system in industrial environments is discussed and the results of computer simulation experiments to compare the performance of the DMRP system against the conventional MRP II systems presented. DMRP methodology is shown to offer significant potential advantages which include ease of implementation, cost effectiveness, capacity sensitivity, shorter manufacturing lead times, lower working in progress levels and improved customer service.
Resumo:
This research concerns information systems and information systems development. The thesis describes an approach to information systems development called Multiview. This is a methodology which seeks to combine the strengths of a number of different, existing approaches in a coherent manner. Many of these approaches are radically different in terms of concepts, philosophy, assumptions, methods, techniques and tools. Three case studies are described presenting Multiview 'in action'. The first is used mainly to expose the strengths and weaknesses of an early version of the approach discussed in the thesis. Tools and techniques are described in the thesis which aim to strengthen the approach. Two further case studies are presented to illustrate the use of this second version of Multiview. This is not put forward as an 'ideal methodology' and the case studies expose some of the difficulties and practical problems of information systems work and the use of the methodology. A more contingency based approach to information systems development is advocated using Multiview as a framework rather than a prescriptive tool. Each information systems project and the use of the framework is unique, contingent on the particular problem situation. The skills of different analysts, the backgrounds of users and the situations in which they are constrained to work have always to be taken into account in any project. The realities of the situation will cause departure from the 'ideal methodology' in order to allow for the exigencies of the real world. Multiview can therefore be said to be an approach used to explore the application area in order to develop an information system.
Resumo:
This thesis deals with the integration of the manpower criterion with the strategic decision making processes of technological projects in developing countries. This integration is to be achieved by ensuring the involvement of the actors, who have relevant roles and responsibilities along the whole life cycle of the project, in the strategic decision making phases of the project. The relevance of the actors is ascertained by the use of a responsibility index which relates their responsibility to the project's constituent stages. In the context of a technological project in a typical centrally-planned developing environment, the actors are identified as Arbiters, Planners, Implementors and Operators and their roles, concerns and objectives are derived. In this context, the actors are usually government and non-government organisations. Hence, decision making will involve multiple agencies as well as multiple criteria. A methodology covering the whole decision-making process, from options generation to options selection, and adopting Saaty's Analytical Hierarchy Process as an operational tool is proposed to deal with such multiple-criteria, multipleagency decision situations. The methodology is intended to integrate the consideration of the relevant criteria, the prevailing environmental and policy factors, and the concerns and objectives of the relevant actors into a unifying decision-making process which strives to facilitate enlightened decision making and to enhance learning and interaction. An extensive assessment of the methodology's feasibility, based on a specific technological project within the Iraqi oil industry is included, and indicates that the methodology should be both useful and implementable.
Resumo:
This thesis offers a methodology to study and design effective communication mechanisms in human activities. The methodology is focused in the management of complexity. It is argued that complexity is not something objective that can be worked out analytically, but something subjective that depends on the viewpoint. Also it is argued that while certain social contexts may inhibit, others may enhance the viewpoint's capabilities to deal with complexity. Certain organisation structures are more likely than others to allow individuals to release their potentials. Thus, the relevance of studying and designing effective organisations. The first part of the thesis offers a `cybernetic methodology' for problem solving in human activities, the second offers a `method' to study and design organisations. The cybernetics methodology discussed in this work is rooted in second order cybernetics, or the cybernetics of the observing systems (Von Foester 1979, Maturana and Varela 1980). Its main tenet is that the known properties of the real world reside in the individual and not in the world itself. This view, which puts emphasis in a, by nature, one sided and unilateral appreciation of reality, triggers the need for dialogue and conversations to construct it. The `method' to study and design organisations, it based on Beer's Viable System Model (Beer 1979, 1981, 1985). This model permits us to assess how successful is an organisation in coping with its environmental complexity, and, moreover, permits us to establish how to make more effective the responses to this complexity. These features of the model are of great significance in a world where complexity is perceived to be growing at an unthinkable pace. But, `seeing' these features of the model assumes an effective appreciation of organisational complexity; hence the need for the methodological discussions offered by the first part of the thesis.
Resumo:
This thesis was focused on theoretical models of synchronization to cortical dynamics as measured by magnetoencephalography (MEG). Dynamical systems theory was used in both identifying relevant variables for brain coordination and also in devising methods for their quantification. We presented a method for studying interactions of linear and chaotic neuronal sources using MEG beamforming techniques. We showed that such sources can be accurately reconstructed in terms of their location, temporal dynamics and possible interactions. Synchronization in low-dimensional nonlinear systems was studied to explore specific correlates of functional integration and segregation. In the case of interacting dissimilar systems, relevant coordination phenomena involved generalized and phase synchronization, which were often intermittent. Spatially-extended systems were then studied. For locally-coupled dissimilar systems, as in the case of cortical columns, clustering behaviour occurred. Synchronized clusters emerged at different frequencies and their boundaries were marked through oscillation death. The macroscopic mean field revealed sharp spectral peaks at the frequencies of the clusters and broader spectral drops at their boundaries. These results question existing models of Event Related Synchronization and Desynchronization. We re-examined the concept of the steady-state evoked response following an AM stimulus. We showed that very little variability in the AM following response could be accounted by system noise. We presented a methodology for detecting local and global nonlinear interactions from MEG data in order to account for residual variability. We found crosshemispheric nonlinear interactions of ongoing cortical rhythms concurrent with the stimulus and interactions of these rhythms with the following AM responses. Finally, we hypothesized that holistic spatial stimuli would be accompanied by the emergence of clusters in primary visual cortex resulting in frequency-specific MEG oscillations. Indeed, we found different frequency distributions in induced gamma oscillations for different spatial stimuli, which was suggestive of temporal coding of these spatial stimuli. Further, we addressed the bursting character of these oscillations, which was suggestive of intermittent nonlinear dynamics. However, we did not observe the characteristic-3/2 power-law scaling in the distribution of interburst intervals. Further, this distribution was only seldom significantly different to the one obtained in surrogate data, where nonlinear structure was destroyed. In conclusion, the work presented in this thesis suggests that advances in dynamical systems theory in conjunction with developments in magnetoencephalography may facilitate a mapping between levels of description int he brain. this may potentially represent a major advancement in neuroscience.
Resumo:
This study is concerned with several proposals concerning multiprocessor systems and with the various possible methods of evaluating such proposals. After a discussion of the advantages and disadvantages of several performance evaluation tools, the author decides that simulation is the only tool powerful enough to develop a model which would be of practical use, in the design, comparison and extension of systems. The main aims of the simulation package developed as part of this study are cost effectiveness, ease of use and generality. The methodology on which the simulation package is based is described in detail. The fundamental principles are that model design should reflect actual systems design, that measuring procedures should be carried out alongside design that models should be well documented and easily adaptable and that models should be dynamic. The simulation package itself is modular, and in this way reflects current design trends. This approach also aids documentation and ensures that the model is easily adaptable. It contains a skeleton structure and a library of segments which can be added to or directly swapped with segments of the skeleton structure, to form a model which fits a user's requirements. The study also contains the results of some experimental work carried out using the model, the first part of which tests• the model's capabilities by simulating a large operating system, the ICL George 3 system; the second part deals with general questions and some of the many proposals concerning multiprocessor systems.
Resumo:
This research investigates the contribution that Geographic Information Systems (GIS) can make to the land suitability process used to determine the effects of a climate change scenario. The research is intended to redress the severe under representation of Developing countries within the literature examining the impacts of climatic change upon crop productivity. The methodology adopts some of the Intergovernmental Panel on Climate Change (IPCC) estimates for regional climate variations, based upon General Circulation Model predictions (GCMs) and applies them to a baseline climate for Bangladesh. Utilising the United Nations Food & Agricultural Organisation's Agro-ecological Zones land suitability methodology and crop yield model, the effects of the scenario upon agricultural productivity on 14 crops are determined. A Geographic Information System (IDRISI) is adopted in order to facilitate the methodology, in conjunction with a specially designed spreadsheet, used to determine the yield and suitability rating for each crop. A simple optimisation routine using the GIS is incorporated to provide an indication of the 'maximum theoretical' yield available to the country, should the most calorifically significant crops be cultivated on each land unit both before and after the climate change scenario. This routine will provide an estimate of the theoretical population supporting capacity of the country, both now and in the future, to assist with planning strategies and research. The research evaluates the utility of this alternative GIS based methodology for the land evaluation process and determines the relative changes in crop yields that may result from changes in temperature, photosynthesis and flooding hazard frequency. In summary, the combination of a GIS and a spreadsheet was successful, the yield prediction model indicates that the application of the climate change scenario will have a deleterious effect upon the yields of the study crops. Any yield reductions will have severe implications for agricultural practices. The optimisation routine suggests that the 'theoretical maximum' population supporting capacity is well in excess of current and future population figures. If this agricultural potential could be realised however, it may provide some amelioration from the effects of climate change.
Resumo:
This thesis is concerned with Organisational Problem Solving. The work reflects the complexities of organisational problem situations and the eclectic approach that has been necessary to gain an understanding of the processes involved. The thesis is structured into three main parts. Part I describes the author's understanding of problems and suitable approaches. Chapter 2 identifies the Transcendental Realist (TR) view of science (Harre 1970, Bhaskar 1975) as the best general framework for identifying suitable approaches to complex organisational problems. Chapter 3 discusses the relationship between Checkland's methodology (1972) and TR. The need to generate iconic (explanatory) models of the problem situation is identified and the ability of viable system modelling to supplement the modelling stage of the methodology is explored in Chapter 4. Chapter 5 builds further on the methodology to produce an original iconic model of the methodological process. The model characterises the mechanisms of organisational problem situations as well as desirable procedural steps. The Weltanschauungen (W's) or "world views" of key actors is recognised as central to the mechanisms involved. Part II describes the experience which prompted the theoretical investigation. Chapter 6 describes the first year of the project. The success of this stage is attributed to the predominance of a single W. Chapter 7 describes the changes in the organisation which made the remaining phase of the project difficult. These difficulties are attributed to a failure to recognise the importance of differing W's. Part III revisits the theoretical and organisational issues. Chapter 8 identifies a range of techniques embodying W's which are compatible with .the framework of Part I and which might usefully supplement it. Chapter 9 characterises possible W's in the sponsoring organisation. Throughout the work, an attempt 1s made to reflect the process as well as the product of the author's leaving.
Resumo:
The importance of non-technical factors in the design and implementation of information systems has been increasingly recognised by both researchers and practitioners, and recent literature highlights the need for new tools and techniques with an organisational, rather than technical, focus. The gap between what is technically possible and what is generally practised, is particularly wide in the sales and marketing field. This research describes the design and implementation of a decision support system (DSS) for marketing planning and control in a small, but complex company and examines the nature of the difficulties encountered. An intermediary with functional, rather than technical, expertise is used as a strategy for overcoming these by taking control of the whole of the systems design and implementation cycle. Given the practical nature of the research, an action research approach is adopted with the researcher undertaking this role. This approach provides a detailed case study of what actually happens during the DSS development cycle, allowing the influence of organisational factors to be captured. The findings of the research show how the main focus of the intermediary's role needs to be adapted over the systems development cycle; from coordination and liaison in the pre-design and design stages, to systems champion during the first part of the implementation stage, and finally to catalyst to ensure that the DSS is integrated into the decision-making process. Two practical marketing exercises are undertaken which illustrate the nature of the gap between the provision of information and its use. The lack of a formal approach to planning and control is shown to have a significant effect on the way the DSS is used and the role of the intermediary is extended successfully to accommodate this factor. This leads to the conclusion that for the DSS to play a fully effective role, small firms may need to introduce more structure into their marketing planning, and that the role of the intermediary, or Information Coordinator, should include the responsibility for introducing new techniques and ideas to aid with this.
Resumo:
The work described was carried out as part of a collaborative Alvey software engineering project (project number SE057). The project collaborators were the Inter-Disciplinary Higher Degrees Scheme of the University of Aston in Birmingham, BIS Applied Systems Ltd. (BIS) and the British Steel Corporation. The aim of the project was to investigate the potential application of knowledge-based systems (KBSs) to the design of commercial data processing (DP) systems. The work was primarily concerned with BIS's Structured Systems Design (SSD) methodology for DP systems development and how users of this methodology could be supported using KBS tools. The problems encountered by users of SSD are discussed and potential forms of computer-based support for inexpert designers are identified. The architecture for a support environment for SSD is proposed based on the integration of KBS and non-KBS tools for individual design tasks within SSD - The Intellipse system. The Intellipse system has two modes of operation - Advisor and Designer. The design, implementation and user-evaluation of Advisor are discussed. The results of a Designer feasibility study, the aim of which was to analyse major design tasks in SSD to assess their suitability for KBS support, are reported. The potential role of KBS tools in the domain of database design is discussed. The project involved extensive knowledge engineering sessions with expert DP systems designers. Some practical lessons in relation to KBS development are derived from this experience. The nature of the expertise possessed by expert designers is discussed. The need for operational KBSs to be built to the same standards as other commercial and industrial software is identified. A comparison between current KBS and conventional DP systems development is made. On the basis of this analysis, a structured development method for KBSs in proposed - the POLITE model. Some initial results of applying this method to KBS development are discussed. Several areas for further research and development are identified.
Resumo:
The thesis presents an account of an attempt to utilize expert systems within the domain of production planning and control. The use of expert systems was proposed due to the problematical nature of a particular function within British Steel Strip Products' Operations Department: the function of Order Allocation, allocating customer orders to a production week and site. Approaches to tackling problems within production planning and control are reviewed, as are the general capabilities of expert systems. The conclusions drawn are that the domain of production planning and control contains both `soft' and `hard' problems, and that while expert systems appear to be a useful technology for this domain, this usefulness has by no means yet been demonstrated. Also, it is argued that the main stream methodology for developing expert systems is unsuited for the domain. A problem-driven approach is developed and used to tackle the Order Allocation function. The resulting system, UAAMS, contained two expert components. One of these, the scheduling procedure was not fully implemented due to inadequate software. The second expert component, the product routing procedure, was untroubled by such difficulties, though it was unusable on its own; thus a second system was developed. This system, MICRO-X10, duplicated the function of X10, a complex database query routine used daily by Order Allocation. A prototype version of MICRO-X10 proved too slow to be useful but allowed implementation and maintenance issues to be analysed. In conclusion, the usefulness of the problem-driven approach to expert systems development within production planning and control is demonstrated but restrictions imposed by current expert system software are highlighted in that the abilities of such software to cope with `hard' scheduling constructs and also the slow processing speeds of such software can restrict the current usefulness of expert systems within production planning and control.