983 resultados para Extension project
Resumo:
This thesis examined the long-term impact of the community arts education project Yonder, a collaboration between Education Queensland and Queensland Performing Arts Centre. The findings from the data reveal that the project was still having impact twelve months after its completion and that in some instances the project served as a 'circuit-breaker', especially for special needs students and struggling students. The intervention of a rich arts project proved to be an opportunity for these students to learn in a different way and to perceive themselves in a new and reinvented light. This confidence was found to transfer into other aspects of their learning.
Resumo:
The Queensland Health implementation project failure is the largest IS failure in the southern hemisphere to date, costing $1.25 billion AUD. This case highlights the importance of systematically analysing project failure. It examines the case organization details, royal commission report, auditor general report and 118 witness statements pertaining to the Queensland Health implementation project. The objective of this teaching case is (1) to illustrate the factors that contributed to Queensland Health's disastrous implementation project and (2) to understand the broader applications of this project failure on state and national legislations as well as industry sectors. The case narrative and teaching notes are appropriate for both undergraduate and postgraduate students studying IS and project management subjects.
Resumo:
Construction is one of the most hazardous industries due to its dynamic, temporary, and decentralized nature. The Hong Kong Commissioner for Labor identifies worker behavior as the root cause of construction accidents. Behavior-based safety (BBS) is one effective approach in managing employee safety issues. However, there is little research on the application of BBS in the construction industry. This research proposes an extension of the BBS approach, proactive behavior-based safety (PBBS), to improve construction safety. PBBS integrates the theory of BBS with the technology of Proactive Construction Management System (PCMS). The innovations of PBBS are: (1) automatically monitoring location-based behaviors; (2)quantitatively measuring safety performance; (3) investigating potential causes of unsafe behaviors; and (4) improving the efficiency of safety management. A pilot study of a Hong Kong construction site practicing PBBS was conducted. The experiment results showed that PBBS performed well on construction accident prevention and the Safety Index (SI) of the two project teams, with increased improvements by 36.07% and 44.70% respectively. It is concluded that PBBS is effective and adaptable to construction industry.
Resumo:
Collaborative community development project proposal
Resumo:
Having a clear project definition is crucial for successful construction projects. It affects design quality, project communication between stakeholders and final project performance in terms of cost, schedule and quality. This study examines the relationship between project definition and final project performance through a structural equation model comprising 4 latent constructs and 6 path hypotheses using data from a questionnaire survey of 120 general contractors in the Malaysian construction industry. The results show that in the study population, all three items impact the project performance, but the link between design quality and project performance is indirect. Instead, the clarity of project definition affects project performance indirectly through design quality and project communication and design quality affects project performance indirectly through project communication. The primary contribution is to provide quantitative confirmation of the more general statements made in the literature from around the world and therefore adds to and consolidates existing knowledge. Practical implications derived from the finding are also proposed for various project stakeholders. Furthermore, as lack of the clarity of project definition is a very common occurrence in construction projects globally, these findings have important ramifications for all construction projects in expanding and clarifying existing knowledge on what is needed for the successful delivery of construction projects.
Resumo:
In today's high-pressure work environment, project managers are often forced to “do more with less.” We argue that this imperative can lead project managers to engage in either high-performance or abusive supervision behaviors. To understand this process, we develop a model and associated propositions linking a project manager's cognitive appraisal of project-related demands to high-performance work practices versus abusive supervision behaviors—both of which impact three project outcomes: stakeholder relationships, people-related project success factors, and employee well-being. We propose that the choice between high-performance work practices and abusive supervision behaviors is moderated by a project manager's personal resources (psychological capital, emotional intelligence, and dark triad personality).
Resumo:
Individuals with limb amputation fitted with conventional socket-suspended prostheses often experience socket related discomfort leading to a significant decrease in quality of life.[1-14] Most of these concerns can be overcome with osseointegration, a direct skeletal fixation method where the prosthetic componentry are directly attached to the fixation, resulting in the redundancy of the traditional socket system. There are two stages of osseointegration; Stage one, a titanium implant is inserted into the marrow space of residual limb bone and Stage two, a titanium extension is attached to the fixture. This surgical procedure is currently blooming worldwide, particularly within Queensland. Whilst providing improvements in quality of life, this new method also has potential to minimise the cost required for an amputee to ambulate during daily living. Thus, the aim of this project was to compare the differences in mean cost of services, cost of componentry and labour hours when using osseointegration compared to traditional socket-based prostheses. Data were extracted from Queensland Artificial Limb Services (QALS) database to determine cost of services, type of services and labour hours required to maintain a prosthetic limb. Five trans-femoral amputee male participants (age 46.4±10.1 yrs; height 175.4±16.3 cm; mass 83.8±14.0 kg; time since second stage 22.0± 8.1 mths) met inclusion criteria which was patient had to be more than 12 months post stage two osseointegration procedure. The socket and osseointegration prosthesis variables examined were the mean hours of labour, mean cost of services and mean cost of prosthetic componentry. Statistical analyses were conducted using an ANOVA. The results identified that there were only significant differences in the number of labour hours (p = 0.005) and cost of services (p = 0.021) when comparing the socket and osseointegration prosthetic type. These results identified that the cost of componentry were comparable between the two methods.
Resumo:
Large complex projects often fail spectacularly in terms of cost overruns and delays; witness the London Olympics and the Airbus A380. In this project, we studied the emotional intelligence (EI) of leadership teams involved in such projects. We collected our data from 370 employees in 40 project teams working on large Australian defense contracts. We asked leadership team members to complete a scale measuring their EI, and project team members to rate the success of the projects. We found it was not the mean score, but the highest EI score in the leadership team that predicted members’ project success ratings.
Bayesian networks as a complex system tool in the context of a major industry and university project
Resumo:
The Queensland Transport Industry Workplace Health Intervention project was a Participatory Action Research (PAR) project to investigate the effectiveness of workplace-based nutrition and physical activity health promotion interventions for truck drivers in transport industry workplaces in south-east Queensland. The project was conducted by a research team at the Queensland University of Technology (QUT), and was funded by the Queensland Government under the Healthier.Happier.Workplaces initiative.
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
This essay provides a critical assessment of the Fair Use Project based at the Stanford Center for Internet and Society. In evaluating the efficacy of the Fair Use Project, it is worthwhile considering the litigation that the group has been involved in, and evaluating its performance. Part 1 outlines the history of the Stanford Center for Internet and Society, and the aims and objectives of the Fair Use Project. Part 2 considers the litigation in Shloss v. Sweeney over a biography concerning Lucia Joyce, the daughter of the avant-garde literary great, James Joyce. Part 3 examines the dispute over the Harry Potter Lexicon. Part 4 looks at the controversy over the Shepard Fairey poster of President Barack Obama, and the resulting debate with Associated Press. Part 5 of the essay considers the intervention of the Fair Use Project as an amicus curiae in the ‘Column case’. Part 6 explores the participation of the Fair Use Project as an amicus curiae in the litigation over 60 Years Later, an unauthorised literary sequel to J.D. Salinger’s The Catcher in the Rye. Part 7 of the essay investigates the role of the Fair Use project in disputes over copyright law and musical works. Part 8 investigates the role of the Fair Use Project as an advocate in disputes over copyright law, fair use, documentary films, and internet videos. The conclusion has main three arguments. First, it contends that Australia should establish a Fair Use Project to support creative artists in litigation over copyright exceptions. Second, it maintains that Australia should adopt a flexible, open-ended defence of fair use, and draw upon the rich jurisprudence in the United States on the fair use doctrine. Finally, this paper argues that support should be given at an international level to the proposal for a Treaty on Access to Knowledge.
Resumo:
In a victory for corporate control of cultural heritage, the Supreme Court of the United States has rejected a constitutional challenge to the Sonny Bono Copyright Term Extension Act 1998 (U.S.) by a majority of seven to two. This paper evaluates the litigation in terms of policy debate in a number of discourses — history, intellectual property law, constitutional law and freedom of speech, cultural heritage, economics and competition policy, and international trade. It argues that the extension of the copyright term will inhibit the dissemination of cultural works through the use of new technologies — such as Eric Eldred's Eldritch Press and Project Gutenberg. It concludes that there is a need to resist the attempts of copyright owners to establish the Sonny Bono Copyright Term Extension Act 1998 (U.S.) as an international model for other jurisdictions — such as Australia.
Resumo:
This article considers the debate over patent law, informed consent, and benefit-sharing in the context of biomedical research in respect of Indigenous communities. In particular, it focuses upon three key controversies over large-scale biology projects, involving Indigenous populations. These case studies are representative of the tensions between research organisations, Indigenous communities, and funding agencies. Section two considers the aims and origins of the Human Genome Diversity Project, and criticisms levelled against the venture by Indigenous peak bodies and anti-biotechnology groups, such as the Rural Advancement Foundation International. It examines the ways in which the United Nations Educational, Scientific, and Cultural Organization (UNESCO) grappled with questions of patent law, informed consent, and benefit sharing in relation to population genetics. Section three focuses upon the ongoing litigation in Tilousi v. Arizona State University, and the Havasupai Tribe v. Arizona State University. In this matter, the Havasupai tribe from the Grand Canyon in the United States brought legal action against the Arizona State University and its researchers for using genetic data for unauthorised purposes - namely, genetic research into schizophrenia, migration, and inbreeding. The litigation raises questions about informed consent, negligence, and larger matters of human rights. Section four explores the legal and ethical issues raised by the Genographic Project. It considers the aims and objectives of the venture, and the criticisms levelled against it by Indigenous communities, and anti-biotechnology groups. It examines the response of the United Nations Permanent Forum on Indigenous Issues to the Genographic Project. It charts the debate over the protection of traditional knowledge in various international fora. The conclusion recommends a number of measures to better regulate large-scale biology projects involving the participation of Indigenous communities.
Resumo:
Study Design Cross-sectional study. Objectives To compare erector spinae (ES) muscle fatigue between chronic non-specific lower back pain (CNLBP) sufferers and healthy subjects from a biomechanical perspective during fatiguing isometric lumbar extensions. Background Paraspinal muscle maximal contraction and fatigue are used as a functional predictor for disabilities. The simplest method to determine muscle fatigue is by evaluating the evolution during specific contractions, such as isometric contractions. There are no studies that evaluate the evolution of the ES muscle during fatiguing isometric lumbar extensions and analyse functional and architectural variables. Methods In a pre-calibrated system, participants performed a maximal isometric extension of the lumbar spine for 5 and 30 seconds. Functional variables (torque and muscle activation) and architecture (pennation angle and muscle thickness) were measured using a load cell, surface electromyography and ultrasound, respectively. The results were normalised and a reliability study of the ultrasound measurement was made. Results: The ultrasound measurements were highly reliable, with Cronbach’s alpha values ranging from 0.951 0.981. All measured variables shown significant differences before and after fatiguing isometric lumbar extension. Conclusion During a lumbar isometric extension test, architecture and functional variables of the ES muscle could be analised using ultrasound, surface EMG and load cell. In adition, during an endurance test, ES muscle suffers an acute effect on architectural and functional variables.