998 resultados para Electricity Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

BIPV (building integrated photovoltaics) has progressed in the past years and become an element to be considered in city planning. BIPV has significant influence on microclimate in urban environments and the performance of BIPV is also affected by urban climate. The thermal model and electrical performance model of ventilated BIPV are combined to predict PV temperature and PV power output in Tianjin, China. Then, by using dynamic building energy model, the building cooling load for installing BIPV is calculated. A multi-layer model AUSSSM of urban canopy layer is used to assess the effect of BIPV on the Urban Heat Island (UHI). The simulation results show that in comparison with the conventional roof, the total building cooling load with ventilation PV roof may be decreased by 10%. The UHI effect after using BIPV relies on the surface absorptivity of original building. In this case, the daily total PV electricity output in urban areas may be reduced by 13% compared with the suburban areas due to UHI and solar radiation attenuation because of urban air pollution. The calculation results reveal that it is necessary to pay attention to and further analyze interactions between BIPV and microdimate in urban environments to decrease urban pollution, improve BIPV performance and reduce cooling load. Copyright © 2006 by ASME.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing use of renewable energy technologies for electricity generation, many of which have an unpredictably intermittent nature, will inevitably lead to a greater demand for large-scale electricity storage schemes. For example, the expanding fraction of electricity produced by wind turbines will require either backup or storage capacity to cover extended periods of wind lull. This paper describes a recently proposed storage scheme, referred to here as Pumped Thermal Storage (PTS), and which is based on "sensible heat" storage in large thermal reservoirs. During the charging phase, the system effectively operates as a high temperature-ratio heat pump, extracting heat from a cold reservoir and delivering heat to a hot one. In the discharge phase the processes are reversed and it operates as a heat engine. The round- trip efficiency is limited only by process irreversibilities (as opposed to Second Law limitations on the coefficient of performance and the thermal efficiency of the heat pump and heat engine respectively). PTS is currently being developed in both France and England. In both cases, the schemes operate on the Joule-Brayton (gas turbine) cycle, using argon as the working fluid. However, the French scheme proposes the use of turbomachinery for compression and expansion, whereas for that being developed in England reciprocating devices are proposed. The current paper focuses on the impact of the various process irreversibilities on the thermodynamic round-trip efficiency of the scheme. Consideration is given to compression and expansion losses and pressure losses (in pipe-work, valves and thermal reservoirs); heat transfer related irreversibility in the thermal reservoirs is discussed but not included in the analysis. Results are presented demonstrating how the various loss parameters and operating conditions influence the overall performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing use of renewable energy technologies for electricity generation, many of which have an unpredictably intermittent nature, will inevitably lead to a greater need for electricity storage. Although there are many existing and emerging storage technologies, most have limitations in terms of geographical constraints, high capital cost or low cycle life, and few are of sufficient scale (in terms of both power and storage capacity) for integration at the transmission and distribution levels. This paper is concerned with a relatively new concept which will be referred to here as Pumped Thermal Electricity Storage (PTES), and which may be able to make a significant contribution towards future storage needs. During charge, PTES makes use of a high temperature-ratio heat pump to convert electrical energy into thermal energy which is stored as ‘sensible heat’ in two thermal reservoirs, one hot and one cold. When required, the thermal energy is then converted back to electricity by effectively running the heat pump backwards as a heat engine. The paper focuses on thermodynamic aspects of PTES, including energy and power density, and the various sources of irreversibility and their impact on round-trip efficiency.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Today's fast-paced, dynamic environments mean that for organizations to keep "ahead of the game", engineering managers need to maximize current opportunities and avoid repeating past mistakes. This article describes the development study of a collaborative strategic management tool - the Experience Scan to capture past experience and apply learning from this to present and future situations. Experience Scan workshops were held in a number of different technology organizations, developing and refining the tool until its format stabilized. From participants' feedback, the workshop-based tool was judged to be a useful and efficient mechanism for communication and knowledge management, contributing to organizational learning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is part of a larger PhD research project examining the apparent conflict in UK planning between energy efficiency and conservation for the retrofit of the thermal envelope of the existing building stock. Review of the literature shows that the UK will not meet its 2050 emission reduction target without substantial improvement to the energy performance of the thermal envelope of the existing building stock and that significantly, 40% of the existing stock has heritage status and may be exempted from Building Regulations. A review of UK policy and legislation shows that there are clear national priorities towards reducing emissions and addressing climate change, yet also shows a movement towards local decision making and control. This paper compares the current status of thirteen London Boroughs in respect to their position on thermal envelope retrofit for heritage and traditionally constructed buildings. Data collection is through ongoing surveys and interviews that compare statistical data, planning policies, sustainability and environmental priorities, and Officer decision-making. This paper finds that there is a lack of consistency in application of planning policy across Boroughs and suggests that this is a barrier to the up-take of energy efficient retrofit. Various recommendations are suggested at both national and local level which could help UK planning and planning officers deliver more energy efficient heritage retrofits.