939 resultados para Crack-bridging
Resumo:
The objectives of this research were to develop a low cost fly ash-sand stabilized roadway and to correlate field performance with pavement design assumptions on a county road heavily trafficked by trucks hauling grain. The road was constructed during the summer of 1984. Three test sections comprised of different base thicknesses were incorporated in the roadway and were tested for compressive stength, structural rating, and rut depth. Annual crack surveys showed no appreciable difference in transverse cracking between the test sections and little to no rutting. The sandbase drainage characteristics beneath the roadway may have contributed to the satisfactory performance of the test sections. This project indicates that in spite of the inflated cost of construction due to the research nature of the work, a fly ash-sand base can be a viable alternative for roadway stabilization.
Resumo:
This final report for Phase 1 of the research on epoxy-coated, prestressing strands in precast prestressed concrete (PC) panels has been published in two volumes. This volume, Volume 1--Technical Report, contains the problem description, literature review, and survey results; descriptions of the test specimens, experimental tests, and analytical models; discussions of the analytical and experimental results; summary, conclusions, and recommendations; list of references; and acknowledgment. Volume 2--Supplemental Report contains additional information in the form of summarized responses to the questionnaires; graphs showing the strand forces; figures showing the geometry of the specimens and concrete crack patterns that formed in the strand transfer length and strand development length specimens; and graphs of the concrete strains in the strand transfer length specimens, load-point deflections, and strand-slip measurements for the strand development length specimens.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.
Resumo:
Portland Cement Concrete (PCC) pavement has served the State of Iowa well for many years. The oldest Iowa pavement was placed in LeMars in 1904. Beginning in 1931, many miles of PCC pavement were built to "get out of the mud". Many of these early pavements provided good performance without deterioration for more than 50 years. In the late 1950s, Iowa was faced with severe PCC pavement deterioration called D cracking. Research identified the cause of this deterioration as crushed limestone containing a bad pore system. Selective quarrying and ledge control has alleviated this problem. In 1990, cracking deterioration was identified on a three-year-old pavement on US 20 in central Iowa. The coarse aggregate was a crushed limestone with an excellent history of performance in PCC pavement. Examination of cores showed very few cracks through the coarse aggregate particles. The cracks were predominately confined to the matrix. The deterioration was identified as alkali-silica reactivity (ASR) by a consultant. To investigate the cause of the deterioration, the Iowa DOT and Iowa State University jointly purchased a high resolution, low vacuum Hitachi Scanning Electron Microscope (SEM) with an energy dispersion detector. Subsequent evaluation identified no concentration of silica gel (silicon-Si), but did identify substantial amounts of sulfur-S and aluminum-AL (assumed to be ettringite) in the air voids. Some of these voids have cracks radiating from them leading us to conclude that the ettringite filled voids were a center of pressure causing the crack. The ettringite in the voids, after being subjected to sodium chloride (NaCl), initially swells and then dissolves. This low vacuum SEM research of PCC pavement deterioration supports the following conclusions: (1) A low vacuum SEM and an energy dispersion detector are very important for proper evaluation of PCC pavement deterioration; (2) There are instances today where PCC pavement deterioration is mistakenly identified as ASR; (3) Ettringite initially expands when subjected to NaCl; and the ettringite filled voids are a center-of-pressure that cracks the PCC; and (4) The deterioration of some current premature PCC pavement distress locations is caused by factors related to the formation of excessive ettringite.
Resumo:
The Iowa DOT has been correlating its roadmeters to the CHLOE Profilometer since 1968. The same test method for the Present Serviceability Index (PSI) deduction from the pavement condition (crack and patch) survey has also been used since 1968. Resulting PSI measurements on the Interstate and Primary Highway Systems have had good continuity through the years due to these test procedures. A computer program called PSITREND has been developed to plot PSI versus year tested for every rural pavement section in the State of Iowa. PSITREND provides pavement performance trends which are very useful for prediction of rehabilitation needs and for evaluation of new designs or rehabilitation techniques. The PSITREND data base should be maintained through future years to expand on nineteen years of historical PSI test information already collected.
Resumo:
Crack formation has been a problem on some recently constructed bridges in Iowa. Drying shrinkage has been considered a contributing factor in that cracking. The study was undertaken to evaluate some of those material properties that contribute to the magnitude of drying shrinkage. Cement content, cement composition, fly ash and retarding admixture were the factors studied. Concrete prisms were cast for seven mixes and, after curing, were exposed to 100 deg F heat at ambient humidity for 280 days. The following were observed from the testing: (1) Higher C3A content cement concrete produced larger shrinkage; (2) Use of fly ash increased shrinkage; (3) Use of retarder increased shrinkage; and (4) Lowering the cement content reduced the shrinkage.
Resumo:
This report is formatted to independently present four individual investigations related to similar web gap fatigue problems. Multiple steel girder bridges commonly exhibit fatigue cracking due to out-of-plane displacement of the web near the diaphragm connections. This fatigue-prone web gap area is typically located in negative moment regions of the girders where the diaphragm stiffener is not attached to the top flange. In the past, the Iowa Department of Transportation has attempted to stop fatigue crack propagation in these steel girder bridges by drilling holes at the crack tips. Other nondestructive retrofits have been tried; in a particular case on a two-girder bridge with floor beams, angles were bolted between the stiffener and top flange. The bolted angle retrofit has failed in the past and may not be a viable solution for diaphragm bridges. The drilled hole retrofit is often only a temporary solution, so a more permanent and effective retrofit is required. A new field retrofit has been developed that involves loosening the bolts in the connection between the diaphragm and the girders. Research on the retrofit has been initiated; however, no long-term studies of the effects of bolt loosening have been performed. The intent of this research is to study the short-term effects of the bolt loosening retrofit on I-beam and channel diaphragm bridges. The research also addressed the development of a continuous remote monitoring system to investigate the bolt loosening retrofit on an X-type diaphragm bridge over a number of months, ensuring that the measured strain and displacement reductions are not affected by time and continuous traffic loading on the bridge. The testing for the first three investigations is based on instrumentation of web gaps in a negative moment region on Iowa Department of Transportation bridges with I-beam, channel, and X-type diaphragms. One bridge of each type was instrumented with strain gages and deflection transducers. Field tests, using loaded trucks of known weight and configuration, were conducted on the bridges with the bolts in the tight condition and after implementing the bolt loosening retrofit to measure the effects of loosening the diaphragm bolts. Long-term data were also collected on the X-diaphragm bridge by a data acquisition system that collected the data continuously under ambient truck loading. The collected data were retrievable by an off-site modem connection to the remote data acquisition system. The data collection features and ruggedness of this system for remote bridge monitoring make it viable as a pilot system for future monitoring projects in Iowa. Results indicate that loosening the diaphragm bolts reduces strain and out-of-plane displacement in the web gap, and that the reduction is not affected over time by traffic or environmental loading on the bridge. Reducing the strain in the web gap allows the bridge to support more cycles of loading before experiencing fatigue, thus increase the service life of the bridge. Two-girder floor beam bridges may also exhibit fatigue cracking in girder webs.
Resumo:
Individuals with depression process information in an overly negative or biased way (e.g., Henriques & Leitenberg, 2002) and demonstrate significant interpersonal dysfunction (e.g., Zlotnick, Kohn, Keitner, & Della Grotta, 2000). This study examined the relationship between cognitive errors (CEs) and interpersonal interactions in early psychotherapy sessions of 25 female patients with major depression. Transcripts were rated for CEs using the Cognitive Error Rating Scale (Drapeau, Perry, & Dunkley, 2008). Interpersonal patterns were assessed using the Structural Analysis of Social Behavior (Benjamin, 1974). Significant associations were found between CEs and markers of interpersonal functioning in selected contexts. The implications of these findings in bridging the gap between research and practice, enhancing treatment outcome, and improving therapist training are discussed. (PsycINFO Database Record (c) 2012 APA, all rights reserved).
Resumo:
This report is divided into two volumes. This volume (Volume I) summarizes a structural health monitoring (SHM) system that was developed for the Iowa DOT to remotely and continuously monitor fatigue critical bridges (FCB) to aid in the detection of crack formation. The developed FCB SHM system enables bridge owners to remotely monitor FCB for gradual or sudden damage formation. The SHM system utilizes fiber bragg grating (FBG) fiber optic sensors (FOSs) to measure strains at critical locations. The strain-based SHM system is trained with measured performance data to identify typical bridge response when subjected to ambient traffic loads, and that knowledge is used to evaluate newly collected data. At specified intervals, the SHM system autonomously generates evaluation reports that summarize the current behavior of the bridge. The evaluation reports are collected and distributed to the bridge owner for interpretation and decision making. Volume II summarizes the development and demonstration of an autonomous, continuous SHM system that can be used to monitor typical girder bridges. The developed SHM system can be grouped into two main categories: an office component and a field component. The office component is a structural analysis software program that can be used to generate thresholds which are used for identifying isolated events. The field component includes hardware and field monitoring software which performs data processing and evaluation. The hardware system consists of sensors, data acquisition equipment, and a communication system backbone. The field monitoring software has been developed such that, once started, it will operate autonomously with minimal user interaction. In general, the SHM system features two key uses. First, the system can be integrated into an active bridge management system that tracks usage and structural changes. Second, the system helps owners to identify damage and deterioration.
Resumo:
This report is one of two products for this project with the other being a design guide. This report describes test results and comparative analysis from 16 different portland cement concrete (PCC) pavement sites on local city and county roads in Iowa. At each site the surface conditions of the pavement (i.e., crack survey) and foundation layer strength, stiffness, and hydraulic conductivity properties were documented. The field test results were used to calculate in situ parameters used in pavement design per SUDAS and AASHTO (1993) design methodologies. Overall, the results of this study demonstrate how in situ and lab testing can be used to assess the support conditions and design values for pavement foundation layers and how the measurements compare to the assumed design values. The measurements show that in Iowa, a wide range of pavement conditions and foundation layer support values exist. The calculated design input values for the test sites (modulus of subgrade reaction, coefficient of drainage, and loss of support) were found to be different than typically assumed. This finding was true for the full range of materials tested. The findings of this study support the recommendation to incorporate field testing as part of the process to field verify pavement design values and to consider the foundation as a design element in the pavement system. Recommendations are provided in the form of a simple matrix for alternative foundation treatment options if the existing foundation materials do not meet the design intent. The PCI prediction model developed from multi-variate analysis in this study demonstrated a link between pavement foundation conditions and PCI. The model analysis shows that by measuring properties of the pavement foundation, the engineer will be able to predict long term performance with higher reliability than by considering age alone. This prediction can be used as motivation to then control the engineering properties of the pavement foundation for new or re-constructed PCC pavements to achieve some desired level of performance (i.e., PCI) with time.
Resumo:
This document is the second of two deliverables for the project Optimizing Pavement Base, Subbase, and Subgrade Layers for Cost and Performance on Local Roads (TR-640). The first deliverable is the 454-page Final Field Data Report. The field data report describes test results and comparative analysis from 16 different portland cement concrete (PCC) pavement sites on local city and county roads in Iowa. At each site the surface conditions of the pavement (i.e., crack survey) and foundation layer strength, stiffness, and hydraulic conductivity properties were documented. The field test results were used to calculate in situ parameters used in pavement design methodologies for AASHTO (1993) and Iowa’s Statewide Urban Design and Specifications (SUDAS). Overall, the results of the study demonstrate how in situ and lab testing can be used to assess the support conditions and design values for pavement foundation layers and how the measurements compare to the assumed design values. This guide summarizes the study results and outlines general guidelines for applying them to optimize pavement bases, subbases, and subgrade layers of local roads with PCC pavements and thus their performance.
Resumo:
The purpose of this Interstate Corridor Plan (plan) is to provide the Iowa Department of Transportation (Iowa DOT) with an initial screening and prioritization of interstate corridors/segments. This process evaluates the entire interstate system, independent of current financial constraints, using a select group of criteria weighted in terms of their relative significance. The resulting segments would then represent those areas that should be considered for further study (e.g., environmental, design, engineering), with the possibility of being considered for programming by the Iowa Transportation Commission. There was a dominant theme present in conversations with those department stakeholders who have a keen interest in the product of this planning effort. A statement that was often heard was that staff needed more information to help answer the question, “Where do we need to be looking to next, and when?” There was a strong desire to be able to use this plan to help populate that initial pool of candidate segments that would progress towards further study, as discussed below. It was this theme that framed the need for this plan and ultimately guided its development. Further study: As acknowledged at the beginning of this section, the product of this planning effort will be an initial screening and prioritization of interstate corridors/segments. While this initial screening will assist the Iowa DOT in identifying those areas that should be considered for further study, the plan will not identify specific projects or alternatives that could be directly considered as part of the programming process. Bridging the gap between this plan and the programming process are a variety of environmental, design, and engineering activities conducted by various Iowa DOT offices. It is these activities that will further refine the priority corridors/segments identified in this plan into candidate projects. In addition, should the evaluation process developed through this planning effort prove to be successful, it is possible that there will be additional applications, such as future primary system highway plans and statewide freight plans.
Resumo:
Reflective cracking in hot mix asphalt (HMA) overlays has been a common cause of poor pavement performance in Iowa for many years. Reflective cracks commonly occur in HMA overlays when deteriorated portland cement concrete is paved over with HMA. This results in HMA pavement surfaces with poor ride quality and increased transportation maintenance costs. To delay the formation of cracks in HMA overlays, the Iowa Department of Transportation (Iowa DOT) has begun to implement a crack-relief interlayer mix design specification. The crack-relief interlayer is an asphalt-rich, highly flexible HMA that can resist cracking in high strain loading conditions. In this project, the field performance of an HMA overlay using a one inch interlayer was compared to a conventional HMA overlay without an interlayer. Both test sections were constructed on US 169 in Adel, Iowa as part of an Iowa DOT overlay project. The laboratory performance of the interlayer mix design was assessed for resistance to cracking from repeated strains by using the four-point bending beam apparatus. An HMA using a highly polymer modified binder was designed and shown to meet the laboratory performance test criteria. The field performance of the overlay with the interlayer exceeded the performance of the conventional overlay that did not have the interlayer. After one winter season, 29 percent less reflective cracking was measured in the pavement section with the interlayer than the pavement section without the interlayer. The level of cracking severity was also reduced by using the interlayer in the overlay.
Resumo:
During the summer of 1963 the Materials Department noted the three to four ·year old concrete pavement on I-80 in Cass County was showing extensive surface cracking adjacent to joints and cracks. An examination of the pavement and a few cores from the cracked areas was made by the I.S.H.C. Materials Department and later by David Stark of the P.C.A. Additional surveys were conducted on other concrete pavement made with coarse aggregate from similar rock from two different sources. Blue-line cracking was found on some primary pavement and the indications of incipient cracks were seen on I-29 in Pottawattamie County, north of Council Bluffs. A good "D"-crack pattern is now evident. Surveys were then made of the entire Interstate concrete pavement. No other sections of Interstate were "D"-cracking, although some sections showed joint discoloration. None of these pavements, including the discolored sections, contained "D"-crack associated aggregates. At the same time as the Interstate survey additional pavements and sources were checked. Some "D"-cracking was noticed on certain sections of primary pavement 5-10 years old, in the vicinity of Waterloo and Cedar Rapids. The "D"-cracked pavement was from three aggregate sources, the Newton, Otis, and Burton Ave. quarries. Other pavements in this area that were older or from· different· coarse aggregate sources were not "D"-cracked. We believe that all the "D"-cracking is related, although dedolomitization is probably involved in the intermediate dolomite rocks.