938 resultados para Construction Theory


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Few studies have investigated iatrogenic outcomes from the viewpoint of patient experience. To address this anomaly, the broad aim of this research is to explore the lived experience of patient harm. Patient harm is defined as major harm to the patient, either psychosocial or physical in nature, resulting from any aspect of health care. Utilising the method of Consensual Qualitative Research (CQR), in-depth interviews are conducted with twenty-four volunteer research participants who self-report having been severely harmed by an invasive medical procedure. A standardised measure of emotional distress, the Impact of Event Scale (IES), is additionally employed for purposes of triangulation. Thematic analysis of transcript data indicate numerous findings including: (i) difficulties regarding patients‘ prior understanding of risks involved with their medical procedure; (ii) the problematic response of the health system post-procedure; (iii) multiple adverse effects upon life functioning; (iv) limited recourse options for patients; and (v) the approach desired in terms of how patient harm should be systemically handled. In addition, IES results indicate a clinically significant level of distress in the sample as a whole. To discuss findings, a cross-disciplinary approach is adopted that draws upon sociology, medicine, medical anthropology, psychology, philosophy, history, ethics, law, and political theory. Furthermore, an overall explanatory framework is proposed in terms of the master themes of power and trauma. In terms of the theme of power, a postmodernist analysis explores the politics of patient harm, particularly the dynamics surrounding the politics of knowledge (e.g., notions of subjective versus objective knowledge, informed consent, and open disclosure). This analysis suggests that patient care is not the prime function of the health system, which appears more focussed upon serving the interests of those in the upper levels of its hierarchy. In terms of the master theme of trauma, current understandings of posttraumatic stress disorder (PTSD) are critiqued, and based on data from this research as well as the international literature, a new model of trauma is proposed. This model is based upon the principle of homeostasis observed in biology, whereby within every cell or organism a state of equilibrium is sought and maintained. The proposed model identifies several bio-psychosocial markers of trauma across its three main phases. These trauma markers include: (i) a profound sense of loss; (ii) a lack of perceived control; (iii) passive trauma processing responses; (iv) an identity crisis; (v) a quest to fully understand the trauma event; (vi) a need for social validation of the traumatic experience; and (vii) posttraumatic adaption with the possibility of positive change. To further explore the master themes of power and trauma, a natural group interview is carried out at a meeting of a patient support group for arachnoiditis. Observations at this meeting and members‘ stories in general support the homeostatic model of trauma, particularly the quest to find answers in the face of distressing experience, as well as the need for social recognition of that experience. In addition, the sociopolitical response to arachnoiditis highlights how public domains of knowledge are largely constructed and controlled by vested interests. Implications of the data overall are discussed in terms of a cultural revolution being needed in health care to position core values around a prime focus upon patients as human beings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector major infrastructure market, especially in very large economic infrastructure procured using Pubic Private Partnerships, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) into the Australian construction market. This paper aims to report on progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major infrastructure projects and which is designed to give an improved understanding of matters surrounding FDI into the Australian construction sector. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors and as head contractors bidding for Australian major infrastructure public sector projects. Elsewhere, the authors have developed Dunning’s principal hypothesis associated with his eclectic framework in order to suit the context of this research and to address a weakness arising in Dunning’s principal hypothesis that is based on a nominal approach to the factors in the eclectic framework and which fail to speak to the relative explanatory power of these factors. In this paper, an approach to reviewing and analysing secondary data, as part of the first stage investigation in this research, is developed and some illustrations given, vis-à-vis the selected sector (roads, bridges and tunnels) in Australia (as the host location) and using one of the selected home countries (Spain). In conclusion, some tentative thoughts are offered in anticipation of the completion of the first stage investigation - in terms of the extent to which this first stage based on secondary data only might suggest the relative importance of the factors in the eclectic framework. It is noted that more robust conclusions are expected following the future planned stages of the research and these stages including primary data are briefly outlined. Finally, and beyond theoretical contributions expected from the overall approach taken to developing and testing Dunning’s framework, other expected contributions concerning research method and practical implications are mentioned.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A general mistrust within the contactor and subcontractor companies has identified one of the significant barriers to derive benefits from true downstream supply chain integration. Using the general theory of trust in inter-organizational relations and conducting interviews, this research discusses factors that influence development of trust and cooperation in contractor– subcontractor relationships in construction projects. System dynamics is the simulation method is selected in this theory-building effort, based on qualitative data collected from two projects of a construction company in Thailand. Performance, permeability and system based trust are found to make significant contributions toward parties’ trust level. Three strategic policies such as best value contracting, management of subcontractors as internal team and semi project partnering approach are recommended to stimulate the trust factors as well as cooperative long term relationship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Social outcomes, in particular intangible social outcomes, are generally difficult to achieve in the construction industry due to the predominantly episodic, fragmented and heavily regulated nature of construction that presupposes a tendency towards mainstream construction processes and design. The Western Australian ‘Percent for Art’ policy is recognized for stimulating social outcomes, by creating richer and more aesthetically pleasing social environments through the incorporation of artwork into public buildings. A case study of four Percent for Art projects highlights the role of the Artwork Selection Committee in incorporating artwork into construction. A total of 20 semi-structured interviews were conducted with committee members and policy officers. Data analysis involved a combination of pattern coding and matrix categorization, and resulted in the identification of the committee’s three key elements of collaborative communication, democratic decision-making and project champions. The findings suggest these key elements foster the interaction, communication and relationships needed to facilitate feedback, enhance relationships, create cross-functional teams and lower project resistance, which are all necessary to overcome constraints to social outcomes in construction. The findings provide greater insight into the mechanisms for achieving social outcomes and a basis for future discussion about the processes for achieving social outcomes in the construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper a new graph-theory and improved genetic algorithm based practical method is employed to solve the optimal sectionalizer switch placement problem. The proposed method determines the best locations of sectionalizer switching devices in distribution networks considering the effects of presence of distributed generation (DG) in fitness functions and other optimization constraints, providing the maximum number of costumers to be supplied by distributed generation sources in islanded distribution systems after possible faults. The proposed method is simulated and tested on several distribution test systems in both cases of with DG and non DG situations. The results of the simulations validate the proposed method for switch placement of the distribution network in the presence of distributed generation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the vulnerability of masonry under shear; first the mechanisms of in-plane and out-of-plane shear performance of masonry are reviewed; both the unreinforced and lightly reinforced masonry wall systems are considered. Factors affecting the response of unreinforced and reinforced masonry to shear are described and the effect of the variability of those factors to the failure mode of masonry shear walls is also discussed. Some critique is provided on the existing design provisions in various masonry standards.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Business Process Management (BPM) is a topic that continues to grow in significance as organisations seek to gain and sustain competitive advantage in an increasingly global environment. Despite anecdotal evidence of organisations improving performance by pursuing a BPM approach, there is little theory that explains and substantiates this relationship. This study provides the first theory on the progression and maturity of BPM Initiatives within organisations and provides a vital starting block upon which future research in this area can build. The Researcher starts by clearly defining three key terms (BPM Initiative, BPM Progression and BPM Maturity), showing the relationship between these three concepts and proposing their relationship with Organisational Performance. The Researcher then combines extant literature and use of the Delphi Technique and the case study method to explore the progression and measurement of the BPM Initiatives within organisations. The study builds upon the principles of general theories including the Punctuated Equilibrium Model and Dynamic Capabilities to present theory on BPM Progression and BPM Maturity. Using the BPM Capability Framework developed through an international Delphi study series, the Researcher shows how the specific organisational context influences which capability areas an organisation chooses to progress. By comparing five separate organisations over an extended time the Researcher is able to show that, despite this disparity, there is some evidence of consistency with regard to the capability areas progressed. This suggests that subsequent identification of progression paths may be possible. The study also shows that the approach and scope taken to BPM within each organisation is a likely predictor of such paths. These outcomes result in the proposal of a formative model for measuring BPM Maturity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article examines shifts in educational and social governance taking place in Queensland, Australia, through Industry School Engagement Strategy of Education Queensland and its Gateway Schools program. This significant educational initiative is set within the context of the social investment agenda first articulated in the education policy framework, Queensland State Education-2010. The article traces the historic extension of this governmental strategy through establishment of the Gateway Schools concept that brokers industry-school partnerships with global players in the Queensland economy. Industry sectors forming the partnerships include Minerals and Energy, Aerospace, Wine Tourism, Agribusiness, Manufacturing and Engineering, Building and Construction and ICT. We argue that this ‘post-bureaucratic’ model of schooling represents a new social settlement of neoliberal governance, in which educational outcomes align with economic objectives, and frame the conditions for community self-governance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A crucial contemporary policy question for governments across the globe is how to cope with international crime and terrorist networks. Many such “dark” networks—that is, networks that operate covertly and illegally—display a remarkable level of resilience when faced with shocks and attacks. Based on an in-depth study of three cases (MK, the armed wing of the African National Congress in South Africa during apartheid; FARC, the Marxist guerrilla movement in Colombia; and the Liberation Tigers of Tamil Eelam, LTTE, in Sri Lanka), we present a set of propositions to outline how shocks impact dark network characteristics (resources and legitimacy) and networked capabilities (replacing actors, linkages, balancing integration and differentiation) and how these in turn affect a dark network's resilience over time. We discuss the implications of our findings for policymakers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a lack of writing on the issue of the education rights of people with disabilities by authors of any theoretical persuasion. While the deficiency of theory may be explained by a variety of historical, philosophical and practical considerations, it is a deficiency which must be addressed. Otherwise, any statement of rights rings out as hollow rhetoric unsupported by sound reason and moral rectitude. This paper attempts to address this deficiency in education rights theory by postulating a communitarian theory of the education rights of people with disabilities. The theory is developed from communitarian writings on the role of education in democratic society. The communitarian school, like the community within which it nests, is inclusive. Schools both reflect and model the shape of communitarian society and have primary responsibility for teaching the knowledge and virtues which will allow citizens to belong to and function within society. Communitarians emphasise responsibilities, however, as the corollary of rights and require the individual good to yield to community good when the hard cases arise. The article not only explains the basis of the right to an inclusive education, therefore, but also engages with the difficult issue of when such a right may not be enforceable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.