910 resultados para symmetrical uncertainty


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study assessed the inaccuracy of the traffic estimates for toll motorway concessions in Spain. It was found that the estimates conducted by both the government and the concessionaire showed a significant bias towards overestimating traffic. The level of overestimation in Spain is even greater than that reported by other studies based on worldwide data. The notorious levels of overestimation entail severe burdens to the economics of the concessionaires that often prompt renegotiations of the contracts, which are often accepted by the government. These renegotiations usually end up with toll changes or extension of the concession terms, which have to be ultimately borne by future motorway users. It is postulated herein that the bias towards overestimating traffic in toll motorways in Spain is mostly caused by strategic issues rather than by modelling errors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work is aimed to present the main differences of nuclear data uncertainties among three different nuclear data libraries: EAF-2007, EAF-2010 and SCALE-6.0, under different neutron spectra: LWR, ADS and DEMO (fusion). To take into account the neutron spectrum, the uncertainty data are collapsed to onegroup. That is a simple way to see the differences among libraries for one application. Also, the neutron spectrum effect on different applications can be observed. These comparisons are presented only for (n,fission), (n,gamma) and (n,p) reactions, for the main transuranic isotopes (234,235,236,238U, 237Np, 238,239,240,241Pu, 241,242m,243Am, 242,243,244,245,246,247,248Cm, 249Bk, 249,250,251,252Cf). But also general comparisons among libraries are presented taking into account all included isotopes. In other works, target accuracies are presented for nuclear data uncertainties; here, these targets are compared with uncertainties on the above libraries. The main results of these comparisons are that EAF-2010 has reduced their uncertainties for many isotopes from EAF-2007 for (n,gamma) and (n,fission) but not for (n,p); SCALE-6.0 gives lower uncertainties for (n,fission) reactions for ADS and PWR applications, but gives higher uncertainties for (n,p) reactions in all applications. For the (n,gamma) reaction, the amount of isotopes which have higher uncertainties is quite similar to the amount of isotopes which have lower uncertainties when SCALE-6.0 and EAF-2010 are compared. When the effect of neutron spectra is analysed, the ADS neutron spectrum obtained the highest uncertainties for (n,gamma) and (n,fission) reactions of all libraries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An analytical method for evaluating the uncertainty of the performance of active antenna arrays in the whole spatial spectrum is presented. Since array processing algorithms based on spatial reference are widely used to track moving targets, it is essential to be aware of the impact of the uncertainty sources on the antenna response. Furthermore, the estimation of the direction of arrival (DOA) depends on the array uncertainty. The aim of the uncertainties analysis is to provide an exhaustive characterization of the behavior of the active antenna array associated with its main uncertainty sources. The result of this analysis helps to select the proper calibration technique to be implemented. An illustrative example for a triangular antenna array used for satellite tracking is presented showing the suitability of the proposed method to carry out an efficient characterization of an active antenna array.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The new Spanish Regulation in Building Acoustic establishes values and limits for the different acoustic magnitudes whose fulfillment can be verify by means field measurements. In this sense, an essential aspect of a field measurement is to give the measured magnitude and the uncertainty associated to such a magnitude. In the calculus of the uncertainty it is very usual to follow the uncertainty propagation method as described in the Guide to the expression of Uncertainty in Measurements (GUM). Other option is the numerical calculus based on the distribution propagation method by means of Monte Carlo simulation. In fact, at this stage, it is possible to find several publications developing this last method by using different software programs. In the present work, we used Excel for the Monte Carlo simulation for the calculus of the uncertainty associated to the different magnitudes derived from the field measurements following ISO 140-4, 140-5 and 140-7. We compare the results with the ones obtained by the uncertainty propagation method. Although both methods give similar values, some small differences have been observed. Some arguments to explain such differences are the asymmetry of the probability distributions associated to the entry magnitudes,the overestimation of the uncertainty following the GUM

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the most significant aspects of a building?s acoustic behavior is the airborne sound insulation of the room façades, since this determines the protection of its inhabitants against environmental noise. For this reason, authorities in most countries have established in their acoustic regulations for buildings the minimum value of sound insulation that must be respected for façades. In order to verify compliance with legal requirements it is usual to perform acoustic measurements in the finished buildings and then compare the measurement results with the established limits. Since there is always a certain measurement uncertainty, this uncertainty must be calculated and taken into account in order to ensure compliance with specifications. The most commonly used method for measuring sound insulation on façades is the so-called Global Loudspeaker Method, specified in ISO 140-5:1998. This method uses a loudspeaker placed outside the building as a sound source. The loudspeaker directivity has a significant influence on the measurement results, and these results may change noticeably by choosing different loudspeakers, even though they all fulfill the directivity requirements of ISO 140-5. This work analyzes the influence of the loudspeaker directivity on the results of façade sound insulation measurement, and determines its contribution to measurement uncertainty. The theoretical analysis is experimentally validated by means of an intermediate precision test according to ISO 5725-3:1994, which compares the values of sound insulation obtained for a façade using various loudspeakers with different directivities. Keywords: Uncertainty, Façade, Insulation

Relevância:

20.00% 20.00%

Publicador:

Resumo:

cartografía de incertidumbres

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In activation calculations, there are several approaches to quantify uncertainties: deterministic by means of sensitivity analysis, and stochastic by means of Monte Carlo. Here, two different Monte Carlo approaches for nuclear data uncertainty are presented: the first one is the Total Monte Carlo (TMC). The second one is by means of a Monte Carlo sampling of the covariance information included in the nuclear data libraries to propagate these uncertainties throughout the activation calculations. This last approach is what we named Covariance Uncertainty Propagation, CUP. This work presents both approaches and their differences. Also, they are compared by means of an activation calculation, where the cross-section uncertainties of 239Pu and 241Pu are propagated in an ADS activation calculation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the last few years, technical debt has been used as a useful means for making the intrinsic cost of the internal software quality weaknesses visible. This visibility is made possible by quantifying this cost. Specifically, technical debt is expressed in terms of two main concepts: principal and interest. The principal is the cost of eliminating or reducing the impact of a, so called, technical debt item in a software system; whereas the interest is the recurring cost, over a time period, of not eliminating a technical debt item. Previous works about technical debt are mainly focused on estimating principal and interest, and on performing a cost-benefit analysis. This cost-benefit analysis allows one to determine if to remove technical debt is profitable and to prioritize which items incurring in technical debt should be fixed first. Nevertheless, for these previous works technical debt is flat along the time. However the introduction of new factors to estimate technical debt may produce non flat models that allow us to produce more accurate predictions. These factors should be used to estimate principal and interest, and to perform cost-benefit analysis related to technical debt. In this paper, we take a step forward introducing the uncertainty about the interest, and the time frame factors so that it becomes possible to depict a number of possible future scenarios. Estimations obtained without considering the possible evolution of the interest over time may be less accurate as they consider simplistic scenarios without changes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

UPM Activities on Sensitivity and Uncertainty Analysis of Assembly Depletion

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The assessment of the uncertainty levels on the design and safety parameters for the innovative European Sodium Fast Reactor (ESFR) is mandatory. Some of these relevant safety quantities are the Doppler and void reactivity coefficients, whose uncertainties are quantified. Besides, the nuclear reaction data where an improvement will certainly benefit the design accuracy are identified. This work has been performed with the SCALE 6.1 codes suite and its multigroups cross sections library based on ENDF/B-VII.0 evaluation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we present a global overview of the recent study carried out in Spain for the new hazard map, which final goal is the revision of the Building Code in our country (NCSE-02). The study was carried our for a working group joining experts from The Instituto Geografico Nacional (IGN) and the Technical University of Madrid (UPM) , being the different phases of the work supervised by an expert Committee integrated by national experts from public institutions involved in subject of seismic hazard. The PSHA method (Probabilistic Seismic Hazard Assessment) has been followed, quantifying the epistemic uncertainties through a logic tree and the aleatory ones linked to variability of parameters by means of probability density functions and Monte Carlo simulations. In a first phase, the inputs have been prepared, which essentially are: 1) a project catalogue update and homogenization at Mw 2) proposal of zoning models and source characterization 3) calibration of Ground Motion Prediction Equations (GMPE’s) with actual data and development of a local model with data collected in Spain for Mw < 5.5. In a second phase, a sensitivity analysis of the different input options on hazard results has been carried out in order to have criteria for defining the branches of the logic tree and their weights. Finally, the hazard estimation was done with the logic tree shown in figure 1, including nodes for quantifying uncertainties corresponding to: 1) method for estimation of hazard (zoning and zoneless); 2) zoning models, 3) GMPE combinations used and 4) regression method for estimation of source parameters. In addition, the aleatory uncertainties corresponding to the magnitude of the events, recurrence parameters and maximum magnitude for each zone have been also considered including probability density functions and Monte Carlo simulations The main conclusions of the study are presented here, together with the obtained results in terms of PGA and other spectral accelerations SA (T) for return periods of 475, 975 and 2475 years. The map of the coefficient of variation (COV) are also represented to give an idea of the zones where the dispersion among results are the highest and the zones where the results are robust.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Following the Integrated Water Resources Management approach, the European Water Framework Directive demands Member States to develop water management plans at the catchment level. Those plans have to integrate the different interests and must be developed with stakeholder participation. To face these requirements, managers need tools to assess the impacts of possible management alternatives on natural and socio-economic systems. These tools should ideally be able to address the complexity and uncertainties of the water system, while serving as a platform for stakeholder participation. The objective of our research was to develop a participatory integrated assessment model, based on the combination of a crop model, an economic model and a participatory Bayesian network, with an application in the middle Guadiana sub-basin, in Spain. The methodology is intended to capture the complexity of water management problems, incorporating the relevant sectors, as well as the relevant scales involved in water management decision making. The integrated model has allowed us testing different management, market and climate change scenarios and assessing the impacts of such scenarios on the natural system (crops), on the socio-economic system (farms) and on the environment (water resources). Finally, this integrated assessment modelling process has allowed stakeholder participation, complying with the main requirements of current European water laws.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A participatory modelling process has been conducted in two areas of the Guadiana river (the upper and the middle sub-basins), in Spain, with the aim of providing support for decision making in the water management field. The area has a semi-arid climate where irrigated agriculture plays a key role in the economic development of the region and accounts for around 90% of water use. Following the guidelines of the European Water Framework Directive, we promote stakeholder involvement in water management with the aim to achieve an improved understanding of the water system and to encourage the exchange of knowledge and views between stakeholders in order to help building a shared vision of the system. At the same time, the resulting models, which integrate the different sectors and views, provide some insight of the impacts that different management options and possible future scenarios could have. The methodology is based on a Bayesian network combined with an economic model and, in the middle Guadiana sub-basin, with a crop model. The resulting integrated modelling framework is used to simulate possible water policy, market and climate scenarios to find out the impacts of those scenarios on farm income and on the environment. At the end of the modelling process, an evaluation questionnaire was filled by participants in both sub-basins. Results show that this type of processes are found very helpful by stakeholders to improve the system understanding, to understand each others views and to reduce conflict when it exists. In addition, they found the model an extremely useful tool to support management. The graphical interface, the quantitative output and the explicit representation of uncertainty helped stakeholders to better understand the implications of the scenario tested. Finally, the combination of different types of models was also found very useful, as it allowed exploring in detail specific aspects of the water management problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Biomecanica del rendimiento en esgrima

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prediction at ungauged sites is essential for water resources planning and management. Ungauged sites have no observations about the magnitude of floods, but some site and basin characteristics are known. Regression models relate physiographic and climatic basin characteristics to flood quantiles, which can be estimated from observed data at gauged sites. However, these models assume linear relationships between variables Prediction intervals are estimated by the variance of the residuals in the estimated model. Furthermore, the effect of the uncertainties in the explanatory variables on the dependent variable cannot be assessed. This paper presents a methodology to propagate the uncertainties that arise in the process of predicting flood quantiles at ungauged basins by a regression model. In addition, Bayesian networks were explored as a feasible tool for predicting flood quantiles at ungauged sites. Bayesian networks benefit from taking into account uncertainties thanks to their probabilistic nature. They are able to capture non-linear relationships between variables and they give a probability distribution of discharges as result. The methodology was applied to a case study in the Tagus basin in Spain.