806 resultados para study project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The EU Project AquaTerra generates knowledge about the river-soil-sediment-groundwater system and delivers scientific information of value for river basin management. In this article, the use and ignorance of scientific knowledge in decision making is explored by a theoretical review. We elaborate on the 'two-communities theory', which explains the problems of the policy-science interface by relating and comparing the different cultures, contexts, and languages of researchers and policy makers. Within AquaTerra, the EUPOL subproject examines the policy-science interface with the aim of achieving a good connection between the scientific output of the project and EU policies. We have found two major barriers, namely language and resources, as well as two types of relevant relationships: those between different research communities and those between researchers and policy makers. (c) 2007 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Risk management (RM) comprises of risk identification, risk analysis, response planning, monitoring and action planning tasks that are carried out throughout the life cycle of a project in order to ensure that project objectives are met. Although the methodological aspects of RM are well-defined, the philosophical background is rather vague. In this paper, a learning-based approach is proposed. In order to implement this approach in practice, a tool has been developed to facilitate construction of a lessons learned database that contains risk-related information and risk assessment throughout the life cycle of a project. The tool is tested on a real construction project. The case study findings demonstrate that it can be used for storing as well as updating risk-related information and finally, carrying out a post-project appraisal. The major weaknesses of the tool are identified as, subjectivity of the risk rating process and unwillingness of people to enter information about reasons of failure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The term commercial management has been used for some time, similarly the job title commercial manager. However, as of yet, little emphasis has been placed on defining. This paper presents the findings from a two-year research initiative that has compared and contrasted the role of commercial managers from a range of organisations and across industry sectors, as a first step in developing a body of knowledge for commercial. It is argued that there are compelling arguments for considering commercial management, not solely as atask undertaken by commercial managers, but as a discipline in itself: a discipline that, arguably, bridges traditional project management and organisational theories. While the study has established differences in approach and application both between and within industry sectors, it has established sufficient similarity and synergy in practice to identify a specific role of commercial management in project-based organisations. These similarities encompass contract management and dispute resolution; the divergences include a greater involvement in financial and value management in construction and in bid management in defence/aerospace.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The paper draws on a research project on innovative provision in an FE college for excluded and disaffected young people. The college offers places on vocational courses to students who are still of compulsory school age who have been excluded by or have persistently failed to attend or achieve in school. One set of themes to emerge relates to the experiences of the students: the role of personal relationships and, especially, relationships with teachers, in the breakdown of school placements; the importance both of good relationships with tutors, often expressed as 'being treated like an adult', and of a vocational and practical curriculum in successful re-engagement at college; and positive but highly instrumental and employment related attitudes to education. Another set of themes relates to the practical and organisational difficulties and the way that a lack of flexibility in 14-19 provision, especially while students are still of compulsory school age, creates difficulties for programmes of this kind. Finally the paper considers the tensions between pressures for accountability and outcome-driven measures and the aims of increasing participation and using education to address issues of social inclusion.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since 1995 the Directive 93/43/EEC prescribes the application of HACCP principles in food production. However, despite the major importance of food safety, there is a fundamental lack of information on the economic impact of this directive. This project aims to study costs and benefits of HACCP, including the impact of HACCP on public health. Due to the complexity of the issue, we propose to start with a pilot study, limited to dairy and meat products industry in NL, UK and I. Information will be obtained at two levels: production chain and public health. Integration of these results will result in recommendations at the levels of EU member states and industry for regulation and supporting measures, and in recommendations for an effective and efficient approach for a more comprehensive project on costs and benefits of HACCP, covering major parts of the food industry in EU member states.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objective: To evaluate the bifidogenic efficacy of two inulin doses in healthy human adults. Design: A double-blind, placebo-controlled, crossover human study. Setting: Food Microbial Sciences Unit, The University of Reading, Reading, UK. Subjects: Thirty healthy volunteers, 15 men, 15 women ( age range 19-35). Interventions: Subjects consumed a chocolate drink containing placebo ( maltodextrin, 8 g/day), 5 g/day inulin and 8 g/day inulin for a 2-week treatment period. Each treatment was followed by a 1-week washout at the end of which volunteers progressed to the next treatment. Faecal samples were obtained at the start of the study ( baseline) and at the end of each treatment and washout period. Fluorescent in situ hybridization was used to monitor populations of Bifidobacterium genus, Bacteroides - Prevotella, Lactobacillus - Enterococcus and Clostridium perfringens - histolyticum subgroup. Results: Bifidobacterial levels increased significantly upon ingestion of both the low ( 9.78 +/- 0.29 log(10) cells/g faeces, P < 0.05) and the high inulin dose ( 9.79 +/- 0.38 log(10) cells/g faeces, P < 0.05) compared to placebo ( 9.64 +/- 0.23 log(10) cells/g faeces). Conclusions: Both inulin doses exhibited a bifidogenic effect but a higher volunteer percentage responded to the high dose. A dose response effect was not observed but the magnitude of increase in bifidobacteria levels depended on their initial numbers. The higher the initial concentrations the smaller was the increase upon ingestion of the active treatments. Sponsorship: Financial support for the completion of this project was provided by Sensus ( Roosendaal, The Netherlands).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Parametric software effort estimation models consisting on a single mathematical relationship suffer from poor adjustment and predictive characteristics in cases in which the historical database considered contains data coming from projects of a heterogeneous nature. The segmentation of the input domain according to clusters obtained from the database of historical projects serves as a tool for more realistic models that use several local estimation relationships. Nonetheless, it may be hypothesized that using clustering algorithms without previous consideration of the influence of well-known project attributes misses the opportunity to obtain more realistic segments. In this paper, we describe the results of an empirical study using the ISBSG-8 database and the EM clustering algorithm that studies the influence of the consideration of two process-related attributes as drivers of the clustering process: the use of engineering methodologies and the use of CASE tools. The results provide evidence that such consideration conditions significantly the final model obtained, even though the resulting predictive quality is of a similar magnitude.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A large and complex IT project may involve multiple organizations and be constrained within a temporal period. An organization is a system comprising of people, activities, processes, information, resources and goals. Understanding and modelling such a project and its interrelationship with relevant organizations are essential for organizational project planning. This paper introduces the problem articulation method (PAM) as a semiotic method for organizational infrastructure modelling. PAM offers a suite of techniques, which enables the articulation of the business, technical and organizational requirements, delivering an infrastructural framework to support the organization. It works by eliciting and formalizing (e. g. processes, activities, relationships, responsibilities, communications, resources, agents, dependencies and constraints) and mapping these abstractions to represent the manifestation of the "actual" organization. Many analysts forgo organizational modelling methods and use localized ad hoc and point solutions, but this is not amenable for organizational infrastructures modelling. A case study of the infrared atmospheric sounding interferometer (IASI) will be used to demonstrate the applicability of PAM, and to examine its relevancy and significance in dealing with the innovation and changes in the organizations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article describes work undertaken by the VERA project to investigate how archaeologists work with information technology (IT) on excavation sites. We used a diary study to research the usual patterns of behaviour of archaeologists digging the Silchester Roman town site during the summer of 2007. Although recording had previously been undertaken using pen and paper, during the 2007 season a part of the dig was dedicated to trials of IT and archaeologists used digital pens and paper and Nokia N800 handheld PDAs to record their work. The goal of the trial was to see whether it was possible to record data from the dig whilst still on site, rather than waiting until after the excavation to enter it into the Integrated Archaeological Database (IADB) and to determine whether the archaeologists found the new technology helpful. The digital pens were a success, however, the N800s were not successful given the extreme conditions on site. Our findings confirmed that it was important that technology should fit in well with the work being undertaken rather than being used for its own sake, and should respect established work flows. We also found that the quality of data being entered was a recurrent concern as was the reliability of the infrastructure and equipment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: This study was carried out as part of a European Union funded project (PharmDIS-e+), to develop and evaluate software aimed at assisting physicians with drug dosing. A drug that causes particular problems with drug dosing in primary care is digoxin because of its narrow therapeutic range and low therapeutic index. Objectives: To determine (i) accuracy of the PharmDIS-e+ software for predicting serum digoxin levels in patients who are taking this drug regularly; (ii) whether there are statistically significant differences between predicted digoxin levels and those measured by a laboratory and (iii) whether there are differences between doses prescribed by general practitioners and those suggested by the program. Methods: We needed 45 patients to have 95% Power to reject the null hypothesis that the mean serum digoxin concentration was within 10% of the mean predicted digoxin concentration. Patients were recruited from two general practices and had been taking digoxin for at least 4 months. Exclusion criteria were dementia, low adherence to digoxin and use of other medications known to interact to a clinically important extent with digoxin. Results: Forty-five patients were recruited. There was a correlation of 0·65 between measured and predicted digoxin concentrations (P < 0·001). The mean difference was 0·12 μg/L (SD 0·26; 95% CI 0·04, 0·19, P = 0·005). Forty-seven per cent of the patients were prescribed the same dose as recommended by the software, 44% were prescribed a higher dose and 9% a lower dose than recommended. Conclusion: PharmDIS-e+ software was able to predict serum digoxin levels with acceptable accuracy in most patients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trees outside forests (TOF) in Nepal’s Terai have significantly increased over the past decade. The Chitwan District was one of the focus districts in the Terai Community Forestry Development Project that promoted a tree seedling distribution program. This paper examines the current position of tree integration on farmland and its contribution to livelihoods of rural households in this district. Interviews with local key informants, government and non-government agencies and woodbased industries, as well as an in-depth study of 32 households were used to describe the constraints faced by the households in management of trees on farmland. Most households cited disease, poor growth, lack of preferred tree species, lack of technical support, an uncertain tree market, and lack of financial support as constraints. Despite the important role of trees in subsistence and marketbased rural livelihood diversification, and the consequent reduction in pressure on national forests from on-farm trees, current government policies and practices fail to recognise the value of these trees. It is argued that there is substantial potential for improving on-farm trees to enhance rural livelihoods. A responsive service mechanism centred on tree growing households would help the management of tree resources on the farmland.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.