774 resultados para strategic intent
Resumo:
PURPOSE: This study (EORTC 30891) attempted to demonstrate equivalent overall survival in patients with localized prostate cancer not suitable for local curative treatment treated with immediate or deferred androgen ablation. PATIENTS AND METHODS: We randomly assigned 985 patients with newly diagnosed prostate cancer T0-4 N0-2 M0 to receive androgen deprivation either immediately (n = 493) or on symptomatic disease progression or occurrence of serious complications (n = 492). RESULTS: Baseline characteristics were well balanced in the two groups. Median age was 73 years (range, 52 to 81). At a median follow-up of 7.8 years, 541 of 985 patients had died, mostly of prostate cancer (n = 193) or cardiovascular disease (n = 185). The overall survival hazard ratio was 1.25 (95% CI, 1.05 to 1.48; noninferiority P > .1) favoring immediate treatment, seemingly due to fewer deaths of nonprostatic cancer causes (P = .06). The time from randomization to progression of hormone refractory disease did not differ significantly, nor did prostate-cancer specific survival. The median time to the start of deferred treatment after study entry was 7 years. In this group 126 patients (25.6%) died without ever needing treatment (44% of the deaths in this arm). CONCLUSION: Immediate androgen deprivation resulted in a modest but statistically significant increase in overall survival but no significant difference in prostate cancer mortality or symptom-free survival. This must be weighed on an individual basis against the adverse effects of life-long androgen deprivation, which may be avoided in a substantial number of patients with a deferred treatment policy.
Resumo:
The associations between life events in the 12 months preceding an episode of self-poisoning resulting in hospital attendance (the index episode), and the suicide intent of this episode were compared in individuals for whom the index episode was their first, episode and in individuals in whom it was a recurrence of DSH. Results indicated a significant interaction between independent life events, repetition status, and gender in the prediction of suicide intent, the association between life events and intent being moderated by repetition status in women only. The results provide preliminary evidence to suggest the presence of a suicidal process in women, in which the impact of negative life events on suicide intent diminishes across episodes.
Resumo:
BACKGROUND: Behavioural syndromes, i.e. consistent individual differences in behaviours that are correlated across different functional contexts, are a challenge to evolutionary reasoning because individuals should adapt their behaviour to the requirements of each situation. Behavioural syndromes are often interpreted as a result of constraints resulting in limited plasticity and inflexible behaviour. Alternatively, they may be adaptive if correlated ecological or social challenges functionally integrate apparently independent behaviours. To test the latter hypothesis we repeatedly tested helpers in the cooperative breeder Neolamprologus pulcher for exploration and two types of helping behaviour. In case of adaptive behavioural syndromes we predicted a positive relationship between exploration and aggressive helping (territory defence) and a negative relationship between these behaviours and non-aggressive helping (territory maintenance). RESULTS: As expected, helpers engaging more in territory defence were consistently more explorative and engaged less in territory maintenance, the latter only when dominant breeders were present. Contrary to our prediction, there was no negative relationship between exploration and territory maintenance. CONCLUSION: Our results suggest that the three behaviours we measured are part of behavioural syndromes. These may be adaptive, in that they reflect strategic specialization of helpers into one of two different life history strategies, namely (a) to stay and help in the home territory in order to inherit the breeding position or (b) to disperse early in order to breed independently.
Resumo:
This study will look at the passenger air bag (PAB) performance in a fix vehicle environment using Partial Low Risk Deployment (PLRD) as a strategy. This development will follow test methods against actual baseline vehicle data and Federal Motor Vehicle Safety Standards 208 (FMVSS 208). FMVSS 208 states that PAB compliance in vehicle crash testing can be met using one of three deployment methods. The primary method suppresses PAB deployment, with the use of a seat weight sensor or occupant classification sensor (OCS), for three-year old and six-year old occupants including the presence of a child seat. A second method, PLRD allows deployment on all size occupants suppressing only for the presents of a child seat. A third method is Low Risk Deployment (LRD) which allows PAB deployment in all conditions, all statures including any/all child seats. This study outlines a PLRD development solution for achieving FMVSS 208 performance. The results of this study should provide an option for system implementation including opportunities for system efficiency and other considerations. The objective is to achieve performance levels similar too or incrementally better than the baseline vehicles National Crash Assessment Program (NCAP) Star rating. In addition, to define systemic flexibility where restraint features can be added or removed while improving occupant performance consistency to the baseline. A certified vehicles’ air bag system will typically remain in production until the vehicle platform is redesigned. The strategy to enable the PLRD hypothesis will be to first match the baseline out of position occupant performance (OOP) for the three and six-year old requirements. Second, improve the 35mph belted 5th percentile female NCAP star rating over the baseline vehicle. Third establish an equivalent FMVSS 208 certification for the 25mph unbelted 50th percentile male. FMVSS 208 high-speed requirement defines the federal minimum crash performance required for meeting frontal vehicle crash-test compliance. The intent of NCAP 5-Star rating is to provide the consumer with information about crash protection, beyond what is required by federal law. In this study, two vehicles segments were used for testing to compare and contrast to their baseline vehicles performance. Case Study 1 (CS1) used a cross over vehicle platform and Case Study 2 (CS2) used a small vehicle segment platform as their baselines. In each case study, the restraints systems were from different restraint supplier manufactures and each case contained that suppliers approach to PLRD. CS1 incorporated a downsized twins shaped bag, a carryover inflator, standard vents, and a strategic positioned bag diffuser to help disperse the flow of gas to improve OOP. The twin shaped bag with two segregated sections (lobes) to enabled high-speed baseline performance correlation on the HYGE Sled. CS2 used an A-Symmetric (square shape) PAB with standard size vents, including a passive vent, to obtain OOP similar to the baseline. The A-Symmetric shape bag also helped to enabled high-speed baseline performance improvements in HYGE Sled testing in CS2. The anticipated CS1 baseline vehicle-pulse-index (VPI) target was in the range of 65-67. However, actual dynamic vehicle (barrier) testing was overshadowed with the highest crash pulse from the previous tested vehicles with a VPI of 71. The result from the 35mph NCAP Barrier test was a solid 4-Star (4.7 Star) respectfully. In CS2, the vehicle HYGE Sled development VPI range, from the baseline was 61-62 respectively. Actual NCAP test produced a chest deflection result of 26mm versus the anticipated baseline target of 12mm. The initial assessment of this condition was thought to be due to the vehicles significant VPI increase to 67. A subsequent root cause investigation confirmed a data integrity issue due to the instrumentation. In an effort to establish a true vehicle test data point a second NCAP test was performed but faced similar instrumentation issues. As a result, the chest deflect hit the target of 12.1mm; however a femur load spike, similar to the baseline, now skewed the results. With noted level of performance improvement in chest deflection, the NCAP star was assessed as directional for 5-Star capable performance. With an actual rating of 3-Star due to instrumentation, using data extrapolation raised the ratings to 5-Star. In both cases, no structural changes were made to the surrogate vehicle and the results in each case matched their perspective baseline vehicle platforms. These results proved the PLRD is viable for further development and production implementation.
Resumo:
Healthcare professionals and the public have increasing concerns about the ability of emergency departments to meet current demands. Increased demand for emergency services, mainly caused by a growing number of minor and moderate injuries has reached crisis proportions, especially in the United Kingdom. Numerous efforts have been made to explore the complex causes because it is becoming more and more important to provide adequate healthcare within tight budgets. Optimisation of patient pathways in the emergency department is therefore an important factor. This paper explores the possibilities offered by dynamic simulation tools to improve patient pathways using the emergency department of a busy university teaching hospital in Switzerland as an example.
Resumo:
As one of the largest and most complex organizations in the world, the Department of Defense (DoD) faces many challenges in solving its well-documented financial and related business operations and system problems. The DoD is in the process of implementing modern multifunction enterprise resource planning (ERP) systems to replace many of its outdated legacy systems. This paper explores the ERP implementations of the DoD and seeks to determine the impact of the ERP implementations on the alignment of the DoD’s business and IT strategy. A brief overview of the alignment literature and background on ERP are followed by case study analysis of the DoD ERP development and current implementation status. Lastly, the paper explores the current successes and failures of the ERP implementation and the impact on the DoD’s goal of strategic alignment.
Resumo:
PURPOSE: The aim of this study was to analyze prosthetic maintenance in partially edentulous patients with removable prostheses supported by teeth and strategic implants. MATERIALS AND METHODS: Sixty patients with removable partial prostheses and combined tooth-implant support were identified within the time period from 1998 to 2006. One group consisted of 42 patients (planned group) with a reduced residual dentition and in need of removable partial dentures (RPDs) or overdentures in the maxilla and/or mandible. They were admitted consecutively for treatment. Due to missing teeth in strategic important positions, one or two implants were placed to improve symmetrical denture support and retention. The majority of residual teeth exhibited an impaired structural integrity and therefore were provided with root copings for denture retention. A few vital teeth were used for telescopic crowns. The anchorage system for the strategic implants was selected accordingly. A second group of 18 patients (repair group) wearing RPDs with the loss of one abutment tooth due to biologic or mechanical failure was identified. These abutment teeth were replaced by 21 implants, and patients continued to wear their original prostheses. The observation time for planned and repair groups was 12 months to 8 years. All patients followed a regular maintenance schedule. Technical or biologic complications with supporting teeth or implants and prosthetic service were registered regularly. RESULTS: Three maxillary implants were lost after loading and three roots with copings had to be removed. Biologic problems included caries and periodontal/peri-implant infection with a significantly higher incidence in the repair group (P < .05). Technical complications with the dentures were rather frequent in both groups, mostly related to the anchorage system (matrices) of root copings and implants. Maintenance and complications were observed more frequently in the first year after delivery of the denture than in the following 3 years (P < .05). No denture had to be remade. CONCLUSIONS: The placement of a few implants allows for maintaining a compromised residual dentition for support of RPDs. The combination of root and implant support facilitates treatment planning and enhances designing the removable denture. It also proves to be a practical rescue method. Technical problems with the anchorage system were frequent, particularly in the first year after delivery of the dentures.