905 resultados para non-metallic material
Resumo:
The compulsory dispute resolution requirements in family law parenting cases create new roles and obligations for both lawyers and family dispute resolution (FDR) practitioners. This article will discuss how the legislative provisions impact on both sets of professionals in practice. It will also highlight the increased non-adversarial role of lawyers and a new role for FDR practitioners as “gatekeepers” to family courts in cases requiring FDR certificates.
Resumo:
The purpose of this document is to introduce non-specialists to the discipline and practice of public policy, particularly in relation to the construction sector in Australia. In order to do this, a brief overview of Australia’s government structure, and some of the main approaches to public policy analysis are outlined. Reference to construction related examples are provided to ensure issues discussed are relevant and understandable to construction professionals. Government is a significant player in the construction industry, and has multiple roles: adjudicator, regulator, constructor, purchaser and client of construction projects. Moreover there are many spheres of government that are typically engaged in construction projects at multiple stages. The machinery of government can be difficult to understand, even for long term public servants. Demystifying the processes within government can help to improve communication and therefore performance in the industry. A better understanding of how policy-making and government policies affect the construction industry will enhance communication and assist construction professionals and academics to understand and work with government. Additionally the document will provide an opportunity to demonstrate the relevance of policy analysis to inquiries of construction policies and regulation.
Resumo:
Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source. In the initial software, no attempt was made to choose between the results offered or construct a case for retention in the casebase. In this phase of the project, alternative data mining techniques will be explored and evaluated. A process for selecting a unique service life prediction for each query will also be investigated. This report summarises the initial evaluation of several data mining techniques.
Resumo:
In the previous phase of this project, 2002-059-B Case-Based Reasoning in Construction and Infrastructure Projects, demonstration software was developed using a case-base reasoning engine to access a number of sources of information on lifetime of metallic building components. One source of information was data from the Queensland Department of Public Housing relating to maintenance operations over a number of years. Maintenance information is seen as being a particularly useful source of data about service life of building components as it relates to actual performance of materials in the working environment. If a building is constructed in 1984 and the maintenance records indicate that the guttering was replaced in 2006, then the service life of the gutters was 22 years in that environment. This phase of the project aims to look more deeply at the Department of Housing data, as an example of maintenance records, and formulate methods for using this data to inform the knowledge of service lifetimes.
Resumo:
This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.
Resumo:
Maintenance of bridge structures is a major issue for the Queensland Department of Main Roads. In the previous phase of this CRC project an initial approach was made towards the development of a program for lifetime prediction of metallic bridge components. This involved the analysis of five representative bridge structures with respect to salt deposition (a major contributor to metallic corrosion) to determine common elements to be used as “cases” - those defined for buildings are not applicable. The five bridges analysed included the Gladstone Port Access Road Overpass, Stewart Road Overpass, South Johnstone River Bridge, Johnson Creek Bridge and the Ward River Bridge.
Resumo:
A survey of a number of schools in a number of different climates was carried out to determine the condition of building components of interest in the project. Schools in Melbourne, the Victorian Surf Coast, Brisbane, Townsville and the Sunshine Coast were inspected. A rating system was devised to categorise the components and the results collated in tables. Analysis of the data (where sufficient examples permitted) resulted in formulae to predict the service of the components and a database was derived.
Resumo:
Reliable budget/cost estimates for road maintenance and rehabilitation are subjected to uncertainties and variability in road asset condition and characteristics of road users. The CRC CI research project 2003-029-C ‘Maintenance Cost Prediction for Road’ developed a method for assessing variation and reliability in budget/cost estimates for road maintenance and rehabilitation. The method is based on probability-based reliable theory and statistical method. The next stage of the current project is to apply the developed method to predict maintenance/rehabilitation budgets/costs of large networks for strategic investment. The first task is to assess the variability of road data. This report presents initial results of the analysis in assessing the variability of road data. A case study of the analysis for dry non reactive soil is presented to demonstrate the concept in analysing the variability of road data for large road networks. In assessing the variability of road data, large road networks were categorised into categories with common characteristics according to soil and climatic conditions, pavement conditions, pavement types, surface types and annual average daily traffic. The probability distributions, statistical means, and standard deviation values of asset conditions and annual average daily traffic for each type were quantified. The probability distributions and the statistical information obtained in this analysis will be used to asset the variation and reliability in budget/cost estimates in later stage. Generally, we usually used mean values of asset data of each category as input values for investment analysis. The variability of asset data in each category is not taken into account. This analysis method demonstrated that it can be used for practical application taking into account the variability of road data in analysing large road networks for maintenance/rehabilitation investment analysis.
Resumo:
Practice placement education has been recognised as an integral and critical component of the training of occupational therapy students. Although there is an extensive body of literature on clinical education and traditional practice placement education models, there has been limited research on alternative placements.-------- This paper reviews the literature on various practice placement education models and presents a contemporary view on how it is currently delivered. The literature is examined with a particular focus on the increasing range of practice placement education opportunities, such as project and role-emerging placements. The drivers for non-traditional practice placement education include shortages of traditional placement options, health reform and changing work practices, potential for role development and influence on practice choice. The benefits and challenges of non-traditional practice placement education are discussed, including supervision issues, student evaluation, professional and personal development and the opportunity to practise clinical skills.--------- Further research is recommended to investigate occupational therapy graduates' perceptions of role-emerging and project placements in order to identify the benefits or otherwise of these placements and to contribute to the limited body of knowledge of emerging education opportunities.
Resumo:
The decision as to which procurement system to adopt is a complex and challenging task for clients of construction projects. Despite a plethora of tools and techniques available for selecting a procurement method, clients are still uncertain about what method to adopt for a given construction project to achieve success. This paper examines ‘how and why’ procurement methods are selected by public sector clients in Queensland (QLD) and Western Australia (WA). Findings from workshops with senior managers in procurement selection revealed that traditional lump sum methods (TLS) are preferred even though alternative forms could be better suited for a given project. Participants of the workshops agreed that alternative procurement forms should be considered for projects but an embedded culture of uncertainty avoidance meant the selection of TLS methods. It was perceived that only a limited number of contractors operating in the marketplace have the resources and experience to deliver projects using the non-traditional methods.
Resumo:
Non-motorized public transport (NMPT), especially three-wheeler cycle rickshaws, has a long history in East Asia; and has long been a major transport planning issue. Policy measures to restrict or eliminate NMPT have already been implemented in many developing cities with mixed success. However given the economic, social and cultural significance of NMPT, its environmental benefits, and the magnitude of its role in sustaining the mobility needs of citizens, it is timely to reconsider the future role of NMPT. Rather than pursuing policies to eliminate NMPT, a better approach may be to integrate motorized and non-motorized vehicles as complementary rather than competitive forces. With this backdrop and given the international significance of the problem, this paper examines the current role and significance of NMPT using Dhaka as a case study, and sets a research agenda for the future of NMPT in a sustainable transport system.
Resumo:
Objective-To establish the demographic, health status and insurance determinants of pre-hospital ambulance non-usage for patients with emergency medical needs. Methods-Triage category, date of birth, sex, marital status, country of origin, method and time of arrival, ambulance insurance status, diagnosis, and disposal were collected for all patients who presented over a four month period (n=10 229) to the emergency department of a major provincial hospital. Data for patients with urgent (n=678) or critical care needs (n=332) who did not use pre-hospital care were analysed using Poisson regression. Results-Only a small percentage (6.6%) of the total sample were triaged as having urgent medical needs or critical care needs (3.2%). Predictors of usage for those with urgent care needs included age greater than 65 years (prevalence ratio (PR)=0.54; 95% confidence interval (CI)= 0.35 to 0.83), being admitted to intensive care or transferred to another hospital (PR=0.62; 95% CI=0.44 to 0.89) or ward (PR=0.72; 95% CI=0.56 to 0.93) and ambulance insurance status (PR=0.67; 95% CI=052 to 0.86). Sex, marital status, time of day and country of origin were not predictive of usage and non-usage. Predictors of usage for those with critical care needs included age 65 years or greater (PR=0.45; 95% CI=0.25 to 0.81) and a diagnosis of trauma (PR=0.49; 95% CI=0.26 to 0.92). A non-English speaking background was predictive of non-usage (PR=1.98; 95% CI=1.06 to 3.70). Sex, marital status, time of day, triage and ambulance insurance status were not predictive of non-usage. Conclusions-Socioeconomic and medical factors variously influence ambulance usage depending on the severity or urgency of the medical condition. Ambulance insurance status was less of an influence as severity of condition increased suggesting that, at a critical level of urgency, patients without insurance are willing to pay for a pre-hospital ambulance service.
Resumo:
Most buildings constructed in Australia must comply with the Building Code of Australia (BCA). Checking for compliance against the BCA is a major task for both designers and building surveyors. This project carries out a prototype research using the EDM Model Checker and the SMC Model Checker for automated design checking against the Building Codes of Australia for use in professional practice. In this project, we develop a means of encoding design requirements and domain specific knowledge for building codes and investigate the flexibility of building models to contain design information. After assessing two implementations of EDM and SMC that check compliance against deemed-to-satisfy provision of building codes relevant to access by people with disabilities, an approach to automated code checking using a shared object-oriented database is established. This project can be applied in other potential areas – including checking a building design for non-compliance of many types of design requirements. Recommendations for future development and use in other potential areas in construction industries are discussed