871 resultados para large transportation network
Resumo:
A key concern organisations face is how to incorporate Internet tools into their marketing communications mix. Where and how should companies invest their human, technological and financial resources? This paper explores a subset of this problem, online complaining and electronic customer service. It applies diffusion of innovation as a theoretical framework to investigate organisational implementation of email technology and explain the outcome of annual customer service surveys in 2001, 2002 and 2003. The results add to the small body of research on electronic service recovery by extending diffusion of innovations to email service recovery and underscoring the importance of adoption phases, particularly for SMEs. Larger companies provide more channels for submitting complaints, which represents an early phase of adoption. There was little difference in how large and small companies respond to online complaints, a later phase of adoption.
Resumo:
In truck manufacturing, the exhaust and air inlet pipes are specialized equipment that requires highly skilled, heavy machinery and small batch production methods. This paper describes a project to develop the computer numerically controlled (CNC) pipe bending process for a truck component manufacturer. The company supplies a huge range of heavy duty truck parts to the domestic market and is a significant supplier in Australia. The company has been using traditional methods of machine assisted manual pipe bending techniques. In a drive of continuous improvement, the company has acquired a pre-owned CNC bending machine capable of bending pipes automatically up to 25 bends. However, due to process mismatch, this machine is only used for single bending operation. The researchers studied the bending system and changed the manufacturing process. Using an example exhaust pipe as the benchmark, a significant drop of manufacturing lead time from 70 minutes to 40 minutes for each pipe was demonstrated. There was also a decrease of material cost due to the multiple bends part in one piece without cutting excessive materials for each single bend like it used to be.
Resumo:
Mechanical harmonic transmissions are relatively new kind of drives having several unusual features. For example, they can provide reduction ratio up to 500:1 in one stage, have very small teeth module compared to conventional drives and very large number of teeth (up to 1000) on a flexible gear. If for conventional drives manufacturing methods are well-developed, fabrication of large size harmonic drives presents a challenge. For example, how to fabricate a thin shell of 1.7m in diameter and wall thickness of 30mm having high precision external teeth at one end and internal splines at the other end? It is so flexible that conventional fabrication methods become unsuitable. In this paper special fabrication methods are discussed that can be used for manufacturing of large size harmonic drive components. They include electro-slag welding and refining, the use of special expandable devices to locate and hold a flexible gear, welding peripheral parts of disks with wear resistant materials with subsequent machining and others. These fabrication methods proved to be effective and harmonic drives built with the use of these innovative technologies have been installed on heavy metallurgical equipment and successfully tested.
Resumo:
Principal Topic: It is well known that most new ventures suffer from a significant lack of resources, which increases the risk of failure (Shepherd, Douglas and Shanley, 2000) and makes it difficult to attract stakeholders and financing for the venture (Bhide & Stevenson, 1999). The Resource-Based View (RBV) (Barney, 1991; Wernerfelt, 1984) is a dominant theoretical base increasingly drawn on within Strategic Management. While theoretical contributions applying RBV in the domain of entrepreneurship can arguably be traced back to Penrose (1959), there has been renewed attention recently (e.g. Alvarez & Busenitz, 2001; Alvarez & Barney, 2004). This said, empirical work is in its infancy. In part, this may be due to a lack of well developed measuring instruments for testing ideas derived from RBV. The purpose of this study is to develop a measurement scales that can serve to assist such empirical investigations. In so doing we will try to overcome three deficiencies in current empirical measures used for the application of RBV to the entrepreneurship arena. First, measures for resource characteristics and configurations associated with typical competitive advantages found in entrepreneurial firms need to be developed. These include such things as alertness and industry knowledge (Kirzner, 1973), flexibility (Ebben & Johnson, 2005), strong networks (Lee et al., 2001) and within knowledge intensive contexts, unique technical expertise (Wiklund and Shepard, 2003). Second, the RBV has the important limitations of being relatively static and modelled on large, established firms. In that context, traditional RBV focuses on competitive advantages. However, newly established firms often face disadvantages, especially those associated with the liabilities of newness (Aldrich & Auster, 1986). It is therefore important in entrepreneurial contexts to expand to an investigation of responses to competitive disadvantage through an RBV lens. Conversely, recent research has suggested that resource constraints actually have a positive effect on firm growth and performance under some circumstances (e.g., George, 2005; Katila & Shane, 2005; Mishina et al., 2004; Mosakowski, 2002; cf. also Baker & Nelson, 2005). Third, current empirical applications of RBV measured levels or amounts of particular resources available to a firm. They infer that these resources deliver firms competitive advantage by establishing a relationship between these resource levels and performance (e.g. via regression on profitability). However, there is the opportunity to directly measure the characteristics of resource configurations that deliver competitive advantage, such as Barney´s well known VRIO (Valuable, Rare, Inimitable and Organized) framework (Barney, 1997). Key Propositions and Methods: The aim of our study is to develop and test scales for measuring resource advantages (and disadvantages) and inimitability for entrepreneurial firms. The study proceeds in three stages. The first stage developed our initial scales based on earlier literature. Where possible, we adapt scales based on previous work. The first block of the scales related to the level of resource advantages and disadvantages. Respondents were asked the degree to which each resource category represented an advantage or disadvantage relative to other businesses in their industry on a 5 point response scale: Major Disadvantage, Slight Disadvantage, No Advantage or Disadvantage, Slight Advantage and Major Advantage. Items were developed as follows. Network capabilities (3 items) were adapted from (Madsen, Alsos, Borch, Ljunggren & Brastad, 2006). Knowledge resources marketing expertise / customer service (3 items) and technical expertise (3 items) were adapted from Wiklund and Shepard (2003). flexibility (2 items), costs (4 items) were adapted from JIBS B97. New scales were developed for industry knowledge / alertness (3 items) and product / service advantages. The second block asked the respondent to nominate the most important resource advantage (and disadvantage) of the firm. For the advantage, they were then asked four questions to determine how easy it would be for other firms to imitate and/or substitute this resource on a 5 point likert scale. For the disadvantage, they were asked corresponding questions related to overcoming this disadvantage. The second stage involved two pre-tests of the instrument to refine the scales. The first was an on-line convenience sample of 38 respondents. The second pre-test was a telephone interview with a random sample of 31 Nascent firms and 47 Young firms (< 3 years in operation) generated using a PSED method of randomly calling households (Gartner et al. 2004). Several items were dropped or reworded based on the pre-tests. The third stage (currently in progress) is part of Wave 1 of CAUSEE (Nascent Firms) and FEDP (Young Firms), a PSED type study being conducted in Australia. The scales will be tested and analysed with a random sample of approximately 700 Nascent and Young firms respectively. In addition, a judgement sample of approximately 100 high potential businesses in each category will be included. Findings and Implications: The paper will report the results of the main study (stage 3 – currently data collection is in progress) will allow comparison of the level of resource advantage / disadvantage across various sub-groups of the population. Of particular interest will be a comparison of the high potential firms with the random sample. Based on the smaller pre-tests (N=38 and N=78) the factor structure of the items confirmed the distinctiveness of the constructs. The reliabilities are within an acceptable range: Cronbach alpha ranged from 0.701 to 0.927. The study will provide an opportunity for researchers to better operationalize RBV theory in studies within the domain of entrepreneurship. This is a fundamental requirement for the ability to test hypotheses derived from RBV in systematic, large scale research studies.
Resumo:
The capacity of the internet to handle micro-transactions and to cater to niche markets is a boon for some areas of the creative industries, which have always been associated with smallscale micro business activities. This paper looks at the specific case of the specialist Social Networking Site Ravelry: a site for knitters, crocheters, spinners and dyers. It traces the interactions between amateurs and professionals through the emergence of social networking sites. An analytic framework of social network markets (see Potts, Cunningham, Hartley and Omerod, 2008) is employed to allow for the inclusion of amateur, social, semi-professional,professional and institutional actors within a networked sphere of activity, rather than excluding some of these actors as outside of recognised value-production. The reliance on social networks to determine the economic success of design, production and consumption is exemplified in this small scale example. This paper eschews the dichotomy of commercial and non-commercial by bringing to the fore the hybridity of this site where financial and social economies co-exist.
Resumo:
We introduce K-tree in an information retrieval context. It is an efficient approximation of the k-means clustering algorithm. Unlike k-means it forms a hierarchy of clusters. It has been extended to address issues with sparse representations. We compare performance and quality to CLUTO using document collections. The K-tree has a low time complexity that is suitable for large document collections. This tree structure allows for efficient disk based implementations where space requirements exceed that of main memory.
Resumo:
“Hardware in the Loop” (HIL) testing is widely used in the automotive industry. The sophisticated electronic control units used for vehicle control are usually tested and evaluated using HIL-simulations. The HIL increases the degree of realistic testing of any system. Moreover, it helps in designing the structure and control of the system under test so that it works effectively in the situations that will be encountered in the system. Due to the size and the complexity of interaction within a power network, most research is based on pure simulation. To validate the performance of physical generator or protection system, most testing is constrained to very simple power network. This research, however, examines a method to test power system hardware within a complex virtual environment using the concept of the HIL. The HIL testing for electronic control units and power systems protection device can be easily performed at signal level. But performance of power systems equipments, such as distributed generation systems can not be evaluated at signal level using HIL testing. The HIL testing for power systems equipments is termed here as ‘Power Network in the Loop’ (PNIL). PNIL testing can only be performed at power level and requires a power amplifier that can amplify the simulation signal to the power level. A power network is divided in two parts. One part represents the Power Network Under Test (PNUT) and the other part represents the rest of the complex network. The complex network is simulated in real time simulator (RTS) while the PNUT is connected to the Voltage Source Converter (VSC) based power amplifier. Two way interaction between the simulator and amplifier is performed using analog to digital (A/D) and digital to analog (D/A) converters. The power amplifier amplifies the current or voltage signal of simulator to the power level and establishes the power level interaction between RTS and PNUT. In the first part of this thesis, design and control of a VSC based power amplifier that can amplify a broadband voltage signal is presented. A new Hybrid Discontinuous Control method is proposed for the amplifier. This amplifier can be used for several power systems applications. In the first part of the thesis, use of this amplifier in DSTATCOM and UPS applications are presented. In the later part of this thesis the solution of network in the loop testing with the help of this amplifier is reported. The experimental setup for PNIL testing is built in the laboratory of Queensland University of Technology and the feasibility of PNIL testing has been evaluated using the experimental studies. In the last section of this thesis a universal load with power regenerative capability is designed. This universal load is used to test the DG system using PNIL concepts. This thesis is composed of published/submitted papers that form the chapters in this dissertation. Each paper has been published or submitted during the period of candidature. Chapter 1 integrates all the papers to provide a coherent view of wide bandwidth switching amplifier and its used in different power systems applications specially for the solution of power systems testing using PNIL.
Resumo:
This document provides a review of international and national practices in investment decision support tools in road asset management. Efforts were concentrated on identifying analytic frameworks, evaluation methodologies and criteria adopted by current tools. Emphasis was also given to how current approaches support Triple Bottom Line decision-making. Benefit Cost Analysis and Multiple Criteria Analysis are principle methodologies in supporting decision-making in Road Asset Management. The complexity of the applications shows significant differences in international practices. There is continuing discussion amongst practitioners and researchers regarding to which one is more appropriate in supporting decision-making. It is suggested that the two approaches should be regarded as complementary instead of competitive means. Multiple Criteria Analysis may be particularly helpful in early stages of project development, say strategic planning. Benefit Cost Analysis is used most widely for project prioritisation and selecting the final project from amongst a set of alternatives. Benefit Cost Analysis approach is useful tool for investment decision-making from an economic perspective. An extension of the approach, which includes social and environmental externalities, is currently used in supporting Triple Bottom Line decision-making in the road sector. However, efforts should be given to several issues in the applications. First of all, there is a need to reach a degree of commonality on considering social and environmental externalities, which may be achieved by aggregating the best practices. At different decision-making level, the detail of consideration of the externalities should be different. It is intended to develop a generic framework to coordinate the range of existing practices. The standard framework will also be helpful in reducing double counting, which appears in some current practices. Cautions should also be given to the methods of determining the value of social and environmental externalities. A number of methods, such as market price, resource costs and Willingness to Pay, are found in the review. The use of unreasonable monetisation methods in some cases has discredited Benefit Cost Analysis in the eyes of decision makers and the public. Some social externalities, such as employment and regional economic impacts, are generally omitted in current practices. This is due to the lack of information and credible models. It may be appropriate to consider these externalities in qualitative forms in a Multiple Criteria Analysis. Consensus has been reached in considering noise and air pollution in international practices. However, Australia practices generally omitted these externalities. Equity is an important consideration in Road Asset Management. The considerations are either between regions, or social groups, such as income, age, gender, disable, etc. In current practice, there is not a well developed quantitative measure for equity issues. More research is needed to target this issue. Although Multiple Criteria Analysis has been used for decades, there is not a generally accepted framework in the choice of modelling methods and various externalities. The result is that different analysts are unlikely to reach consistent conclusions about a policy measure. In current practices, some favour using methods which are able to prioritise alternatives, such as Goal Programming, Goal Achievement Matrix, Analytic Hierarchy Process. The others just present various impacts to decision-makers to characterise the projects. Weighting and scoring system are critical in most Multiple Criteria Analysis. However, the processes of assessing weights and scores were criticised as highly arbitrary and subjective. It is essential that the process should be as transparent as possible. Obtaining weights and scores by consulting local communities is a common practice, but is likely to result in bias towards local interests. Interactive approach has the advantage in helping decision-makers elaborating their preferences. However, computation burden may result in lose of interests of decision-makers during the solution process of a large-scale problem, say a large state road network. Current practices tend to use cardinal or ordinal scales in measure in non-monetised externalities. Distorted valuations can occur where variables measured in physical units, are converted to scales. For example, decibels of noise converts to a scale of -4 to +4 with a linear transformation, the difference between 3 and 4 represents a far greater increase in discomfort to people than the increase from 0 to 1. It is suggested to assign different weights to individual score. Due to overlapped goals, the problem of double counting also appears in some of Multiple Criteria Analysis. The situation can be improved by carefully selecting and defining investment goals and criteria. Other issues, such as the treatment of time effect, incorporating risk and uncertainty, have been given scant attention in current practices. This report suggested establishing a common analytic framework to deal with these issues.
Resumo:
This document provides the findings of an international review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different countries and international organisations. Road assets are powerful drivers of economic development and social equity. They also have significant impacts on the natural and man-made environment. The traditional definition of asset management is “A systematic process of maintaining, upgrading and operating physical assets cost effectively. It combines engineering principles with sound business practices and economic theory and it provides tools to facilitate a more organised, logical approach to decision-making” (US Dept. of Transportation, 1999). In recent years, the concept has been broadened to cover the complexity of decision making, based on a wider variety of policy considerations as well as social and environmental issues rather than is covered by Benefit-Cost analysis and pure technical considerations. Current international practices are summarised in table 2. It was evident that Engineering-economic analysis methods are well advanced to support decision-making. A range of tools available supports performance predicting of road assets and associated cost/benefit in technical context. The need for considering triple plus one bottom line of social, environmental and economic as well as political factors in decision-making is well understood by road agencies around the world. The techniques used to incorporate these however, are limited. Most countries adopt a scoring method, a goal achievement matrix or information collected from surveys. The greater uncertainty associated with these non-quantitative factors has generally not been taken into consideration. There is a gap between the capacities of the decision-making support systems and the requirements from decision-makers to make more rational and transparent decisions. The challenges faced in developing an integrated decision making framework are both procedural and conceptual. In operational terms, the framework should be easy to be understood and employed. In philosophical terms, the framework should be able to deal with challenging issues, such as uncertainty, time frame, network effects, model changes, while integrating cost and non-cost values into the evaluation. The choice of evaluation techniques depends on the feature of the problem at hand, on the aims of the analysis, and on the underlying information base At different management levels, the complexity in considering social, environmental, economic and political factor in decision-making is different. At higher the strategic planning level, more non-cost factors are involved. The complexity also varies based on the scope of the investment proposals. Road agencies traditionally place less emphasis on evaluation of maintenance works. In some cases, social equity, safety, environmental issues have been used in maintenance project selection. However, there is not a common base for the applications.
Final : report assessing risk and variation in maintenance and rehabilitation costs for road network
Resumo:
This report presents the results of research projects conducted by The Australian Cooperative Research Centre for Construction Innovation, Queensland University of Technology, RMIT University, Queensland Government Department of Main Roads and Queensland Department of Public Works. The research projects aimed at developing a methodology for assessing variation and risk in investment in road network, including the application of the method in assessing road network performance and maintenance and rehabilitation costs for short- and long-term future investment.
Resumo:
Research on social networking sites like Facebook is emerging but sparse. This exploratory study investigates the value users derive from self-described ‘cool’ Facebook applications, and explores the features that either encourage or discourage users to recommend applications to their friends. The concepts of value and cool are explored in a social networking context. Our qualitative data reveals consumers derive a combination of functional value along with either social or emotional value from the applications. Female Facebook users indicate self-expression as important motivators, while males tend to use Facebook applications to socially compete. Three broad categories emerged for application features; symmetrical features can both encourage or discourage recommendation, polar features where different levels of the same feature encourage or discourage, and uni-directional features only encourage or discourage but not both. Recommending or not recommending an application tends to be the result of a combination of features and context, rather than one feature in isolation.
Resumo:
Climate change and human activity are subjecting the environment to unprecedented rates of change. Monitoring these changes is an immense task that demands new levels of automated monitoring and analysis. We propose the use of acoustics as a proxy for the time consuming auditing of fauna, especially for determining the presence/absence of species. Acoustic monitoring is deceptively simple; seemingly all that is required is a sound recorder. However there are many major challenges if acoustics are to be used for large scale monitoring of ecosystems. Key issues are scalability and automation. This paper discusses our approach to this important research problem. Our work is being undertaken in collaboration with ecologists interested both in identifying particular species and in general ecosystem health.
Resumo:
Construction organisations comprise geographically dispersed virtually-linked suborganisations that work together to realise projects. They increasingly do so using information and communication technology (ICT) to communicate, coordinate their activities and to solve complex problems. One salient problem they face is how to effectively use requisite ICT tools. One important tool at their disposal is the self-help group, a body of people that organically spring up to solve shared problems. The more recognised term for this organisational form is a community of practice (COP). COPs generate knowledge networks that enhance and sustain competitive advantage and they are also used to help COP members actually use ICT tools. Etienne Wenger defines communities of practice as “groups of people informally bound together by shared expertise and passion for a joint enterprise” (Wenger and Snyder 2000, p139). This ‘chicken-or-egg’ issue about needing a COP to use the tools that are needed to effective broaden COPs (beyond co-located these groups) led us to explore how best to improve the process of ICT diffusion through construction organisations— primarily using people supported by technology that improves knowledge sharing. We present insights gained from recent PhD research results in this area. A semistructured interview approach was used to collect data from ICT strategists and users in the three large Australian construction organisations that are among the 10 or so first tier companies by annual dollar turnover in Australia. The interviewees were categorised into five organisational levels: IT strategist, implementer, project or engineering manager, site engineer and foreman. The focus of the study was on the organisation and the way that it implements ICT diffusion of a groupware ICT diffusion initiative. Several types of COP networks from the three Australian cases are identified: withinorganisation COP; institutional, implementer or technical support; project manager/engineer focussed; and collegial support. Also, there are cross-organisational COPs that organically emerge as a result of people sharing an interest or experience in something significant. Firstly, an institutional network is defined as a strategic group, interested in development of technology innovation within an organisation. This COP principally links business process domain experts with an ICT strategist.