932 resultados para flow modelling
Resumo:
In this paper we present a model for defining and enforcing a fine-grained information flow policy. We describe how the policy can be enforced on a typical computer and present experiments using the proposed model. A key feature of the model is that it allows the expression of rules which detail precisely which information elements are allowed to mix together. For example, the model allows the expression of a policy which forbids a doctor from mixing the personal medical details of the patients. The enforcement mechanisms tracks and records information flows within the system so that dynamic changes to the policy can be made with respect to information elements which may have propagated to different locations in the system.
Resumo:
In this paper, the optimal design of an active flow control device; Shock Control Bump (SCB) on suction and pressure sides of transonic aerofoil to reduce transonic total drag is investigated. Two optimisation test cases are conducted using different advanced Evolutionary Algorithms (EAs); the first optimiser is the Hierarchical Asynchronous Parallel Evolutionary Algorithm (HAPMOEA) based on canonical Evolutionary Strategies (ES). The second optimiser is the HAPMOEA is hybridised with one of well-known Game Strategies; Nash-Game. Numerical results show that SCB significantly reduces the drag by 30% when compared to the baseline design. In addition, the use of a Nash-Game strategy as a pre-conditioner of global control saves computational cost up to 90% when compared to the first optimiser HAPMOEA.
Resumo:
Water Sensitive Urban Design (WSUD) systems have the potential mitigate the hydrologic disturbance and water quality concerns associated with stormwater runoff from urban development. In the last few years WSUD has been strongly promoted in South East Queensland (SEQ) and new developments are now required to use WSUD systems to manage stormwater runoff. However, there has been limited field evaluation of WSUD systems in SEQ and consequently knowledge of their effectiveness in the field, under storm events, is limited. The objective of this research project was to assess the effectiveness of WSUD systems installed in a residential development, under real storm events. To achieve this objective, a constructed wetland, bioretention swale and a bioretention basin were evaluated for their ability to improve the hydrologic and water quality characteristics of stormwater runoff from urban development. The monitoring focused on storm events, with sophisticated event monitoring stations measuring the inflow and outflow from WSUD systems. Data analysis undertaken confirmed that the constructed wetland, bioretention basin and bioretention swale improved the hydrologic characteristics by reducing peak flow. The bioretention systems, particularly the bioretention basin also reduced the runoff volume and frequency of flow, meeting key objectives of current urban stormwater management. The pollutant loads were reduced by the WSUD systems to above or just below the regional guidelines, showing significant reductions to TSS (70-85%), TN (40-50%) and TP (50%). The load reduction of NOx and PO4 3- by the bioretention basin was poor (<20%), whilst the constructed wetland effectively reduced the load of these pollutants in the outflow by approximately 90%. The primary reason for the load reduction in the wetland was due to a reduction in concentration in the outflow, showing efficient treatment of stormwater by the system. In contrast, the concentration of key pollutants exiting the bioretention basin were higher than the inflow. However, as the volume of stormwater exiting the bioretention basin was significantly lower than the inflow, a load reduction was still achieved. Calibrated MUSIC modelling showed that the bioretention basin, and in particular, the constructed wetland were undersized, with 34% and 62% of stormwater bypassing the treatment zones in the devices. Over the long term, a large proportion of runoff would not receive treatment, considerably reducing the effectiveness of the WSUD systems.
Resumo:
This paper takes Kent and Taylor’s (2002) call to develop a dialogic theory of public relations and suggests that a necessary first step is the modelling of the process of dialogic communication in public relations. In order to achieve this, extant literature from a range of fields is reviewed, seeking to develop a definition of dialogic communication that is meaningful to the practice of contemporary public relations. A simple transmission model of communication is used as a starting point. This is synthesised with concepts relating specifically to dialogue, taken here in its broadest sense rather than defined as any one particular outcome. The definition that emerges from this review leads to the conclusion that dialogic communication in public relations involves the interaction of three roles – those of sender, receiver, and responder. These three roles are shown to be adopted at different times by both participants involved in dialogic communication. It is further suggested that variations occur in how these roles are conducted: the sender and receiver roles can be approached in a passive or an active way, while the responder role can be classified as being either resistant or responsive to the information received in dialogic communication. The final modelling of the definition derived provides a framework which can be tested in the field to determine whether variations in the conduct of the roles in dialogic communication actually exist, and if so, whether they can be linked to the different types of outcome from dialogic communication identified previously in the literature.
Resumo:
Port land uses are subjected to unique anthropogenic activities compared to typical urban land uses. This uniqueness results in distinctive stormwater quality characteristics. Such distinction in stormwater quality has made conventional approaches used for pollutant load estimations inaccurate. This is also the case for the Port of Brisbane (PoB). The study discussed in the paper was conducted to estimate the pollutant contributions from Port specific land uses at PoB. For estimation, software modules embedded in Mike URBAN were used. An innovative approach was adopted in modelling where the conventional model calibration step was not needed to be performed to generate suitable site specific parameters. Instead, equations and site specific parameters that replicate pollutant build-up and wash-off were generated from an extensive field investigation. Models were simulated incorporating site specific parameters from six different Port specific land uses and rainfall events from three representative years. Outcomes of the modelling exercise were used to identify the distinct pollutant contributions from different Port land uses.
Resumo:
Accurate estimation of input parameters is essential to ensure the accuracy and reliability of hydrologic and water quality modelling. Calibration is an approach to obtain accurate input parameters for comparing observed and simulated results. However, the calibration approach is limited as it is only applicable to catchments where monitoring data is available. Therefore, methodology to estimate appropriate model input parameters is critical, particularly for catchments where monitoring data is not available. In the research study discussed in the paper, pollutant build-up parameters derived from catchment field investigations and model calibration using MIKE URBAN are compared for three catchments in Southeast Queensland, Australia. Additionally, the sensitivity of MIKE URBAN input parameters was analysed. It was found that Reduction Factor is the most sensitive parameter for peak flow and total runoff volume estimation whilst Build-up rate is the most sensitive parameter for TSS load estimation. Consequently, these input parameters should be determined accurately in hydrologic and water quality simulations using MIKE URBAN. Furthermore, an empirical equation for Southeast Queensland, Australia for the conversion of build-up parameters derived from catchment field investigations as MIKE URBAN input build-up parameters was derived. This will provide guidance for allowing for regional variations in the estimation of input parameters for catchment modelling using MIKE URBAN where monitoring data is not available.
Resumo:
An Asset Management (AM) life-cycle constitutes a set of processes that align with the development, operation and maintenance of assets, in order to meet the desired requirements and objectives of the stake holders of the business. The scope of AM is often broad within an organization due to the interactions between its internal elements such as human resources, finance, technology, engineering operation, information technology and management, as well as external elements such as governance and environment. Due to the complexity of the AM processes, it has been proposed that in order to optimize asset management activities, process modelling initiatives should be adopted. Although organisations adopt AM principles and carry out AM initiatives, most do not document or model their AM processes, let alone enacting their processes (semi-) automatically using a computer-supported system. There is currently a lack of knowledge describing how to model AM processes through a methodical and suitable manner so that the processes are streamlines and optimized and are ready for deployment in a computerised way. This research aims to overcome this deficiency by developing an approach that will aid organisations in constructing AM process models quickly and systematically whilst using the most appropriate techniques, such as workflow technology. Currently, there is a wealth of information within the individual domains of AM and workflow. Both fields are gaining significant popularity in many industries thus fuelling the need for research in exploring the possible benefits of their cross-disciplinary applications. This research is thus inspired to investigate these two domains to exploit the application of workflow to modelling and execution of AM processes. Specifically, it will investigate appropriate methodologies in applying workflow techniques to AM frameworks. One of the benefits of applying workflow models to AM processes is to adapt and enable both ad-hoc and evolutionary changes over time. In addition, this can automate an AM process as well as to support the coordination and collaboration of people that are involved in carrying out the process. A workflow management system (WFMS) can be used to support the design and enactment (i.e. execution) of processes and cope with changes that occur to the process during the enactment. So far few literatures can be found in documenting a systematic approach to modelling the characteristics of AM processes. In order to obtain a workflow model for AM processes commonalities and differences between different AM processes need to be identified. This is the fundamental step in developing a conscientious workflow model for AM processes. Therefore, the first stage of this research focuses on identifying the characteristics of AM processes, especially AM decision making processes. The second stage is to review a number of contemporary workflow techniques and choose a suitable technique for application to AM decision making processes. The third stage is to develop an intermediate ameliorated AM decision process definition that improves the current process description and is ready for modelling using the workflow language selected in the previous stage. All these lead to the fourth stage where a workflow model for an AM decision making process is developed. The process model is then deployed (semi-) automatically in a state-of-the-art WFMS demonstrating the benefits of applying workflow technology to the domain of AM. Given that the information in the AM decision making process is captured at an abstract level within the scope of this work, the deployed process model can be used as an executable guideline for carrying out an AM decision process in practice. Moreover, it can be used as a vanilla system that, once being incorporated with rich information from a specific AM decision making process (e.g. in the case of a building construction or a power plant maintenance), is able to support the automation of such a process in a more elaborated way.
Resumo:
Physical infrastructure assets are important components of our society and our economy. They are usually designed to last for many years, are expected to be heavily used during their lifetime, carry considerable load, and are exposed to the natural environment. They are also normally major structures, and therefore present a heavy investment, requiring constant management over their life cycle to ensure that they perform as required by their owners and users. Given a complex and varied infrastructure life cycle, constraints on available resources, and continuing requirements for effectiveness and efficiency, good management of infrastructure is important. While there is often no one best management approach, the choice of options is improved by better identification and analysis of the issues, by the ability to prioritise objectives, and by a scientific approach to the analysis process. The abilities to better understand the effect of inputs in the infrastructure life cycle on results, to minimise uncertainty, and to better evaluate the effect of decisions in a complex environment, are important in allocating scarce resources and making sound decisions. Through the development of an infrastructure management modelling and analysis methodology, this thesis provides a process that assists the infrastructure manager in the analysis, prioritisation and decision making process. This is achieved through the use of practical, relatively simple tools, integrated in a modular flexible framework that aims to provide an understanding of the interactions and issues in the infrastructure management process. The methodology uses a combination of flowcharting and analysis techniques. It first charts the infrastructure management process and its underlying infrastructure life cycle through the time interaction diagram, a graphical flowcharting methodology that is an extension of methodologies for modelling data flows in information systems. This process divides the infrastructure management process over time into self contained modules that are based on a particular set of activities, the information flows between which are defined by the interfaces and relationships between them. The modular approach also permits more detailed analysis, or aggregation, as the case may be. It also forms the basis of ext~nding the infrastructure modelling and analysis process to infrastructure networks, through using individual infrastructure assets and their related projects as the basis of the network analysis process. It is recognised that the infrastructure manager is required to meet, and balance, a number of different objectives, and therefore a number of high level outcome goals for the infrastructure management process have been developed, based on common purpose or measurement scales. These goals form the basis of classifYing the larger set of multiple objectives for analysis purposes. A two stage approach that rationalises then weights objectives, using a paired comparison process, ensures that the objectives required to be met are both kept to the minimum number required and are fairly weighted. Qualitative variables are incorporated into the weighting and scoring process, utility functions being proposed where there is risk, or a trade-off situation applies. Variability is considered important in the infrastructure life cycle, the approach used being based on analytical principles but incorporating randomness in variables where required. The modular design of the process permits alternative processes to be used within particular modules, if this is considered a more appropriate way of analysis, provided boundary conditions and requirements for linkages to other modules, are met. Development and use of the methodology has highlighted a number of infrastructure life cycle issues, including data and information aspects, and consequences of change over the life cycle, as well as variability and the other matters discussed above. It has also highlighted the requirement to use judgment where required, and for organisations that own and manage infrastructure to retain intellectual knowledge regarding that infrastructure. It is considered that the methodology discussed in this thesis, which to the author's knowledge has not been developed elsewhere, may be used for the analysis of alternatives, planning, prioritisation of a number of projects, and identification of the principal issues in the infrastructure life cycle.