999 resultados para axisymmetric flows


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de doutoramento, Ciências Geofísicas e da Geoinformação (Oceanografia), Universidade de Lisboa, Faculdade de Ciências, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Water use invariably results in major impacts on river flows. Environmental Flows (EF) are defined as the quantity and quality of water that is needed to preserve the structure and the function of the river and riparian zone ecosystem and sufficient quantity of water to enable the survival and reproduction of aquatic organisms in different hydraulic habitats. This paper describes the criteria and methods used to determine EF and experiences with their application in Slovenia. The diversity of running waters of Slovenia demand special treatment and determination of EF for each individual section of the river system. Using hydrological, morphological and ecological criteria, two different approaches are used for the determination of EF in Slovenia, a rapid assessment method and a detailed assessment method. For both methods, data are then analyzed by an expert panel in order to determine an EF. Since 1994, more than 180 study sites have been examined for research and application of EF in Slovenia. Determination of EF for existing users has prioritized their water requirements so they can remain economically viable. Where new schemes are proposed, there has been much greater scope to prioritize ecosystem requirements. EF determination is receiving growing attention and will continue to increase in importance, driven by research that aids our understanding of flow-biota relationships and recent environmental policy and legislation at both the national and European level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper addresses road freight transport operations during the London Olympic and Paralympic Games in 2012. It presents work carried out prior to the Games to understand pre-Games patterns of freight deliveries in London (for both light and heavy goods vehicles) and the results of modelling work carried out to assess the likely impacts of the Games road restrictions on freight operations. The modelling results indicated that increases in total hours travelled carrying out collection and delivery work would range from 1.4% to 11.4% in the six sectors considered. The results suggested increases in hours travelled in excess of 3.5% in four of the six sectors modelled. The possible actions that could be taken by organizations to reduce these negative impacts were also modelled and the results indicated that such actions would help to mitigate the impact of the road restrictions imposed on operators during the Games. The actual impacts of the 2012 Games on transport both in general terms and specifically in terms of freight transport are also discussed, together with the success of the actions taken by Transport for London (TfL) to help the road freight industry. The potential freight transport legacy of the London 2012 Games in terms of achieving more sustainable urban freight transport is considered and the steps being taken by TfL to help ensure that such a legacy can be realized are discussed. Such steps include policy-makers continuing to collaborate closely with the freight industry through the ‘London Freight Forum’, and TfL's efforts to encourage and support companies revising their delivery and collection times to the off-peak; improving freight planning in the design and management of TfL-funded road schemes; electronic provision of traffic information by TfL to the freight industry, and the further development of freight journey planning tools.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing Workflow Management Systems (WFMSs) follow a pragmatic approach. They often use a proprietary modelling language with an intuitive graphical layout. However the underlying semantics lack a formal foundation. As a consequence, analysis issues, such as proving correctness i.e. soundness and completeness, and reliable execution are not supported at design level. This project will be using an applied ontology approach by formally defining key terms such as process, sub-process, action/task based on formal temporal theory. Current business process modelling (BPM) standards such as Business Process Modelling Notation (BPMN) and Unified Modelling Language (UML) Activity Diagram (AD) model their constructs with no logical basis. This investigation will contribute to the research and industry by providing a framework that will provide grounding for BPM to reason and represent a correct business process (BP). This is missing in the current BPM domain, and may result in reduction of the design costs and avert the burden of redundant terms used by the current standards. A graphical tool will be introduced which will implement the formal ontology defined in the framework. This new tool can be used both as a modelling tool and at the same time will serve the purpose of validating the model. This research will also fill the existing gap by providing a unified graphical representation to represent a BP in a logically consistent manner for the mainstream modelling standards in the fields of business and IT. A case study will be conducted to analyse a catalogue of existing ‘patient pathways’ i.e. processes, of King’s College Hospital NHS Trust including current performance statistics. Following the application of the framework, a mapping will be conducted, and new performance statistics will be collected. A cost/benefits analysis report will be produced comparing the results of the two approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cluster scheduling and collision avoidance are crucial issues in large-scale cluster-tree Wireless Sensor Networks (WSNs). The paper presents a methodology that provides a Time Division Cluster Scheduling (TDCS) mechanism based on the cyclic extension of RCPS/TC (Resource Constrained Project Scheduling with Temporal Constraints) problem for a cluster-tree WSN, assuming bounded communication errors. The objective is to meet all end-to-end deadlines of a predefined set of time-bounded data flows while minimizing the energy consumption of the nodes by setting the TDCS period as long as possible. Sinceeach cluster is active only once during the period, the end-to-end delay of a given flow may span over several periods when there are the flows with opposite direction. The scheduling tool enables system designers to efficiently configure all required parameters of the IEEE 802.15.4/ZigBee beaconenabled cluster-tree WSNs in the network design time. The performance evaluation of thescheduling tool shows that the problems with dozens of nodes can be solved while using optimal solvers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The simulation analysis is important approach to developing and evaluating the systems in terms of development time and cost. This paper demonstrates the application of Time Division Cluster Scheduling (TDCS) tool for the configuration of IEEE 802.15.4/ZigBee beaconenabled cluster-tree WSNs using the simulation analysis, as an illustrative example that confirms the practical applicability of the tool. The simulation study analyses how the number of retransmissions impacts the reliability of data transmission, the energy consumption of the nodes and the end-to-end communication delay, based on the simulation model that was implemented in the Opnet Modeler. The configuration parameters of the network are obtained directly from the TDCS tool. The simulation results show that the number of retransmissions impacts the reliability, the energy consumption and the end-to-end delay, in a way that improving the one may degrade the others.