983 resultados para PERIVASCULAR DRAINAGE
Resumo:
The purpose of this project was to determine the optimal hole pattern needed for undersealing work, and also to determine if it is feasible to underseal a roadway with existing longitudinal subdrains without plugging the subdrain system. At the test site the hole pattern had little effect on the grout distribution. It was found that the hole pattern, to be effective, must locate existing voids and that holes must extend at least 2 in. (5 cm) below the underside of the pavement. It appeared that pavements can be undersealed without significant damage to the existing subdrains, but special care is needed to assure that excess grout is not injected into the drainage system. Recommendations are made concerning the hole pattern, grout efflux time, and procedures for minimizing the risk of plugging the subdrains with grout.
Resumo:
The purpose of this research was to evaluate the materials Iowa uses as a granular subbase and to determine if it provides adequate drainage. Numerous laboratory and in-situ tests were conducted on the materials currently being used in Iowa. The follow conclusions can be made based on the test results: 1. The crushed concrete that is used as a subbase material has a relatively low permeability compared to many other materials used by other states. 2. Further research and tests are needed to find the necessary parameters for crushed concrete to make sure it is providing its optimum drainage and preventing premature damage of the pavement. 3. We have definitely made improvements in drainage in the past few months, but there are many areas that we can improve on that will increase the permeability of this material and insure that the pavement system is safe from premature damage due to water. The current gradation specification for granular subbase material at the start of this study was: Sieve # % Passing 1” 100 #8 10-35 #50 0-15 #200 0-6
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite." It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive compared with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert to avoid deformation of the liner.
Resumo:
BACKGROUND: Esophageal replacement for caustic stenosis in children poses a challenging surgical problem. Blind removal of the injured esophagus without thoracotomy through a left cervical and transhiatal approach followed by an orthotopic esophageal replacement using either the colon or the stomach is a difficult procedure and can be dangerous in children. We performed our first total laparoscopic transhiatal esophagectomy in February 2007. We aim to compare this new technique to the previously applied method of blind closed-chest esophagectomy through a cervicotomy and laparotomy. METHODS: We analyzed the surgery and follow-up of 40 children operated upon for extensive irreversible caustic burns of the esophagus. The first 20 esophageal replacements were performed following a blind dissection of the mediastinum through a cervical incision and a laparotomy for esophagectomy (Group I). The last 20 esophageal replacements were performed after laparoscopic transhiatal dissection in the mediastinum and cervicotomy in the neck for esophagectomy (Group II). All operations were performed under the supervision of the same senior surgeon. RESULTS: Average age at the time of surgery was the same in both groups. Total esophagectomy was achieved in 45.0% of cases in Group I versus in 90.0% of cases in Group II. Colon was used in 80.0% of cases in Group I and in 90.0% in Group II. The mean duration of surgery was one hour longer in the laparoscopy group. One vascular injury was reported in the blind laparotomy group. Pneumothorax was more frequent in Group II without significant consequences besides drainage. Average time of extubation was about the same in both groups (1.8days). CONCLUSION: Laparoscopic transhiatal esophagectomy for caustic burns before esophageal replacement in children is safe and effective. It could avoid vascular and bronchial mediastinal injuries as the dissection is performed under direct visual control. The routine use of laparoscopic assistance by a senior surgeon improves the safety of esophageal dissection and reduces life-threatening complications.
Resumo:
Iowa counties have tried to rehabilitate deteriorating portland cement concrete (PCC) pavements with standard overlays, placement of engineering fabric, rock, open graded bituminous mixes and cracking and seating. While these methods prolong the life of the road, the cracks in the old pavement have eventually reflected to the surface. One possible alternative for rehabilitating severely deteriorated roads and preventing reflective cracking is the rubblization process. The objective of this research project was to rehabilitate and evaluate a severely deteriorated PCC roadway using a rubblization process. A 3.0 km (1.9 mi) section of L63 in Mills County was selected for this research. The road was divided into 16 sections. A resonate frequency vibration pavement breaker was used to rubblize the existing pavement. The variables of rubblization, drainage, and ACC overlay depths of 75 mm (3 in.), 100 mm (4 in.), and 125 mm (5 in.) were evaluated. The research on rubblized concrete pavement bases support the following conclusions: (1) The rubblization process prevents reflective cracking; (2) Edge drains improved the structural rating of the rubblized roadway; (3) An ACC overlay of 125 mm (5 in.) on a rubblized base provided an excellent roadway regardless of soil and drainage conditions; (4) An ACC overlay of 75 mm (3 in.) on a rubblized base can provide a good roadway if the soil structure below the rubblized base is stable and well drained; and (5) The Road Rater structural ratings of the rubblized test sections for this project are comparable to the nonrubblized test sections.
Resumo:
The objective of this research project was to evaluate field application results and determine whether the Earth-Gard mat made from recycled material would successfully control erosion and allow vegetation to establish in ditch bottoms and steep slopes. The research would also help determine how steep a grade in the ditch bottoms can be protected from rill and gully erosion and how steep and long a backslope or foreslope can be protected from sheet and rill erosion by the recycled material and allow establishment of vegetation. The Earth-Gard gave satisfactory performance on areas with limited drainage and gradual slopes. Earth-Gard had a longevity of only six months. It was eroded away when used on areas with greater flow or steeper slopes.
Resumo:
The majority of Crohn's disease patients will develop a complicated disease course over time which is characterized by the occurrence of stricturing and penetrating disease. Penetrating disease comprises internal fistulas (e.g. enteroenteric) and perianal disease. A complicated disease course may be associated with considerable morbidity and professional and personal disabilities. Treatment options for fibrostenotic Crohn's disease comprise endoscopic balloon dilation, stricturoplasties and surgical resection. Treatment of symptomatic perianal fistulizing disease is based on antibiotics, immunomodulators and anti-TNF drugs. Surgical measures include fistula drainage by means of setons, temporary ileostomy or a proctectomy. The presence of internal fistulas often necessitates surgical measures. A close collaboration between the gastroenterologist and the surgeon is mandatory to solve these interdisciplinary challenges.
Resumo:
Fibroblastic and myofibroblastic tumors of the head and neck are numerous and may develop either in adults or in childhood. They can be benign and nonrecurring, benign but locally recurring, of low-grade of malignancy or fully malignant. The diagnosis and treatment of these lesions can be difficult. This review focuses on several (myo)fibroblastic lesions of the head and neck, including nodular fasciitis and related neoplasms, hemangiopericytoma-like tumor (glomangiopericytoma) of sinonasal passages, nasopharyngeal angiofibroma, desmoid fibromatosis, Gardner-associated fibroma, extrapleural solitary fibrous tumor, inflammatory myofibroblastic tumor, low-grade myofibroblastic sarcoma, and adult-type fibrosarcoma.
Resumo:
Background: The appropriateness of use of therapy for severe active luminal Crohn's disease (CD) cases has never been formally assessed. The European panel on the appropriateness of Crohn's disease therapy [EPACT (http://www.epact.ch)] developed appropriateness criteria. We have applied these criteria to the EC-IBD prospectively assembled, uniformly diagnosed European population-based inception cohort of Inflammatory Bowel Disease (IBD) patients diagnosed between 1991 and 1993. Methods: 426 CD patients from 13 European participating centers (10 countries) were included at the time of diagnosis (first flare, naive patients, no maintenance treatment, no steroids). We used the EPACT definition of the severe active luminal CD, agreed upon by the panel experts (acute flare, hospitalized patient, without documented fistula or stenosis and who did not undergo surgery for abscess drainage or a fistulectomy). The various treatments were analyzed to determine the appropriateness of the medical decision, according to the EPACT criteria. Results: 84 (20%) patients met the inclusion criteria. Considering at least one appropriate (A) treatment as appropriate: 60 patients (71%) received an appropriate treatment, 24 patients (29%) an inappropriate treatment (I). Furthermore, in 87% of the cases with one appropriate treatment an additional mostly inappropriate treatment was added or continued. Detailed results are indicated in the table below. Conclusion: In the EC-IBD cohort, the treatment for severe active luminal CD was appropriate for more than 70% of the patients, but frequently an inappropriate treatment was continued or added, thus increasing the risk of adverse reactions, drugs interactions and costs.
Resumo:
The main consideration for base construction under the pavement, in the design of Iowa's interstate, was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristics of the base was apparently not given adequate consideration. On jointed portland cement concrete pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material), further resulting in faulting between individual slabs. The objective of this evaluation is to determine if longitudinal subdrains are effective in preventing or reducing pumping, faulting and related deterioration. Results suggest that, based upon the flow from the outlets observed during periodic checks and evidence of water flow at the outlets, it appears that to date the subdrains are effective in draining the subbase and subgrade. Because of the limited data available at this time, however, the pavement condition and faulting results are inconclusive.
Resumo:
PURPOSE: To describe the use of anterior segment optical coherence tomography (AS-OCT) to clarify the position and patency of aqueous shunt devices in the anterior chamber of eyes where corneal edema or tube position does not permit a satisfactory view. DESIGN: Noncomparative observational case series. METHODS: Four cases are reported in which aqueous shunt malposition or obstruction was suspected but the shunt could not be seen on clinical examination. The patients underwent AS-OCT to identify the position and patency of the shunt tip. RESULTS: In each case, AS-OCT provided data regarding tube position and/or patency that could not be obtained by slit-lamp examination or by gonioscopy that influenced management. CONCLUSIONS: AS-OCT can be used to visualize anterior chamber tubes in the presence of corneal edema that precludes an adequate view or in cases where the tube is retracted into the cornea. In such cases, AS-OCT is useful in identifying shunt patency and position, which helps guide clinical decision making.
Resumo:
Osteochondritis dissecans (OCD) is a joint disorder that affects the articular cartilage and subchondral bone, most commonly at the knee. OCD of the sacroiliac joint is extremely rare. Management of OCD remains controversial, and surgery is often needed, especially when conservative treatment fails. We present a rare case of OCD involving the left sacroiliac joint successfully treated by percutaneous computed tomography-guided retrograde drilling and debridement.
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite". It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert.
Resumo:
The objectives of this research were to develop a low cost fly ash-sand stabilized roadway and to correlate field performance with pavement design assumptions on a county road heavily trafficked by trucks hauling grain. The road was constructed during the summer of 1984. Three test sections comprised of different base thicknesses were incorporated in the roadway and were tested for compressive stength, structural rating, and rut depth. Annual crack surveys showed no appreciable difference in transverse cracking between the test sections and little to no rutting. The sandbase drainage characteristics beneath the roadway may have contributed to the satisfactory performance of the test sections. This project indicates that in spite of the inflated cost of construction due to the research nature of the work, a fly ash-sand base can be a viable alternative for roadway stabilization.
Resumo:
A study of hydrochemical characteristics of the Arbúcies river (a seminatural mediterranean basin) has been undertaken during 1991. Mean solute yield for each ion has been determined using the correlation curves between discharge and concentration, and the flow duration curve. The hydrochemical budget of the Arbúcies drainage basin shows that the basin is a net source for al1 the elements. The cationic denudation rate obtained in this granitic basin is 5.24 keqhalyear. This high rate is due to the intensive chemical weathering of the granodionte, that delivers an important amount of cations which will release to be transported. The results demostrate clearly the strength of lithological control on stream loads, particulary on the dissolved component.