884 resultados para Newspaper publishing


Relevância:

10.00% 10.00%

Publicador:

Resumo:

An Australian manufacturer has recently developed an innovative group of cold-formed steel hollow flange sections, one of them is LiteSteel Beams (LSBs). The LSB sections are produced from thin and high strength steels by a patented manufacturing process involving simultaneous cold-forming and dual electric resistance welding. They have a unique geometry consisting of rectangular hollow flanges and a relatively slender web. The LSB flexural members are subjected to lateral distortional buckling effects and hence their capacities are reduced for intermediate spans. The current design rules for lateral distortional buckling were developed based on the lower bound of numerical and experimental results. The effect of LSB section geometry was not considered although it could influence the lateral distortional buckling performance. Therefore an accurate finite element model of LSB flexural members was developed and validated using experimental and finite strip analysis results. It was then used to investigate the effect of LSB geometry. The extensive moment capacity data thus developed was used to develop improved design rules for LSBs with one of them considering the LSB geometry effects through a modified slenderness parameter. The use of the new design rules gave higher lateral distortional buckling capacities for LSB sections with intermediate slenderness. The new design rule is also able to accurately predict the lateral distortional buckling moment capacities of other hollow flange beams (HFBs).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study explores full-time workers' understanding of and assumptions about part-time work against six job quality components identified in recent literature. Forty interviews were conducted with employees in a public sector agency in Australia, a study context where part-time work is ostensibly 'good quality' and is typically long term, voluntary, involving secure contracts (i.e. permanent rather than casual) and having predictable hours distributed evenly over the week and year. Despite strong collective bargaining arrangements as well as substantial legal and industrial obligations, the findings revealed some serious concerns for part-time job quality. These concerns included reduced responsibilities and lesser access to high status roles and projects, a lack of access to promotion opportunities, increased work intensity and poor workplace support. The highly gendered, part-time labour market also means that it is women who disproportionately experience this disadvantage. To foster equity, greater attention needs to focus on monitoring and enhancing job quality, regardless of hours worked.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite the numerous observations that dynamic capabilities lie at the source of competitive advantage, we still have limited knowledge as to how access to firm-based resources and changes to these affect the development of dynamic capabilities. In this paper, we examine founder human capital, access to employee human capital, access to technological expertise, access to other specific expertise, and access to two types of tangible resources in a sample of new firms in Sweden. We empirically measure four dynamic capabilities and find that the nature and effect of resources employed in the development of these capabilities vary greatly. For the most part, there are positive effects stemming from access to particular resources. However, for some resources, such as access to employee human capital and access to financial capital, unexpected negative effects also appear. This study therefore provides statistical evidence as to the varying role of resources in capability development. Importantly, we also find that changes in resource bases have more influential roles in the development of dynamic capabilities than the resource stock variables that were measured at an earlier stage of firm development. This provides empirical support for the notion of treating the firm as a dynamic flow of resources as opposed to a static stock. This finding also highlights the importance of longitudinal designs in studies of dynamic capability development. Further recommendations for future empirical studies of dynamic capabilities are presented.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Universities are increasingly encouraged to take a leading role in economic development, particularly through innovation. Simultaneously, economic development policy itself is increasingly focused on small and medium-sized enterprises (SMEs), creating overlapping interactions in the roles of government policy, universities and SMEs and the processes of innovation creation and dissemination. This paper examines issues arising from these developments and relating to the key stakeholders (industry, government and universities in particular), the enabling mechanisms (network governance, relevant education, training and learning, and suitable structures), and local and cross-local links. The authors then use quantitative analysis of 450 SMEs in the UK to begin to evaluate the roles of universities and highlight areas for further theoretical development.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Experience plays an important role in building management. “How often will this asset need repair?” or “How much time is this repair going to take?” are types of questions that project and facility managers face daily in planning activities. Failure or success in developing good schedules, budgets and other project management tasks depend on the project manager's ability to obtain reliable information to be able to answer these types of questions. Young practitioners tend to rely on information that is based on regional averages and provided by publishing companies. This is in contrast to experienced project managers who tend to rely heavily on personal experience. Another aspect of building management is that many practitioners are seeking to improve available scheduling algorithms, estimating spreadsheets and other project management tools. Such “micro-scale” levels of research are important in providing the required tools for the project manager's tasks. However, even with such tools, low quality input information will produce inaccurate schedules and budgets as output. Thus, it is also important to have a broad approach to research at a more “macro-scale.” Recent trends show that the Architectural, Engineering, Construction (AEC) industry is experiencing explosive growth in its capabilities to generate and collect data. There is a great deal of valuable knowledge that can be obtained from the appropriate use of this data and therefore the need has arisen to analyse this increasing amount of available data. Data Mining can be applied as a powerful tool to extract relevant and useful information from this sea of data. Knowledge Discovery in Databases (KDD) and Data Mining (DM) are tools that allow identification of valid, useful, and previously unknown patterns so large amounts of project data may be analysed. These technologies combine techniques from machine learning, artificial intelligence, pattern recognition, statistics, databases, and visualization to automatically extract concepts, interrelationships, and patterns of interest from large databases. The project involves the development of a prototype tool to support facility managers, building owners and designers. This final report presents the AIMMTM prototype system and documents how and what data mining techniques can be applied, the results of their application and the benefits gained from the system. The AIMMTM system is capable of searching for useful patterns of knowledge and correlations within the existing building maintenance data to support decision making about future maintenance operations. The application of the AIMMTM prototype system on building models and their maintenance data (supplied by industry partners) utilises various data mining algorithms and the maintenance data is analysed using interactive visual tools. The application of the AIMMTM prototype system to help in improving maintenance management and building life cycle includes: (i) data preparation and cleaning, (ii) integrating meaningful domain attributes, (iii) performing extensive data mining experiments in which visual analysis (using stacked histograms), classification and clustering techniques, associative rule mining algorithm such as “Apriori” and (iv) filtering and refining data mining results, including the potential implications of these results for improving maintenance management. Maintenance data of a variety of asset types were selected for demonstration with the aim of discovering meaningful patterns to assist facility managers in strategic planning and provide a knowledge base to help shape future requirements and design briefing. Utilising the prototype system developed here, positive and interesting results regarding patterns and structures of data have been obtained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This chapter traces the development of the global digital storytelling movement from its origins in California to its adoption by the BBC in the UK and its subsequent dispersal around the world. It identifies the foundational practices, uneven development and diffusion, and emergent practices internationally.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the lead article for an issue of M/C Journal on the theme ‘obsolete.’ It uses the history of the International Journal of Cultural Studies (of which the author has been editor since 1997) to investigate technological innovations and their scholarly implications in academic journal publishing; in particular the obsolescence of the print form. Print-based elements like cover-design, the running order of articles, special issues, refereeing and the reading experience are all rendered obsolete with the growth of online access to individual articles. The paper argues that individuation of reading choices may be accompanied by less welcome tendencies, such as a decline in collegiality, disciplinary innovation, and trust.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This chapter investigates one instance of ‘morality-in-action’, which transpires when children describe their troubles to the adult counsellors at Kids Help Line, an Australian national helpline that deals specifically with callers aged approximately 5-18 years. We focus, in particular, on how a young female caller who has forged a medical certificate in relation to a problem with school attendance, determines both what to report, and how this should be disclosed. Throughout the call, the moral implications of the troubles talk are delicately managed by both caller and counsellor. The call takes the form of an extended story (Labov & Waletzky, 1997) that includes a preface (‘I have some problems at school’), an orientation (“I was sick, went to the doctor, stayed home”), a complicating action (“I went back to school and photocopied my certificate from last time”), result (“I got caught”) and evaluation (“I don’t know why it happened”). As the account unfolds, we observe how both the student and counsellor seek to make sense of these actions. While this account is partly about deception, both the caller and counsellor delicately sidestep naming this action, precluding this implication. For example, the counsellor lets stand the caller’s main assessment of the trouble. He simply asks, “so what happened then,” when the caller reports that her forgery was discovered. The caller, from the very beginning of the call, seeks to find out why she could have done this, “you see I don’t know why it happened”. As the call unfolds, the counsellor follows the opening provided by the caller and they put forward motives for consideration. By agreeing that the motives are to be explored, the act takes on a character other than deception.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Objective: The present study sought to identify the work destinations of graduates and ascertain their perceived preparedness for practice from a regional occupational therapy program, which had been specifically developed to support the health requirements of northern Australians by having an emphasis on rural practice. ---------- Design: Self-report questionnaires and semistructured in-depth telephone interviews. ---------- Participants: Graduates (n = 15) from the first cohort of occupational therapists from James Cook University, Queensland. ---------- Main outcome measure: The study enabled comparisons to be made between rural and urban based occupational therapists, while the semistructured interviews provided a deeper understanding of participants' experiences regarding their preparation for practice. ---------- Results: Demographic differences were noted between occupational therapists working in rural and urban settings. Rural therapists were predominantly younger and had worked in slightly more positions than their urban counterparts. The study also offered some insights into the value that therapists placed on the subjects taught during their undergraduate occupational therapy training, and had highlighted the differences in perceptions between therapists with rural experience and those with urban experience regarding the subjects that best prepared them for practice. Generally, rural therapists reported that all subjects included in the curriculum had equipped them well for practice. ---------- Conclusions: Findings suggest the need to undertake further research to determine the actual nature of rural practice, the personal characteristics of rural graduates and the experiences of students while on rural clinical placements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Experience plays an important role in building management. “How often will this asset need repair?” or “How much time is this repair going to take?” are types of questions that project and facility managers face daily in planning activities. Failure or success in developing good schedules, budgets and other project management tasks depend on the project manager's ability to obtain reliable information to be able to answer these types of questions. Young practitioners tend to rely on information that is based on regional averages and provided by publishing companies. This is in contrast to experienced project managers who tend to rely heavily on personal experience. Another aspect of building management is that many practitioners are seeking to improve available scheduling algorithms, estimating spreadsheets and other project management tools. Such “micro-scale” levels of research are important in providing the required tools for the project manager's tasks. However, even with such tools, low quality input information will produce inaccurate schedules and budgets as output. Thus, it is also important to have a broad approach to research at a more “macro-scale.” Recent trends show that the Architectural, Engineering, Construction (AEC) industry is experiencing explosive growth in its capabilities to generate and collect data. There is a great deal of valuable knowledge that can be obtained from the appropriate use of this data and therefore the need has arisen to analyse this increasing amount of available data. Data Mining can be applied as a powerful tool to extract relevant and useful information from this sea of data. Knowledge Discovery in Databases (KDD) and Data Mining (DM) are tools that allow identification of valid, useful, and previously unknown patterns so large amounts of project data may be analysed. These technologies combine techniques from machine learning, artificial intelligence, pattern recognition, statistics, databases, and visualization to automatically extract concepts, interrelationships, and patterns of interest from large databases. The project involves the development of a prototype tool to support facility managers, building owners and designers. This Industry focused report presents the AIMMTM prototype system and documents how and what data mining techniques can be applied, the results of their application and the benefits gained from the system. The AIMMTM system is capable of searching for useful patterns of knowledge and correlations within the existing building maintenance data to support decision making about future maintenance operations. The application of the AIMMTM prototype system on building models and their maintenance data (supplied by industry partners) utilises various data mining algorithms and the maintenance data is analysed using interactive visual tools. The application of the AIMMTM prototype system to help in improving maintenance management and building life cycle includes: (i) data preparation and cleaning, (ii) integrating meaningful domain attributes, (iii) performing extensive data mining experiments in which visual analysis (using stacked histograms), classification and clustering techniques, associative rule mining algorithm such as “Apriori” and (iv) filtering and refining data mining results, including the potential implications of these results for improving maintenance management. Maintenance data of a variety of asset types were selected for demonstration with the aim of discovering meaningful patterns to assist facility managers in strategic planning and provide a knowledge base to help shape future requirements and design briefing. Utilising the prototype system developed here, positive and interesting results regarding patterns and structures of data have been obtained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A complete change of career forces a seismic shift in every aspect of your life. From day one, you have to face the loss of long held beliefs, behaviours, the known world of self, and security. We came from professions that themselves are poles apart, and many of the challenges we faced entering the profession were the same: juggling full-time work, part time study, and family commitmemts, taking a pay cut, and loss of social life. But over a short period of time we both transitioned to our new profession successfully. so what make our successful transition possible?

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is much still to learn about how young children’s membership with peers shapes their constructions of moral and social obligations within everyday activities in the school playground. This paper investigates how a small group of girls, aged four to six years, account for their everyday social interactions in the playground. They were video-recorded as they participated in a pretend game of school. Several days later, a video-recorded excerpt of the interaction was shown to them and invited to comment on what was happening in the video. This conversation was audio-recorded. Drawing on a conversation analysis approach, this chapter shows that, despite their discontent and complaining about playing the game of school, the girls’ actions showed their continued orientation to the particular codes of the game, of ‘no going away’ and ‘no telling’. By making relevant these codes, jointly constructed by the girls during the interview, they managed each other’s continued participation within two arenas of action: the pretend, as a player in a pretend game of school; and the real, as a classroom member of a peer group. Through inferences to explicit and implicit codes of conduct, moral obligations were invoked as the girls attempted to socially exclude or build alliances with others, and enforce their own social position. As well, a shared history that the girls re-constructed has moral implications for present and future relationships. The girls oriented to the history as an interactional resource for accounting for their actions in the pretend game. This paper uncovers how children both participate in, and shape, their everyday social worlds through talk and interaction and the consequences a taken-for-granted activity such as playing school has for their moral and social positions in the peer group.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

While teacher education equips beginning teachers with critical knowledge and skills about teaching and fosters an understanding of learning in and from teaching some of the most critical elements of teaching are only learned in the workplace when beginning teachers commence their professional teaching careers. This transition to professional practice may be facilitated by mentoring from a more experienced teacher. Expert mentoring assists beginning teachers to build their teaching capacities more quickly and also lays the foundation for innovative professional practice. However, the presence of a mentor alone is not sufficient with the success of mentoring reliant on the skills and knowledge of mentors. Mentoring relationships are most effective when mentors are trained for their roles. While mentor preparation is the single most important factor in contributing to mentoring success, few teachers receive formal training to prepare them adequately for mentoring roles. The purpose of this paper is to report on the implementation of a mentoring development program designed to build mentoring capacities in experienced teachers. The program was trialled in a school in rural Australia. A range of qualitative data was collected from participants over the duration of the mentoring program and follow up data collected six months subsequent to the conclusion of the program.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Study Process Questionnaire (Biggs, 1987) has been widely used in studies investigating learning behaviours in tertiary education. Many of the studies that have used the instrument have investigated the construct validity of the SPQ using a variety of factor analytic methods and techniques in an atheoretical way. Contrary to this method, Burnett and Dart (1997) argued that the hypothesised structure of a scale should be used when assessing the construct validity of an existing instrument. This study investigated the factor structure of the SPQ using a theoretical approach and found strong support for the three approaches to learning structure of the instrument.