994 resultados para Mississippi River plume
Resumo:
The objective of this monitoring project was to determine the baseline condition for a 960-m long stream reach and its associated streamside zone, which terminates at the confluence with the Deschutes River. This stream reach had been damaged heavily in the February 1996 flood and had also received many years of overuse by livestock grazing. The monitoring project was conducted in July 1997 just after installation of riparian exclosure fencing. Future resurvey of the study area will allow determination of progress made in ecological recovery.
Resumo:
A study of possible causes for extensive mortality of oysters in the Upper Chesapeake Bay was taken on by year-round monitoring of conditions during a two-year period.