825 resultados para Enrico Fermi Atomic Power Plant (Mich.)
Resumo:
Work done in the Power Sources Division, U.S. Army Signal Research and Development Laboratory, Fort Monmouth, New Jersey.
Resumo:
"November 1956"--Page [i] of cover.
Resumo:
Emanuel Celler, chairman.
Resumo:
"February, 1968."
Resumo:
"May 1, 1962."
Resumo:
SRIA-65, Reactor technology.
Resumo:
"TID-3089 Reactors-Power."
Resumo:
"Contract No. AT(40-1)-2589."
Resumo:
"Prepared under contract with the United States Atomic Energy Commission, GNEC/AEC contract AT-(40-I)-2674 and PRWRA/AEC contract AT-(40-I)-2672."
Resumo:
This annotated bibliography contains 148 selected references on the uses of radioactive and stable isotopes in animal husbandry and in studies of fertilizer uptake by plants, plant physiology, photosynthesis, and entomology. These references were selected from scientific journals published during the period 1957-1958. Subject and author indexes and a list of the periodicals from which the references were selected are included.
Resumo:
"TID-3078(Suppl. 1). Biology and Medicine, TID-4500 (31st edition)."
Resumo:
"TID-3313."
Resumo:
"This report was prepared at the request of the United States Atomic energy commission by Messrs. Harry I. Miller ... and F. Douglas Campbell."
Resumo:
"December 28, 1962."
Resumo:
Includes bibliographical references.