930 resultados para Colby administration


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This catalog describes paintings by the author, completed as his Senior Scholar Project in art and exhibited in the Colby College Art Museum. Images of the paintings are not available.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was designed to demonstrate the visibility of potential future wind turbines built on the Colby campus. We conducted viewshed analyses in ArcGIS on three different potential turbine sites to determine the visibility of the turbines within a 10km radius. We found that the Runnals hill turbine would be visible to the largest area and the largest number of residents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Outdoor lighting is an essential component for nighttime safety on college campuses. Outdoor lighting on Colby College campus is not uniform, leaving some areas with minimal light. The purpose of this project is to analytically evaluate if and where major walkways on Colby College have inadequate lighting. While we were unable to define inadequate lighting, we found that most paths on campus do appear to be well lit, while in general open spaces on campus have the lowest light levels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the recent construction of Colby Green and the current plans for the construction of several new buildings, the total area for future development on campus has declined. The goal of this study was to illustrate existing campus development and to determine where future growth could occur. GIS was used in determining the different soil systems on campus, the current use of the land, and the boundaries of the Colby property. The project shows what potential obstacles the college will have in attempting to expand the campus and proposes where the best options are for construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Millions of unconscious calculations are made daily by pedestrians walking through the Colby College campus. I used ArcGIS to make a predictive spatial model that chose paths similar to those that are actually used by people on a regular basis. To make a viable model of how most travelers choose their way, I considered both the distance required and the type of traveling surface. I used an iterative process to develop a scheme for weighting travel costs which resulted in accurate least-cost paths to be predicted by ArcMap. The accuracy was confirmed when the calculated routes were compared to satellite photography and were found to overlap well-worn “shortcuts” taken between the paved paths throughout campus.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

I created an updated map of trails at Colby College using global positioning system data that were then edited in ArcGIS. The map background, obtained from the Maine Office of GIS, was created from digital orthophotographs produced from aerial photos collected over southwest Maine in Spring 2003. Trail difficulty was determined by creating a slope layer and taking other factors into consideration such as ground surface and path width. The map will eventually be available online, enabling interactive selection of trails where users can access additional trail information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Roads, parking lots, buildings, and other impervious surfaces do not allow rainwater to infiltrate the ground. As a result, they can lead to an increase in runoff to nearby ditches and streams, as well as a greater influx of pollutants such as motor oil that can often be found on paved surfaces. For this project, GIS was used to find the total area covered by impervious surfaces on the Colby campus, and to show how this area has grown in the past 40 years. It was found that new development on the campus has lead to a 56% increase in impervious surfaces at Colby since 1965.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the recent construction of Colby Green and the current plans for the construction of several new buildings, the total area for future development on campus has declined. The goal of this study was to illustrate existing campus development and to determine where future growth could occur. GIS was used to in determining the different soil systems on campus, the current use of the land, and the boundaries of the Colby property. The project shows what potential obstacles the college will have in attempting to expand the campus and proposes where the best options are for construction are.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This map is designed as a resource for students and the public to use and develop a better understanding of the trails system on the Colby Campus. I used a Garmin GPSmap 60CS to chart all the trails on Runnals Hill and in the Arboretum. Then, using ArcGIS, I compiled the tracked trails and laid them over an aerial photo of the campus. Because many of the trails are hard to find, I took digital photos of each trail entry to help the user locate them. Then, by taking note of the grade and width of the trail, I decided which trails were suitable for certain activities. This gives users an idea of where to go for walking, running, mountain biking, cross-country skiing, and snowshoeing.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador: