697 resultados para rosin sizing


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Estruturas

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Global Network for the Molecular Surveillance of Tuberculosis 2010: A. Miranda (Tuberculosis Laboratory of the National Institute of Health, Porto, Portugal)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The value of integrating a heat storage into a geothermal district heating system has been investigated. The behaviour of the system under a novel operational strategy has been simulated focusing on the energetic, economic and environmental effects of the new strategy of incorporation of the heat storage within the system. A typical geothermal district heating system consists of several production wells, a system of pipelines for the transportation of the hot water to end-users, one or more re-injection wells and peak-up devices (usually fossil-fuel boilers). Traditionally in these systems, the production wells change their production rate throughout the day according to heat demand, and if their maximum capacity is exceeded the peak-up devices are used to meet the balance of the heat demand. In this study, it is proposed to maintain a constant geothermal production and add heat storage into the network. Subsequently, hot water will be stored when heat demand is lower than the production and the stored hot water will be released into the system to cover the peak demands (or part of these). It is not intended to totally phase-out the peak-up devices, but to decrease their use, as these will often be installed anyway for back-up purposes. Both the integration of a heat storage in such a system as well as the novel operational strategy are the main novelties of this thesis. A robust algorithm for the sizing of these systems has been developed. The main inputs are the geothermal production data, the heat demand data throughout one year or more and the topology of the installation. The outputs are the sizing of the whole system, including the necessary number of production wells, the size of the heat storage and the dimensions of the pipelines amongst others. The results provide several useful insights into the initial design considerations for these systems, emphasizing particularly the importance of heat losses. Simulations are carried out for three different cases of sizing of the installation (small, medium and large) to examine the influence of system scale. In the second phase of work, two algorithms are developed which study in detail the operation of the installation throughout a random day and a whole year, respectively. The first algorithm can be a potentially powerful tool for the operators of the installation, who can know a priori how to operate the installation on a random day given the heat demand. The second algorithm is used to obtain the amount of electricity used by the pumps as well as the amount of fuel used by the peak-up boilers over a whole year. These comprise the main operational costs of the installation and are among the main inputs of the third part of the study. In the third part of the study, an integrated energetic, economic and environmental analysis of the studied installation is carried out together with a comparison with the traditional case. The results show that by implementing heat storage under the novel operational strategy, heat is generated more cheaply as all the financial indices improve, more geothermal energy is utilised and less fuel is used in the peak-up boilers, with subsequent environmental benefits, when compared to the traditional case. Furthermore, it is shown that the most attractive case of sizing is the large one, although the addition of the heat storage most greatly impacts the medium case of sizing. In other words, the geothermal component of the installation should be sized as large as possible. This analysis indicates that the proposed solution is beneficial from energetic, economic, and environmental perspectives. Therefore, it can be stated that the aim of this study is achieved in its full potential. Furthermore, the new models for the sizing, operation and economic/energetic/environmental analyses of these kind of systems can be used with few adaptations for real cases, making the practical applicability of this study evident. Having this study as a starting point, further work could include the integration of these systems with end-user demands, further analysis of component parts of the installation (such as the heat exchangers) and the integration of a heat pump to maximise utilisation of geothermal energy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A presente dissertação centra-se no estudo das implicações originadas, ao nível das soluções construtivas presentes na envolvente dos edifícios de habitação, pelas recentes alterações efetuadas ao Regulamento de Desempenho Energético de Edifícios de Habitação (REH). Com o intuito de aferir o desempenho energético, através da aplicação do REH, considerou-se como caso de estudo um edifício de habitação novo, unifamiliar com tipologia T3, localizado a cerca de 10 metros acima do nível médio das águas do mar e na periferia da zona urbana de Vila Nova de Gaia. Após o levantamento das necessidades energéticas do edifício em estudo, realizaram-se diversas simulações, com o intuito de identificar e quantificar as alterações provocadas pela entrada em vigor da Portaria 379-A/2015, de 22 de outubro. Inicialmente estudou-se o comportamento térmico da habitação unifamiliar admitindo diferentes soluções construtivas: as soluções que cumpriam com as exigências em vigor até ao final de 2015 e as que cumprem as imposições atuais. Desta forma tentou perceber-se quais as implicações dessas alterações nas necessidades energéticas da habitação. Em seguida, e utilizando o mesmo conceito da simulação inicial, fez-se um estudo considerando que a fração se situava nas diferentes zonas climáticas existentes em Portugal. Para que tal fosse possível, teve que se considerar a implantação da habitação em diferentes localizações geográficas e a diferentes altitudes. Também se procurou avaliar a importância que as pontes térmicas planas assumem nas transferências de calor, nas duas estações. Assim, foi necessário fazer um pré- dimensionamento da solução estrutural adotada, quantificar a área destes elementos e o respetivo coeficiente de transmissão. Quantificou-se, posteriormente, quais as necessidades energéticas obtidas com a solução estrutural perfeitamente definida e as que se obteriam se se desprezasse a sua existência. Com as análises comparativas dos diferentes resultados obtidos, verificou-se que as atualizações das exigências regulamentares a que os edifícios de habitação estão sujeitos originam grande impacto nos sistemas construtivos adotados.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The rural electrification is characterized by geographical dispersion of the population, low consumption, high investment by consumers and high cost. Moreover, solar radiation constitutes an inexhaustible source of energy and in its conversion into electricity photovoltaic panels are used. In this study, equations were adjusted to field conditions presented by the manufacturer for current and power of small photovoltaic systems. The mathematical analysis was performed on the photovoltaic rural system I- 100 from ISOFOTON, with power 300 Wp, located at the Experimental Farm Lageado of FCA/UNESP. For the development of such equations, the circuitry of photovoltaic cells has been studied to apply iterative numerical methods for the determination of electrical parameters and possible errors in the appropriate equations in the literature to reality. Therefore, a simulation of a photovoltaic panel was proposed through mathematical equations that were adjusted according to the data of local radiation. The results have presented equations that provide real answers to the user and may assist in the design of these systems, once calculated that the maximum power limit ensures a supply of energy generated. This real sizing helps establishing the possible applications of solar energy to the rural producer and informing the real possibilities of generating electricity from the sun.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The dielectric porcelain is usually obtained by mixing various raw materials proportions and is used in the production of electronic equipment for various applications, from capacitors of high and low Power to insulators for low, medium, high and extra high voltage, which are used in distribution lines and transmission of electricity.This work was directed to the s tudy of technological properties of technic porcelain, made from raw materials extracted from pegmatites found in the regions of Seridó and the Alto Oeste of Rio Grande do Norte, which are made of kaolin, quartz and feldspar, abundant and high quality in these regions. The technic ceramics were obtained by mixing in appropriate levels, kaolin, feldspar, quartz and clay, the last item from a pottery in the city of Sao Gonçalo do Amarante, Rio Grande do Norte. During the development the following characterizations correlated to raw materials were made: laser particle sizing, x-ray diffraction, DTA and TG. The compositions studied were formed by uniaxial pressing at a pressure of 50 MPa and sintered at temperatures ranging from 1150 to 1350ºC and levels (times) of sintering between 30, 60, 90 and 120 minutes. The characterization of the samples were taken from the analysis of weight loss, linear shrinkage, porosity, stoneware curve, bulk density, flexural strength of three points, SEM and X-ray diffraction, TMA, Dielectric and cross Resistivity. The studied materials can be employed in producing the objects used in electrical engineering such as: insulators for low, medium and high-voltage electrical systems, command devices, bushing insulation for transformers, power capacitors, spark plugs, receptacles for fluorescent and incandescent light bulbs and others

Relevância:

10.00% 10.00%

Publicador:

Resumo:

OBJECTIVES AND STUDY METHOD: There are two subjects in this thesis: “Lot production size for a parallel machine scheduling problem with auxiliary equipment” and “Bus holding for a simulated traffic network”. Although these two themes seem unrelated, the main idea is the optimization of complex systems. The “Lot production size for a parallel machine scheduling problem with auxiliary equipment” deals with a manufacturing setting where sets of pieces form finished products. The aim is to maximize the profit of the finished products. Each piece may be processed in more than one mold. Molds must be mounted on machines with their corresponding installation setup times. The key point of our methodology is to solve the single period lot-sizing decisions for the finished products together with the piece-mold and the mold-machine assignments, relaxing the constraint that a single mold may not be used in two machines at the same time. For the “Bus holding for a simulated traffic network” we deal with One of the most annoying problems in urban bus operations is bus bunching, which happens when two or more buses arrive at a stop nose to tail. Bus bunching reflects an unreliable service that affects transit operations by increasing passenger-waiting times. This work proposes a linear mathematical programming model that establishes bus holding times at certain stops along a transit corridor to avoid bus bunching. Our approach needs real-time input, so we simulate a transit corridor and apply our mathematical model to the data generated. Thus, the inherent variability of a transit system is considered by the simulation, while the optimization model takes into account the key variables and constraints of the bus operation. CONTRIBUTIONS AND CONCLUSIONS: For the “Lot production size for a parallel machine scheduling problem with auxiliary equipment” the relaxation we propose able to find solutions more efficiently, moreover our experimental results show that most of the solutions verify that molds are non-overlapping even if they are installed on several machines. We propose an exact integer linear programming, a Relax&Fix heuristic, and a multistart greedy algorithm to solve this problem. Experimental results on instances based on real-world data show the efficiency of our approaches. The mathematical model and the algorithm for the lot production size problem, showed in this research, can be used for production planners to help in the scheduling of the manufacturing. For the “Bus holding for a simulated traffic network” most of the literature considers quadratic models that minimize passenger-waiting times, but they are harder to solve and therefore difficult to operate by real-time systems. On the other hand, our methodology reduces passenger-waiting times efficiently given our linear programming model, with the characteristic of applying control intervals just every 5 minutes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work deals with teacher-student relationship (TSR), held in a very special moment: the semester of graduation of architecture and urbanism, where students prepare the final work called Graduation Final Work (GFW). That is the last stage to obtain the title of architect and urban planner in Brazil. The text discusses this problem in several ways, emphasing the relationship between graduated student and his/her mentors into the consolidation process of the student as an actor of the planning process, here defined as "autonomy". The work is focused on understanding the TSR in order to elucidate its importance for improvement of teaching bases on development of the GFW, more than the relation between curriculum and institution. Related with the exploratory characteristic of this master thesis, methodologically, the field work happened through: (i) observation of mentorship guidance, (ii) interviews, and (iii) application of questionnaires to teachers and students. Participated 10 pairs of student and mentors of two federal university of Northeast: 05 pairs of the Federal University of Ceará (UFC) and 05 pairs of the Federal University of Rio Grande do Norte (UFRN). The results presented the development of the GFW as a difficult process / fearful for students, highlighting the main problem situations: the difficulty in choosing the theme, the super-sizing of the process, students' insecurities, and parental relationship with the supervisor process. Summing up, the work indicates that the students has a limited autonomy on the GFW process, which calls for a revision in order to promote the consolidation of the student autonomy, which must be observed for some positions recognition of the role of each actor in the process of orientation

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We study networks of nonlocally coupled electronic oscillators that can be described approximately by a Kuramoto-like model. The experimental networks show long complex transients from random initial conditions on the route to network synchronization. The transients display complex behaviors, including resurgence of chimera states, which are network dynamics where order and disorder coexists. The spatial domain of the chimera state moves around the network and alternates with desynchronized dynamics. The fast time scale of our oscillators (on the order of 100ns) allows us to study the scaling of the transient time of large networks of more than a hundred nodes, which has not yet been confirmed previously in an experiment and could potentially be important in many natural networks. We find that the average transient time increases exponentially with the network size and can be modeled as a Poisson process in experiment and simulation. This exponential scaling is a result of a synchronization rate that follows a power law of the phase-space volume.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Holothurian populations are under pressure worldwide because of increasing demand for beche-de-mer, mainly for Asian consumption. Importations to this area from new temperate fishing grounds provide economic opportunities but also raise concerns regarding future over-exploitation. Studies on the habitat preferences and movements of sea cucumbers are important for the management of sea cucumber stocks and sizing of no-take zones, but information on the ecology and behavior of temperate sea cucumbers is scarce. This study describes the small-scale distribution and movement patterns of Holothuria arguinensis in the intertidal zone of the Ria Formosa national park (Portugal).Mark/recapture studieswere performed to record theirmovements over time on different habitats (sand and seagrass). H. arguinensis preferred seagrass habitats and did not show a size or life stage-related spatial segregation. Its density was 563 ind. ha−1 and mean movement speed was 10 m per day. Movement speed did not differ between habitats and the direction of movement was offshore during the day and shoreward during the night. Median home range size was 35 m2 and overlap among home ranges was 84%. H. arguinensis' high abundance, close association with seagrass and easy catchability in the intertidal zone, indicate the importance of including intertidal lagoons in future studies on temperate sea cucumber ecology since those systems might require different management strategies than fully submerged habitats.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Two trends are emerging from modern electric power systems: the growth of renewable (e.g., solar and wind) generation, and the integration of information technologies and advanced power electronics. The former introduces large, rapid, and random fluctuations in power supply, demand, frequency, and voltage, which become a major challenge for real-time operation of power systems. The latter creates a tremendous number of controllable intelligent endpoints such as smart buildings and appliances, electric vehicles, energy storage devices, and power electronic devices that can sense, compute, communicate, and actuate. Most of these endpoints are distributed on the load side of power systems, in contrast to traditional control resources such as centralized bulk generators. This thesis focuses on controlling power systems in real time, using these load side resources. Specifically, it studies two problems.

(1) Distributed load-side frequency control: We establish a mathematical framework to design distributed frequency control algorithms for flexible electric loads. In this framework, we formulate a category of optimization problems, called optimal load control (OLC), to incorporate the goals of frequency control, such as balancing power supply and demand, restoring frequency to its nominal value, restoring inter-area power flows, etc., in a way that minimizes total disutility for the loads to participate in frequency control by deviating from their nominal power usage. By exploiting distributed algorithms to solve OLC and analyzing convergence of these algorithms, we design distributed load-side controllers and prove stability of closed-loop power systems governed by these controllers. This general framework is adapted and applied to different types of power systems described by different models, or to achieve different levels of control goals under different operation scenarios. We first consider a dynamically coherent power system which can be equivalently modeled with a single synchronous machine. We then extend our framework to a multi-machine power network, where we consider primary and secondary frequency controls, linear and nonlinear power flow models, and the interactions between generator dynamics and load control.

(2) Two-timescale voltage control: The voltage of a power distribution system must be maintained closely around its nominal value in real time, even in the presence of highly volatile power supply or demand. For this purpose, we jointly control two types of reactive power sources: a capacitor operating at a slow timescale, and a power electronic device, such as a smart inverter or a D-STATCOM, operating at a fast timescale. Their control actions are solved from optimal power flow problems at two timescales. Specifically, the slow-timescale problem is a chance-constrained optimization, which minimizes power loss and regulates the voltage at the current time instant while limiting the probability of future voltage violations due to stochastic changes in power supply or demand. This control framework forms the basis of an optimal sizing problem, which determines the installation capacities of the control devices by minimizing the sum of power loss and capital cost. We develop computationally efficient heuristics to solve the optimal sizing problem and implement real-time control. Numerical experiments show that the proposed sizing and control schemes significantly improve the reliability of voltage control with a moderate increase in cost.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Combinatorial optimization is a complex engineering subject. Although formulation often depends on the nature of problems that differs from their setup, design, constraints, and implications, establishing a unifying framework is essential. This dissertation investigates the unique features of three important optimization problems that can span from small-scale design automation to large-scale power system planning: (1) Feeder remote terminal unit (FRTU) planning strategy by considering the cybersecurity of secondary distribution network in electrical distribution grid, (2) physical-level synthesis for microfluidic lab-on-a-chip, and (3) discrete gate sizing in very-large-scale integration (VLSI) circuit. First, an optimization technique by cross entropy is proposed to handle FRTU deployment in primary network considering cybersecurity of secondary distribution network. While it is constrained by monetary budget on the number of deployed FRTUs, the proposed algorithm identi?es pivotal locations of a distribution feeder to install the FRTUs in different time horizons. Then, multi-scale optimization techniques are proposed for digital micro?uidic lab-on-a-chip physical level synthesis. The proposed techniques handle the variation-aware lab-on-a-chip placement and routing co-design while satisfying all constraints, and considering contamination and defect. Last, the first fully polynomial time approximation scheme (FPTAS) is proposed for the delay driven discrete gate sizing problem, which explores the theoretical view since the existing works are heuristics with no performance guarantee. The intellectual contribution of the proposed methods establishes a novel paradigm bridging the gaps between professional communities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Modern electric machine drives, particularly three phase permanent magnet machine drive systems represent an indispensable part of high power density products. Such products include; hybrid electric vehicles, large propulsion systems, and automation products. Reliability and cost of these products are directly related to the reliability and cost of these systems. The compatibility of the electric machine and its drive system for optimal cost and operation has been a large challenge in industrial applications. The main objective of this dissertation is to find a design and control scheme for the best compromise between the reliability and optimality of the electric machine-drive system. The effort presented here is motivated by the need to find new techniques to connect the design and control of electric machines and drive systems. A highly accurate and computationally efficient modeling process was developed to monitor the magnetic, thermal, and electrical aspects of the electric machine in its operational environments. The modeling process was also utilized in the design process in form finite element based optimization process. It was also used in hardware in the loop finite element based optimization process. The modeling process was later employed in the design of a very accurate and highly efficient physics-based customized observers that are required for the fault diagnosis as well the sensorless rotor position estimation. Two test setups with different ratings and topologies were numerically and experimentally tested to verify the effectiveness of the proposed techniques. The modeling process was also employed in the real-time demagnetization control of the machine. Various real-time scenarios were successfully verified. It was shown that this process gives the potential to optimally redefine the assumptions in sizing the permanent magnets of the machine and DC bus voltage of the drive for the worst operating conditions. The mathematical development and stability criteria of the physics-based modeling of the machine, design optimization, and the physics-based fault diagnosis and the physics-based sensorless technique are described in detail. To investigate the performance of the developed design test-bed, software and hardware setups were constructed first. Several topologies of the permanent magnet machine were optimized inside the optimization test-bed. To investigate the performance of the developed sensorless control, a test-bed including a 0.25 (kW) surface mounted permanent magnet synchronous machine example was created. The verification of the proposed technique in a range from medium to very low speed, effectively show the intelligent design capability of the proposed system. Additionally, to investigate the performance of the developed fault diagnosis system, a test-bed including a 0.8 (kW) surface mounted permanent magnet synchronous machine example with trapezoidal back electromotive force was created. The results verify the use of the proposed technique under dynamic eccentricity, DC bus voltage variations, and harmonic loading condition make the system an ideal case for propulsion systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The rapid growth of virtualized data centers and cloud hosting services is making the management of physical resources such as CPU, memory, and I/O bandwidth in data center servers increasingly important. Server management now involves dealing with multiple dissimilar applications with varying Service-Level-Agreements (SLAs) and multiple resource dimensions. The multiplicity and diversity of resources and applications are rendering administrative tasks more complex and challenging. This thesis aimed to develop a framework and techniques that would help substantially reduce data center management complexity. We specifically addressed two crucial data center operations. First, we precisely estimated capacity requirements of client virtual machines (VMs) while renting server space in cloud environment. Second, we proposed a systematic process to efficiently allocate physical resources to hosted VMs in a data center. To realize these dual objectives, accurately capturing the effects of resource allocations on application performance is vital. The benefits of accurate application performance modeling are multifold. Cloud users can size their VMs appropriately and pay only for the resources that they need; service providers can also offer a new charging model based on the VMs performance instead of their configured sizes. As a result, clients will pay exactly for the performance they are actually experiencing; on the other hand, administrators will be able to maximize their total revenue by utilizing application performance models and SLAs. This thesis made the following contributions. First, we identified resource control parameters crucial for distributing physical resources and characterizing contention for virtualized applications in a shared hosting environment. Second, we explored several modeling techniques and confirmed the suitability of two machine learning tools, Artificial Neural Network and Support Vector Machine, to accurately model the performance of virtualized applications. Moreover, we suggested and evaluated modeling optimizations necessary to improve prediction accuracy when using these modeling tools. Third, we presented an approach to optimal VM sizing by employing the performance models we created. Finally, we proposed a revenue-driven resource allocation algorithm which maximizes the SLA-generated revenue for a data center.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Los residuos sólidos como consecuencia directa de las actividades humanas, han representado un reto desde sus inicios, de ahí se empezaron a desarrollar técnicas y prácticas para garantizar una adecuada gestión de los residuos, nuestros primeros ancestros encontraron en los botaderos a cielo abierto la solución más fácil para disponer los desechos de animales y residuos de comida en sitios cercanos a sus viviendas, por ejemplo, los griegos poseen registros de la inauguración del primer relleno municipal en la ciudad de Atenas hace más de 2000 años. La evolución de las culturas, la revolución industrial y el crecimiento poblacional acelerado han modificado no solo la composición sino también la cantidad de los residuos sólidos producidos, haciendo cada día más difícil su adecuada gestión debido a su alto grado de toxicidad, la ausencia de materiales biodegradables y su volumen, traduciendo esto en un gran impacto. El panorama no es muy alentador y los pronósticos emitidos por el Banco Mundial prevén que para el año 2025 los niveles mundiales de residuos sólidos urbanos alcanzaran 2,2 millones de toneladas por año. Basada en el interés por la adecuada gestión de los residuos y la disminución del impacto ambiental de las empresas Coraseo S.A y Seacor S.A, la presente investigación busca seleccionar la metodología y/o tecnología más apropiada teniendo en cuenta las condiciones económicas, logísticas y de infraestructura de la empresa y la comunidad involucrada. En primera instancia se estudió en profundidad el panorama empresarial y posteriormente se seleccionó un grupo de cuatro propuestas para la transformación y aprovechamiento de los residuos sólidos que fueron evaluadas a nivel económico, normativo, medio ambiental. Los datos analizados sugieren entre otras cosas, un robustecimiento del marco legal ambiental colombiano y mundial, una mayor colaboración económica de los organismos internacionales y las entidades bancarias y finalmente una reducción en los costos de las tecnologías disponibles para el aprovechamiento de los residuos sólidos, haría posible el sueño de las sociedades de gestionar efectivamente los residuos sólidos generando el menor impacto ambiental posible y en el caso del grupo empresarial Cordobés lograr innovar y emprender con un proyecto eco eficiente como el que se evaluó.