977 resultados para diode pumping
Resumo:
The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system
Resumo:
The present work presents an algorithm proposal, which aims for controlling and improving idle time to be applied in oil production wells equipped with beam pump. The algorithm was totally designed based on existing papers and data acquired from two Potiguar Basin pilot wells. Oil engineering concepts such as submergence, pump off, Basic Sediments and Water (BSW), Inflow Performance Relationship (IPR), reservo ir pressure, inflow pressure, among others, were included into the algorithm through a mathematical treatment developed from a typical well and then extended to the general cases. The optimization will increase the well production potential maximum utilization having the smallest number of pumping unit cycles directly reflecting on operational cost and electricity consumption reduction
Resumo:
The pumping of fluids in pipelines is the most economic and safe form of transporting fluids. That explains why in Europe there was in 1999 about 30.000 Km [7] of pipelines of several diameters, transporting millíons of cubic meters of crude oil end refined products, belonging to COCAWE (assaciation of companies of petroleum of Europe for health, environment and safety, that joint several petroleum companies). In Brazil they are about 18.000 Km of pipelines transporting millions of cubic meters of liquids and gases. In 1999, nine accidents were registered to COCAWE. Among those accidents one brought a fatal victim. The oil loss was of 171 m3, equivalent to O,2 parts per million of the total of the transported volume. Same considering the facts mentioned the costs involved in ao accident can be high. An accident of great proportions can bríng loss of human lives, severe environmental darnages, loss of drained product, loss . for dismissed profit and damages to the image of the company high recovery cost. In consonance with that and in some cases for legal demands, the companies are, more and more, investing in systems of Leak detection in pipelines based on computer algorithm that operate in real time, seeking wíth that to minimize still more the drained volumes. This decreases the impacts at the environment and the costs. In general way, all the systems based on softWare present some type of false alarm. In general a commitment exists betWeen the sensibílity of the system and the number of false alarms. This work has as objective make a review of thé existent methods and to concentrate in the analysis of a specific system, that is, the system based on hydraulic noise, Pressure Point Analyzis (PPA). We will show which are the most important aspects that must be considered in the implementation of a Leak Detection System (LDS), from the initial phase of the analysis of risks passing by the project bases, design, choice of the necessary field instrumentation to several LDS, implementation and tests. We Will make na analysis of events (noises) originating from the flow system that can be generator of false alarms and we will present a computer algorithm that restricts those noises automatically
Resumo:
The precision and the fast identification of abnormalities of bottom hole are essential to prevent damage and increase production in the oil industry. This work presents a study about a new automatic approach to the detection and the classification of operation mode in the Sucker-rod Pumping through dynamometric cards of bottom hole. The main idea is the recognition of the well production status through the image processing of the bottom s hole dynamometric card (Boundary Descriptors) and statistics and similarity mathematics tools, like Fourier Descriptor, Principal Components Analysis (PCA) and Euclidean Distance. In order to validate the proposal, the Sucker-Rod Pumping system real data are used
Resumo:
A remoção de plantas aquáticas tem sido utilizada como opção ao controle químico e biológico, em razão de restrições ambientais em algumas regiões brasileiras. O objetivo deste trabalho foi desenvolver um modelo para análise econômica e operacional da remoção mecânica de plantas aquáticas, visando realizar estudo econômico comparativo com o controle químico. A operação foi estudada num reservatório de uma usina de bombeamento em Barra do Piraí-RJ. O sistema consiste de retroescavadeiras instaladas em balsas, usadas para cortar as plantas e liberá-las no fluxo de água. Antes da tomada d'água existe uma barreira flutuante que intercepta as plantas, as quais são removidas por um guindaste fixo nas margens. As plantas são armazenadas por algum tempo e depois descartadas. Existe, ainda, um sistema de limpeza das grades da tomada d'água. Dados do volume total de plantas descartadas foram coletados durante 14 meses, assim como foi avaliado o volume de biomassa produzido por área das principais espécies infestantes. A empreiteira que administra o serviço forneceu planilhas de custos e outro parâmetros operacionais. Um modelo foi desenvolvido para calcular custos por hectare de plantas removidas. Os resultados mostraram custo médio mensal de US$ 17.780,28 por hectare. Apesar do alto custo, o sistema de remoção demonstrou capacidade de controlar apenas 4,1% da área infestada no reservatório, na época da coleta dos dados. Simulando dados de uma aplicação de glyphosate, o controle químico custaria apenas 0,23% do custo da remoção. Análises de sensibilidade mostraram que a compactação das plantas para transporte, o volume de plantas produzidas por área e o custo do transporte são os parâmetros principais para a otimização.
Resumo:
The method of artificial lift of progressing cavity pump is very efficient in the production of oils with high viscosity and oils that carry a great amount of sand. This characteristic converted this lift method into the second most useful one in oil fields production. As it grows the number of its applications it also increases the necessity to dominate its work in a way to define it the best operational set point. To contribute to the knowledge of the operational method of artificial lift of progressing cavity pump, this work intends to develop a computational simulator for oil wells equipped with an artificial lift system. The computational simulator of the system will be able to represent its dynamic behavior when submitted to the various operational conditions. The system was divided into five subsystems: induction motor, multiphase flows into production tubing, rod string, progressing cavity pump and annular tubing-casing. The modeling and simulation of each subsystem permitted to evaluate the dynamic characteristics that defined the criteria connections. With the connections of the subsystems it was possible to obtain the dynamic characteristics of the most important arrays belonging to the system, such as: pressure discharge, pressure intake, pumping rate, rod string rotation and torque applied to polish string. The shown results added to a friendly graphical interface converted the PCP simulator in a great potential tool with a didactic characteristic in serving the technical capability for the system operators and also permitting the production engineering to achieve a more detail analysis of the dynamic operational oil wells equipped with the progressing cavity pump
Resumo:
This work proposes a computer simulator for sucker rod pumped vertical wells. The simulator is able to represent the dynamic behavior of the systems and the computation of several important parameters, allowing the easy visualization of several pertinent phenomena. The use of the simulator allows the execution of several tests at lower costs and shorter times, than real wells experiments. The simulation uses a model based on the dynamic behavior of the rod string. This dynamic model is represented by a second order partial differencial equation. Through this model, several common field situations can be verified. Moreover, the simulation includes 3D animations, facilitating the physical understanding of the process, due to a better visual interpretation of the phenomena. Another important characteristic is the emulation of the main sensors used in sucker rod pumping automation. The emulation of the sensors is implemented through a microcontrolled interface between the simulator and the industrial controllers. By means of this interface, the controllers interpret the simulator as a real well. A "fault module" was included in the simulator. This module incorporates the six more important faults found in sucker rod pumping. Therefore, the analysis and verification of these problems through the simulator, allows the user to identify such situations that otherwise could be observed only in the field. The simulation of these faults receives a different treatment due to the different boundary conditions imposed to the numeric solution of the problem. Possible applications of the simulator are: the design and analysis of wells, training of technicians and engineers, execution of tests in controllers and supervisory systems, and validation of control algorithms
Resumo:
This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model
Resumo:
The pumping through progressing cavities system has been more and more employed in the petroleum industry. This occurs because of its capacity of elevation of highly viscous oils or fluids with great concentration of sand or other solid particles. A Progressing Cavity Pump (PCP) consists, basically, of a rotor - a metallic device similar to an eccentric screw, and a stator - a steel tube internally covered by a double helix, which may be rigid or deformable/elastomeric. In general, it is submitted to a combination of well pressure with the pressure generated by the pumping process itself. In elastomeric PCPs, this combined effort compresses the stator and generates, or enlarges, the clearance existing between the rotor and the stator, thus reducing the closing effect between their cavities. Such opening of the sealing region produces what is known as fluid slip or slippage, reducing the efficiency of the PCP pumping system. Therefore, this research aims to develop a transient three-dimensional computational model that, based on single-lobe PCP kinematics, is able to simulate the fluid-structure interaction that occurs in the interior of metallic and elastomeric PCPs. The main goal is to evaluate the dynamic characteristics of PCP s efficiency based on detailed and instantaneous information of velocity, pressure and deformation fields in their interior. To reach these goals (development and use of the model), it was also necessary the development of a methodology for generation of dynamic, mobile and deformable, computational meshes representing fluid and structural regions of a PCP. This additional intermediary step has been characterized as the biggest challenge for the elaboration and running of the computational model due to the complex kinematic and critical geometry of this type of pump (different helix angles between rotor and stator as well as large length scale aspect ratios). The processes of dynamic generation of meshes and of simultaneous evaluation of the deformations suffered by the elastomer are fulfilled through subroutines written in Fortan 90 language that dynamically interact with the CFX/ANSYS fluid dynamic software. Since a structural elastic linear model is employed to evaluate elastomer deformations, it is not necessary to use any CAE package for structural analysis. However, an initial proposal for dynamic simulation using hyperelastic models through ANSYS software is also presented in this research. Validation of the results produced with the present methodology (mesh generation, flow simulation in metallic PCPs and simulation of fluid-structure interaction in elastomeric PCPs) is obtained through comparison with experimental results reported by the literature. It is expected that the development and application of such a computational model may provide better details of the dynamics of the flow within metallic and elastomeric PCPs, so that better control systems may be implemented in the artificial elevation area by PCP
Resumo:
The progressing cavity pumping (PCP) is one of the most applied oil lift methods nowadays in oil extraction due to its ability to pump heavy and high gas fraction flows. The computational modeling of PCPs appears as a tool to help experiments with the pump and therefore, obtain precisely the pump operational variables, contributing to pump s project and field operation otimization in the respectively situation. A computational model for multiphase flow inside a metallic stator PCP which consider the relative motion between rotor and stator was developed in the present work. In such model, the gas-liquid bubbly flow pattern was considered, which is a very common situation in practice. The Eulerian-Eulerian approach, considering the homogeneous and inhomogeneous models, was employed and gas was treated taking into account an ideal gas state. The effects of the different gas volume fractions in pump volumetric eficiency, pressure distribution, power, slippage flow rate and volumetric flow rate were analyzed. The results shown that the developed model is capable of reproducing pump dynamic behaviour under the multiphase flow conditions early performed in experimental works
Resumo:
Due to the increasing need to promote the use of resources that support the environment and the clean industry, the science has developed in the area of natural resource use as well as enhanced use of the renewable energy sources. Considering also the great need for clean water and wide availability of salt or brackish water, added to the great solar energy potential in northeastern of the Brazil, it was developed a solar distiller whose main difference is its system of pre-solar heating also. From experimental adjustments, the system was developed by the use of a cylindrical solar concentrator coupled to a conventional distiller. The system is designed such that attempt to facilitate the process termination trap to ensure constant movement of the fluid mass and thus enable higher temperatures to the system and thus fetch a higher amount of distillate collected. In a stage of the experiment were used a forced circulation to try to further increase the amount of energy exchange system. To develop the study were set up four settings for comparison in which one was only distiller simple as basic parameter, the second proposed configuration were with the coupling of the concentration triggered manually every 30 minutes to monitor the sun, the third configuration occurred with automatic triggering of a timer, and the fourth configuration was also used a pumping system that tried to improve the circulation of the fluid. With the comparative analysis of the results showed a gain in the amount of distillate system, especially in the forced model
Resumo:
After the Protocol of Kyoto and of the ECHO 92 - Rio de Janeiro, the attentions of the world focus to the preservation of the environment and of the maintainable use of the natural resources. People were looking for preserving environment for the future generations. Ever since, solutions are looked for the supply of energy in its more acquaintances forms and the substitution of the use of fossil fuels for the such alternative forms as: Photovoltaics, solar heat systems for water, wind , bio-diesel, etc. and in this context the Company of Engineering of the State of Bahia - Cerb changed a diesel pumping system by an wind one, It´s the first community system of this nature in Bahia. Facing problems with the model, a Cerb involved the academic segment of the Federal Center of Technological Education of Bahia Cefetba looking for a solution. This work intends to demonstrate the possibilities of optimization of the pumping communit system that supply water to approximately 50 people in the place of Romão, municipal district of São Gabriel-Ba. Technical reports were published in AGRENERGD2004-Unicamp SP and Scientific Magazine ETC,Cefetba, 2005. A simulation of the increase of energy is presented for heights of 15 and 20m, considering the eletromecanical balance from the pumping energy to the wind turbine. From the accomplished bibliographical revision, we emphasized the mechanical aspects of the engineering once in UFRN, those studies concentrate on the Department of Mechanical Engineering while, in others eletroelectronic are more emphasized. Finally, documents that we judged important were enclosed for the perfect understanding of this work
Resumo:
The flow assurance has become one of the topics of greatest interest in the oil industry, mainly due to production and transportation of oil in regions with extreme temperature and pressure. In these operations the wax deposition is a commonly problem in flow of paraffinic oils, causing the rising costs of the process, due to increased energy cost of pumping, decreased production, increased pressure on the line and risk of blockage of the pipeline. In order to describe the behavior of the wax deposition phenomena in turbulent flow of paraffinic oils, under different operations conditions, in this work we developed a simulator with easy interface. For that we divided de work in four steps: (i) properties estimation (physical, thermals, of transport and thermodynamics) of n-alkanes and paraffinic mixtures by using correlations; (ii) obtainment of the solubility curve and determination the wax appearance temperature, by calculating the solid-liquid equilibrium of parafinnic systems; (iii) modelling wax deposition process, comprising momentum, mass and heat transfer; (iv) development of graphic interface in MATLAB® environment for to allow the understanding of simulation in different flow conditions as well as understand the matter of the variables (inlet temperature, external temperature, wax appearance temperature, oil composition, and time) on the behavior of the deposition process. The results showed that the simulator developed, called DepoSim, is able to calculate the profile of temperature, thickness of the deposit, and the amount of wax deposited in a simple and fast way, and also with consistent results and applicable to the operation
Resumo:
The simulation of SES-Natal Ponta Negra: mitigation of environmental risks and predictive maintenance strategy was developed in the context of several operational irregularities in the pumping stations and sewage systems in the system Ponta Negra. Thus, the environmental risks and complaints against the company due to overflows of sewage into the public thoroughfare became common. This neighborhood has shown in recent years an increase of resident higher than the initial expectation of growth. In this sense presumed the large population growth and generation of sewers higher than expected, associated to the use of corrective maintenance and misuse of the system may be the main causes of operational failures occurring in the SES. This study aimed at analyzing the hydraulic behavior of SES Ponta Negrathrough numerical simulation of its operation associated to future scenarios of occupation. The SES Ponta Negra has a long lengthof collection networks and 6 pumping stations interconnected, being EE 1, 2, 4 coastal way, and beach Shopping interconnected EE3 to receives all sewers pumped from the rest pumping station and pumped to the sewage treatment station of neighborhood which consists of a facultative pond followed by three maturation ponds with disposal of treated effluent into infiltration ditches. Oncethey are connected with each other, the study was conducted considering the days and times of higher inflow for all lifts. Furthermore, with the aim of measuring the gatherer network failures were conducted data survey of on the networks. Thephysical and operational survey data was conducted between January/2011 and janeiro/2012. The simulation of the SES was developed with the aim ofdemonstrating its functioning, eithercurrently and in the coming years, based in population estimates and sewage flow. The collected data represents the current framework of the pumping stations of the SES Ponta Negra and served as input to the model developed in MS Excel ® spreadsheet which allowed simulating the behavior of SES in future scenarios. The results of this study show thatBeach Shopping Pumping Station is actually undersized and presents serious functioning problemsthatmay compromise the environmental quality of surrounding area. The other pumping stations of the system will reach itsmaximum capacity between 2013 and 2015, although the EE1 and EE3 demonstrateoperation capacity, even precariously, until 2017. Moreover, it was observed that the misuse of the network system, due to the input of both garbage and stormwater, are major factors of failures that occur in the SES. Finally, it was found that the corrective maintenance appliance, rather than predictive,has proven to beinefficient because of the serious failuresin the system, causing damage to the environment and health risks to users
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)