762 resultados para complementarity in reputation building
Resumo:
Taipei City has put a significant effort toward the implementation of green design and green building schemes towards a sustainable eco-city. Although some of the environmental indicators have not indicated significant progress in environmental improvement, implementing the two schemes has obtained considerable results; therefore, the two schemes are on the right path towards promoting a sustainable eco-city. However, it has to be admitted that the two schemes are a rather “technocratic” set of solutions and eco-centric approach. It is suggested that not only the public sector but also the private sector need to put more effort toward implement the schemes, and the government needs to encourage the private sector to adopt the schemes in practice.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.
Resumo:
The People's Republic of China and its 1.3 billion people have experienced a rapid economic growth in the past two decades. China's urbanisation ratio rose from around 20% in the early 1980s to 45% in 2007 [China Urban Research Committee. Green building. Beijing: Chinese Construction Industrial Publish House; 2008. ISBN 978-7-112-09925-2.]. The large volume and rapid speed of building construction rarely have been seen in global development and cause substantial pressure on resources and the environment. Government policy makers and building professionals, including architects, building engineers, project managers and property developers, should play an important role in enhancing the planning, design, construction, operation and maintenance of the building energy efficiency process in forming the sustainable urban development. This paper addresses the emerging issues relating to building energy consumption and building energy efficiency due to the fast urbanisation development in China.
Resumo:
Multi-agent systems have been adopted to build intelligent environment in recent years. It was claimed that energy efficiency and occupants' comfort were the most important factors for evaluating the performance of modem work environment, and multi-agent systems presented a viable solution to handling the complexity of dynamic building environment. While previous research has made significant advance in some aspects, the proposed systems or models were often not applicable in a "shared environment". This paper introduces an ongoing project on multi-agent for building control, which aims to achieve both energy efficiency and occupants' comfort in a shared environment.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.