981 resultados para Spain--History--711-1516--Early works to 1800
Resumo:
"The work ... has been prepared ... with the aid of Mr. I. R. Barbour ... we have ... profited by the article on silk in Dr. Ures ... dictionary of arts and sciences, Mr. Bliss's report on silk ... to the legislature of Ohio, Mr. Colman's report to the Massachusetts legislature, &c.; while we have quoted entire The silk manual of ... Mr. Blydenburgh." Advertisement, p. [3]
Resumo:
Includes index.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Bound with Woodbridge, W.C. A system of universal geography. Hartford 1835.
Resumo:
The difficulty of dealing with construction and demolition waste (CDW) on construction sites is not new and continues to be a significant environmental problem. Currently the CDW collection system in Spain is done in a decentralized manner by each sub-contracted company, being necessary to implement effective waste management measures ensuring a correct management and minimization. During the last years several measures have been launched in order to improve and encourage the reuse and recycling of CDW. A widespread solution for CDW recovery is using them as a landscaping aggregate or for road bases and sub-bases. However, measures encouraging onsite prevention still need to be enhanced. This paper studies the major work stage generating CDW and analyses the categories of CDW produced during its execution. For this, several real building sites have been analysed in order to quantify the estimation of CDW generated. Results of this study show that a significant contributor to the CDW generation on building construction sites in Spain are the masonry works. Finally, a Best Practices Manual (BPM) is proposed containing several strategies on masonry works aimed not only at CDW prevention, but also at improving their management and minimization. The use of this BPM together with the Study and Plan of CDW management --required by law--, promotes the environmental management of the company, favouring the cohesion of the construction process organization at all stages giving rise to establishing responsibilities in the field of waste and providing a greater control over the process. Keywords: construction and demolition waste, management, masonry works, good practice measures, prevention.
Resumo:
The episcopal complex of Eio, located in El Tolmo de Minateda, was built between the end of the 6th century and the beginning of the 7th century, possibly as a political decision taken by the ecclesiastical authority in the capital of the Visigothic kingdom (Toletum). With the comprehensive study of the whole complex presented below (construction cycles, furniture, decoration and location of spaces), we can interpret the function of each space in the basilica and the domus episcopi, the liturgical and general movement routes, the existence of some hierarchical environments, and specify the chronological development of the buildings. After the Arab-Berber conquest of Hispania in the early 8th century, the whole complex will experience a series of transformations that will convert the religious and monumental public area into a private, residential and industrial Islamic quarter.
Resumo:
Includes reprints of original title-pages.
Resumo:
Each vol. has also special title-page.
Resumo:
Shaw & Shoemaker