970 resultados para Memory Retrieval
Resumo:
The capability to automatically identify shapes, objects and materials from the image content through direct and indirect methodologies has enabled the development of several civil engineering related applications that assist in the design, construction and maintenance of construction projects. Examples include surface cracks detection, assessment of fire-damaged mortar, fatigue evaluation of asphalt mixes, aggregate shape measurements, velocimentry, vehicles detection, pore size distribution in geotextiles, damage detection and others. This capability is a product of the technological breakthroughs in the area of Image and Video Processing that has allowed for the development of a large number of digital imaging applications in all industries ranging from the well established medical diagnostic tools (magnetic resonance imaging, spectroscopy and nuclear medical imaging) to image searching mechanisms (image matching, content based image retrieval). Content based image retrieval techniques can also assist in the automated recognition of materials in construction site images and thus enable the development of reliable methods for image classification and retrieval. The amount of original imaging information produced yearly in the construction industry during the last decade has experienced a tremendous growth. Digital cameras and image databases are gradually replacing traditional photography while owners demand complete site photograph logs and engineers store thousands of images for each project to use in a number of construction management tasks. However, construction companies tend to store images without following any standardized indexing protocols, thus making the manual searching and retrieval a tedious and time-consuming effort. Alternatively, material and object identification techniques can be used for the development of automated, content based, construction site image retrieval methodology. These methods can utilize automatic material or object based indexing to remove the user from the time-consuming and tedious manual classification process. In this paper, a novel material identification methodology is presented. This method utilizes content based image retrieval concepts to match known material samples with material clusters within the image content. The results demonstrate the suitability of this methodology for construction site image retrieval purposes and reveal the capability of existing image processing technologies to accurately identify a wealth of materials from construction site images.
Resumo:
The amount of original imaging information produced yearly during the last decade has experienced a tremendous growth in all industries due to the technological breakthroughs in digital imaging and electronic storage capabilities. This trend is affecting the construction industry as well, where digital cameras and image databases are gradually replacing traditional photography. Owners demand complete site photograph logs and engineers store thousands of images for each project to use in a number of construction management tasks like monitoring an activity's progress and keeping evidence of the "as built" in case any disputes arise. So far, retrieval methodologies are done manually with the user being responsible for imaging classification according to specific rules that serve a limited number of construction management tasks. New methods that, with the guidance of the user, can automatically classify and retrieve construction site images are being developed and promise to remove the heavy burden of manually indexing images. In this paper, both the existing methods and a novel image retrieval method developed by the authors for the classification and retrieval of construction site images are described and compared. Specifically a number of examples are deployed in order to present their advantages and limitations. The results from this comparison demonstrates that the content based image retrieval method developed by the authors can reduce the overall time spent for the classification and retrieval of construction images while providing the user with the flexibility to retrieve images according different classification schemes.
Resumo:
Among several others, the on-site inspection process is mainly concerned with finding the right design and specifications information needed to inspect each newly constructed segment or element. While inspecting steel erection, for example, inspectors need to locate the right drawings for each member and the corresponding specifications sections that describe the allowable deviations in placement among others. These information seeking tasks are highly monotonous, time consuming and often erroneous, due to the high similarity of drawings and constructed elements and the abundance of information involved which can confuse the inspector. To address this problem, this paper presents the first steps of research that is investigating the requirements of an automated computer vision-based approach to automatically identify “as-built” information and use it to retrieve “as-designed” project information for field construction, inspection, and maintenance tasks. Under this approach, a visual pattern recognition model was developed that aims to allow automatic identification of construction entities and materials visible in the camera’s field of view at a given time and location, and automatic retrieval of relevant design and specifications information.
Resumo:
Digital photographs of construction site activities are gradually replacing their traditional paper based counterparts. Existing digital imaging technologies in hardware and software make it easy for site engineers to take numerous photographs of “interesting” processes and activities on a daily basis. The resulting photographic data are evidence of the “as-built” project, and can therefore be used in a number of project life cycle tasks. However, the task of retrieving the relevant photographs needed in these tasks is often burdened by the sheer volume of photographs accumulating in project databases over time and the numerous objects present in each photograph. To solve this problem, the writers have recently developed a number of complementary techniques that can automatically classify and retrieve construction site images according to a variety of criteria (materials, time, date, location, etc.). This paper presents a novel complementary technique that can automatically identify linear (i.e., beam, column) and nonlinear (i.e., wall, slab) construction objects within the image content and use that information to enhance the performance of the writers’ existing construction site image retrieval approach.
Resumo:
Among several others, the on-site inspection process is mainly concerned with finding the right design and specifications information needed to inspect each newly constructed segment or element. While inspecting steel erection, for example, inspectors need to locate the right drawings for each member and the corresponding specifications sections that describe the allowable deviations in placement among others. These information seeking tasks are highly monotonous, time consuming and often erroneous, due to the high similarity of drawings and constructed elements and the abundance of information involved which can confuse the inspector. To address this problem, this paper presents the first steps of research that is investigating the requirements of an automated computer vision-based approach to automatically identify “as-built” information and use it to retrieve “as-designed” project information for field construction, inspection, and maintenance tasks. Under this approach, a visual pattern recognition model was developed that aims to allow automatic identification of construction entities and materials visible in the camera’s field of view at a given time and location, and automatic retrieval of relevant design and specifications information.
Resumo:
The technological advancements in digital imaging, the widespread popularity of digital cameras, and the increasing demand by owners and contractors for detailed and complete site photograph logs have triggered an ever-increasing growth in the rate of construction image data collection, with thousands of images being stored for each project. However, the sheer volume of images and the difficulties in accurately and manually indexing them have generated a pressing need for methods that can index and retrieve images with minimal or no user intervention. This paper reports recent developments from research efforts in the indexing and retrieval of construction site images in architecture, engineering, construction, and facilities management image database systems. The limitations and benefits of the existing methodologies will be presented, as well as an explanation of the reasons for the development of a novel image retrieval approach that not only can recognize construction materials within the image content in order to index images, but also can be compatible with existing retrieval methods, enabling enhanced results.
Resumo:
Active vibration control (AVC) is a relatively new technology for the mitigation of annoying human-induced vibrations in floors. However, recent technological developments have demonstrated its great potential application in this field. Despite this, when a floor is found to have problematic floor vibrations after construction the unfamiliar technology of AVC is usually avoided in favour of more common techniques, such as Tuned Mass Dampers (TMDs) which have a proven track record of successful application, particularly for footbridges and staircases. This study aims to investigate the advantages and disadvantages that AVC has, when compared with TMDs, for the application of mitigation of pedestrian-induced floor vibrations in offices. Simulations are performed using the results from a finite element model of a typical office layout that has a high vibration response level. The vibration problems on this floor are then alleviated through the use of both AVC and TMDs and the results of each mitigation configuration compared. The results of this study will enable a more informed decision to be made by building owners and structural engineers regarding suitable technologies for reducing floor vibrations.
Resumo:
Carbon nanotube (CNT) based nano electromechanical system (NEMS) were developed to apply to the logic and the memory circuit. The electrical 'on-off' behavior induced by the mechanical movements of CNTs can promise low power consumption in circuit with very low level leakage current. Additionally, the unique vertical structure of nanotubes allows high integration density for devices. © 2012 IEEE.
Resumo:
In the modern and dynamic construction environment it is important to access information in a fast and efficient manner in order to improve the decision making processes for construction managers. This capability is, in most cases, straightforward with today’s technologies for data types with an inherent structure that resides primarily on established database structures like estimating and scheduling software. However, previous research has demonstrated that a significant percentage of construction data is stored in semi-structured or unstructured data formats (text, images, etc.) and that manually locating and identifying such data is a very hard and time-consuming task. This paper focuses on construction site image data and presents a novel image retrieval model that interfaces with established construction data management structures. This model is designed to retrieve images from related objects in project models or construction databases using location, date, and material information (extracted from the image content with pattern recognition techniques).
Resumo:
It is commonly believed that visual short-term memory (VSTM) consists of a fixed number of "slots" in which items can be stored. An alternative theory in which memory resource is a continuous quantity distributed over all items seems to be refuted by the appearance of guessing in human responses. Here, we introduce a model in which resource is not only continuous but also variable across items and trials, causing random fluctuations in encoding precision. We tested this model against previous models using two VSTM paradigms and two feature dimensions. Our model accurately accounts for all aspects of the data, including apparent guessing, and outperforms slot models in formal model comparison. At the neural level, variability in precision might correspond to variability in neural population gain and doubly stochastic stimulus representation. Our results suggest that VSTM resource is continuous and variable rather than discrete and fixed and might explain why subjective experience of VSTM is not all or none.
Resumo:
Band alignment of resistive random access memory (RRAM) switching material Ta2O5 and different metal electrode materials was examined using high-resolution X-ray photoelectron spectroscopy. Schottky and hole barrier heights at the interface between electrode and Ta2O 5 were obtained, where the electrodes consist of materials with low to high work function (Φ m, v a c from 4.06 to 5.93 eV). Effective metal work functions were extracted to study the Fermi level pinning effect and to discuss the dominant conduction mechanism. An accurate band alignment between electrodes and Ta2O5 is obtained and can be used for RRAM electrode engineering and conduction mechanism study. © 2013 American Institute of Physics.