979 resultados para Mekong River Commission
Resumo:
This is the River Yealm Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Yealm catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Yealm salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. The main objective of the River Yealm SAP is to maintain, improve and develop the River Yealm salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support.
Resumo:
This is the River Yealm Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Yealm Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Yealm Salmon Action Plan follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel, Fowey and Plym. It is the final one of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Yealm SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably there are potable water abstractions in the headwaters, workings for china clay on the main tributary, two inert waste landfill sites and an aggregate quarry adjacent to the main river and inputs from several Sewage Treatment Works (STW) and two industrial estates. The main River Yealm has been designated as River Ecosystem Class 1 for its water quality objectives. This is the highest water quality target set for rivers.
Resumo:
This is the River Axe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Axe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. This document is part of a national initiative to produce action plans for the management of all the main salmon rivers of England and Wales by 2003. The aim of this plan is (i) to assess the status of the salmon stocks and fisheries of the River Axe - including the use of Conservation Limits as part of this process, (ii) to identify factors which may be limiting stock and fishery performance and (iii) to propose remedial measures address these factors. The salmon stock of the River Axe was apparently in a healthy state in the 1950s, supporting net and rod fisheries with average annual catches of around 100 and 50 fish respectively. Catches declined through the 1970s and 1980s to the extent where no salmon were recorded in the late 1980s and early 1990s. This decline was probably due largely to the effects of agricultural pollution, which virtually extinguished the salmon stock of the River Axe. Water quality has subsequently improved, but has deteriorated again in recent years.
Resumo:
This is the River Axe Salmon Action Plan Final document produced by the Environment Agency in 2004. The River Axe Salmon Action Plan (SAP) has been produced after consideration of feedback from public consultation. The final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the salmon stock of the River Axe. Efforts have been made to identify possible sources of funding, partners and timescales. It indicates how the plan will be managed, including the process for reviewing stock status, issues, actions and progress. Low marine survival is currently a major factor limiting salmon stocks throughout the United Kingdom. However, on the River Axe the freshwater environment is still the main factor limiting the recovery of the salmon stock. Most of the adults returning to the Axe at present are probably derived from hatchery reared smolts, although there has been some natural reproduction in recent years. Juvenile populations in the Yarty indicate that this is a tributary where salmon have started to re-establish a self-sustaining population. Actions to improve the quality of the freshwater environment, both in terms of water quality and sedimentation, are seen as the top priorities, and are required to allow the Axe to support a self-sustaining salmon population.
Resumo:
This is the River Dart Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Dart Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The north of the River Dart catchment is included in the Dartmoor candidate Special Area of Conservation (cSAC), designated under the Council EC Directive 92/43/EEC, the “Habitats Directive”. One of the conservation objectives for the cSAC is to maintain the habitat for Atlantic Salmon, Salmo Salar in favourable condition. The River Dart is an important salmon, sea trout and brown trout fishery with no significant coarse fishery. However, eels are ubiquitous throughout the catchment and are lightly exploited. The River Dart SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Dart Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Dart catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Dart salmon stock. The low marine survival (likely to be below 10%) is possibly to be the main cause for the River Dart salmon stock non-compliance with its conservation limit. Actions protecting smolts and maximising spawning activity of returning adults are seen as priorities to contribute to mitigate the low marine survival. Also the lack of information on salmon stock and its habitat is recognised as one main factor limiting the better management of salmon fisheries. Efforts will be focused on gaining more knowledge and improving modelling techniques. The actions presented in this document are perceived as those required to address the important issues and factors limiting the salmon stock. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Dart salmon stock and fisheries.
Resumo:
This is the River Exe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Exe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Exe SAP follows the format of those completed for the Rivers Teign, Torridge, Taw and Dart. It is the fifth of eight action plans that will be produced for salmon rivers within Devon Area. The River Exe SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Exe salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain. At present there is no means of accurately assessing the River Exe salmon run. In common with many other rivers, estimation of stock using catch statistics and rod exploitation rate is the model used, when direct assessment is not possible. The installation of a fish counter on the lower river, or the use of other direct counting methods, would help to provide a direct assessment of the annual run of salmon into the river. This would improve our ability to estimate the spawning escapement and hence assess compliance with the Conservation Limit.
Resumo:
This is the River Exe Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Exe catchment has been produced after consideration of feedback from external consultation. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Exe salmon stock and fisheries. The River Exe salmon population is currently judged to be passing its Conservation Limit. However, its apparent declining trend in egg deposition in the recent years and the high uncertainty in its stock assessment suggest the following actions as priorities: actions promoting good land management, maximising salmon natural spawning activity and protecting smolts throughout the Exe catchment. Also, the lack of information on salmon stocks and its habitat quality and availability is recognised as the main factor limiting the better management of salmon fisheries. The actions presented in this document are perceived as those required to address the important issues and factors limiting the salmon stock.
Resumo:
This is the River Lyn Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Lyn Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Lyn Salmon Action Plan follows the format of those completed for the Rivers Exe, Axe, Avon & Erme, Teign, Torridge, Taw and Dart. It is the last of eight action plans that have been produced for salmon rivers within Devon Area. The River Lyn Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Lyn salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain.
Resumo:
This is the River Lyn Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Lyn catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lyn salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Lyn salmon stock and fisheries.
Resumo:
This is the River Taw Salmon Action Plan Consultation document produced by the Environment Agency in 2000. The report pays attention on the external consultation of the River Taw Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Taw Salmon Action Plan (SAP) includes a description of the current status of the rod and net fisheries and historical trends. The Taw salmon stock has declined since the 1960s and is currently failing to meet the spawning target. The decline in the spring fish component has accounted largely for the overall decrease in stocks. The reasons for the decline are unclear, but the spring fish problem is recognised as a national issue. The rate of survival over the marine phase has reduced in recent years for both the grilse and MSW components. This is undoubtedly a contributory factor, which may now constrain stocks to lower levels than have existed historically.
Resumo:
This is the River Taw Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Taw catchment has been produced after consideration of feedback from external consultation. The SAP provides a list of the issues and actions which were agreed for a five-year programme to maintain and improve the River Taw salmon stock. Some of these actions have already been delivered before finalising the SAP, but others have yet to be addressed. An attempt has been made to estimate the cost of the actions, identify possible sources of funding and the timescale under which they will be dealt with. The Taw salmon stock is currently failing to meet its spawning target. However, there was a period of compliance in the 1990s following a decade of failure through the 1980s. The freshwater environment of the Taw has improved in recent years. The actions presented in this SAP are perceived as those that are required to address, as far as possible, the important issues and factors currently limiting the salmon stock on the river. This SAP aims to promote long term collaboration between the Agency and other interested parties in managing the River Taw salmon stock and fisheries.
Resumo:
This is the River Teign Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Teign Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Teign Salmon Action Plan follows the format of those completed for the Rivers Torridge, Taw and Dart. It is the fourth of eight action plans that will be produced for salmon rivers within the Devon Area Fisheries, Recreation and Biodiversity Team. The River Teign SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Teign salmon stock is currently failing to meet its conservation limit. This failure is largely attributed to the reduction in the survival rate during the marine phase of the salmon life cycle. This is likely to constrain stocks to lower levels than have existed historically. Still further catch controls may contribute to a reduction in exploitation rates and allow stocks to recover to meet their conservation limit. Other important actions include the continuation of habitat improvement works which aim to maximise spawning habitat utilisation, spawning success, and juvenile survival and production.
Resumo:
This is the River Teign Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Teign catchment has been produced after consideration of feedback from external consultation. This final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the River Teign salmon stock. An attempt has been made to cost these actions, identify possible sources of funding, partners and the timescale under which they will be dealt with. It indicates how the plan will be managed, i.e., implemented and reviewed, and, summarises progress of on-going actions. The low marine survival (likely to be below 10%) is possibly the main cause for the River Teign salmon stock non-compliance with its conservation limit. Actions protecting smolts and maximising spawning activity of returning adults are seen as priorities to contribute to offset the low marine survival. This SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the River Teign salmon stock and fisheries.
Resumo:
This is the River Torridge Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Torridge catchment has been produced after consideration of feedback from external consultation. The SAP provides a list of the issues and actions which were agreed for a five-year programme to maintain and improve the River Torridge salmon stock. Some of these actions have already been delivered before finalising the SAP, but others have yet to be addressed. An attempt has been made to estimate the cost of the actions, identify possible sources of funding and the timescale under which they will be dealt with. The Torridge salmon stock has declined dramatically since the 1960s and is currently failing to meet the spawning target. The decline in the spring fish component has accounted largely for the overall decrease in stocks. The reasons for the decline are not fully understood, but the spring fish problem is recognised as a national issue. The rate of survival over the marine phase has reduced in recent years for both the grilse and multi-sea winter (MSW) components. This is undoubtedly a contributory factor, which may now constrain stocks to lower levels than have existed historically. Agricultural pollution is recognised as one of the main factors limiting freshwater production. This SAP aims to promote long term collaboration between the Agency and other interested parties in managing the River Torridge salmon stock and fisheries.