978 resultados para Masonry bridges.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Iowa Department of Transportation, Office of Contracts Letting Summary, July 1, 2008 - June 30, 2009
Resumo:
Twelve regularly scheduled lettings and nine emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $1,030,584,566 were approved.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
Persistent infection induces an adaptive immune response that is mediated by T and B lymphocytes. Upon triggering with an antigen, these cells become activated and turn into fast expanding cells able to efficiently defend the host. Lymphocyte activation is controlled by a complex composed of CARMA1, BCL10 and MALT1 which regulates the NF-KB signaling pathway upon antigen triggering. Abnormally high expression or activity of either one of these three proteins can favor the development of lymphomas, while genetic defects in the pathway are associated with immunodeficiency. MALT1 was identified as a paracaspase sharing homology with other cysteine proteases, namely caspases and metacaspases. In order to be active, caspases need to dimerize. Based on their sequence similarity with MALT1, we hypothesized that dimerization might also be a mechanism of activation employed by MALT1. To address this assumption, we performed a bioinformatics modelling based on the crystal structures of several caspases. Our model suggested that the MALT1 caspase-like domain can indeed form dimers. This finding was later confirmed by several published crystal structures of MALT1. In the dimer interface of our model, we noticed the presence of charged amino acids that could potentially form salt bridges and thereby hold both monomers together. Mutation of one of these residues, E549, into alanine completely blocked the catalytic activity of MALT1. Additionally, we provided evidence for a role of E549 in promoting the MALTl-dependent growth of cells derived from diffuse large B cell lymphoma (DLBCL) of the aggressive B cell-like type (ABC). To our initial surprise, the E549A mutation showed only a partial defect in dimerization, indicating that additional residues are essential to form a stable dimer. The MALT1 crystal structures revealed a key function for E549 in stabilizing the catalytic site of the protease via its interaction with an arginine which is located next to the catalytic active cysteine. In an additional study, we discovered that MALT1 monoubiquitination is required for the catalytic activity of the protease. Interestingly, we found that the MALT1 dimer interface mutant E549A could not be monoubiquitinated. Based on these findings, we suggest that correct formation of the dimer interface is a prerequisite for monoubiquitination. In a second project, we discovered a novel target of the protease MALT1, the ribonuclease Regnase¬la It was described that the RNase activity of Regnase-1 negatively regulates immune responses. We could show that in ABC DLBCL cell lines, Regnase-1 is not only cleaved by MALT1 but also phosphorylated, at least in part, by the inhibitor of KB kinase (IKK). Both regulations appear to restrain the RNase function of Regnase-1 and thereby allow the production of pro-survival proteins. In conclusion, our studies further highlight and explain the importance of the catalytic activity of MALT1 for the activation of lymphocytes and provide additional knowledge for the development of specific drugs targeting the catalytic activity of MALT1 for immunomodulation and treatment of lymphomas. SUMMARY IN FRENCH PhD Thesis Katrin Cabalzar 2 SUMMARY IN FRENCH Une infection persistante induit une réponse immunitaire adaptative par l'intermédiaire des lymphocytes T et B. Quand elles reconnaissent l'antigène, ces cellules sont activées et se multiplient très rapidement pour défendre efficacement l'hôte. L'activation des lymphocytes est transmise par un complexe composé de trois protéines, CARMA1, BCL10 et MALT1, qui régule la voie de signalisation NF-KB lorsque l'antigène est reconnu. L'expression ou l'activité anormalement élevée de l'une de ces trois protéines peut favoriser le développement de lymphomes, tandis que des défauts génétiques de cette voie de signalisation sont associés à l'immunodéficience. MALT1 a été identifiée comme étant une paracaspase qui partage des séquences homologues avec d'autres protéases à cystéine, comme les caspases et les métacaspases. Pour être actives, les caspases ont besoin de dimériser. Etant donné leur similarité de séquence avec MALT1, nous avons supposé que la dimérisation pouvait aussi être un mécanisme d'activation utilisé par MALT1. Pour vérifier cette hypothèse, nous avons conçu un modèle bioinformatique à partir des structures cristallographiques de plusieurs caspases. Et notre modèle a suggéré que le domaine catalytique de MALT1 était effectivement capable de former des dimères. Cette découverte a été confirmée plus tard par des publications qui montrent des structures cristallographiques dimériques de MALT1. Dans l'interface du dimère de notre modèle, nous avons remarqué la présence d'acides aminés chargés qui pouvaient former des liaisons ioniques et ainsi réunir les deux monomères. La mutation de l'un de ces résidus, E549, pour une alanine, a complètement inhibé l'activité catalytique de MALT1. De plus, nous avons mis en évidence un rôle d'E549 dans la croissance dépendante de MALT1, des cellules dérivées de lymphomes B diffus à grandes cellules (DLBCL) de sous-type cellules B actives (ABC). Dans un premier temps nous avons été surpris de constater que cette mutation révélait seulement un défaut partiel de dimérisation, ce qui indique que des acides aminés supplémentaires sont indispensables pour former un dimère stable. Les structures cristallographiques de MALT1 ont révélé un rôle primordial d'E549 dans la stabilisation du site catalytique de la protéase via son interaction avec une arginine qui se trouve à côté de la cystéine du site actif. Dans une autre étude, nous avons découvert que la monoubiquitination de MALT1 est requise pour l'activité catalytique de la protéase. A remarquer que nous avons trouvé que le mutant E549A de l'interface dimère de MALT1 n'a pas pu être monoubiquitiné. Sur la base de ces résultats, nous suggérons que la formation correcte de l'interface du dimère est une condition préalable pour la monoubiquitination. Dans un second projet, nous avons découvert une nouvelle cible de la protéase MALT1, la ribonucléase Regnase-1. Il a été décrit que l'activité RNase de Regnase-1 régulait négativement les réponses immunitaires. Nous avons pu montrer que dans les lignées cellulaires ABC DLBCL, la Regnase-1 n'était pas seulement clivée par MALT1 mais également phosphorylée, au moins en partie, par la kinase de l'inhibiteur de KB (IKK). Les deux régulations semblent supprimer la fonction RNase de Regnase-1 et permettre ainsi la stabilisation de certains ARN messagers et la production de protéines favorisant la survie. En conclusion, nos études mettent en évidence le rôle-clé de la dimérisation de MALT1 et expliquent l'importance de l'activité catalytique de MALT1 pour l'activation des lymphocytes. Ainsi, nos résultats apportent des connaissances supplémentaires pour le développement de médicaments spécifiques ciblant l'activité catalytique de MALT1, qui pourraient être utiles pour modifier les réponses immunitaires et traiter des lymphomes.
Resumo:
Arabidopsis thaliana contains two genes encoding farnesyl diphosphate (FPP) synthase (FPS), the prenyl diphoshate synthase that catalyzes the synthesis of FPP from isopentenyl diphosphate (IPP) and dimethylallyl diphosphate (DMAPP). In this study, we provide evidence that the two Arabidopsis short FPS isozymes FPS1S and FPS2 localize to the cytosol. Both enzymes were expressed in E. coli, purified and biochemically characterized. Despite FPS1S and FPS2 share more than 90% amino acid sequence identity, FPS2 was found to be more efficient as a catalyst, more sensitive to the inhibitory effect of NaCl, and more resistant to thermal inactivation than FPS1S. Homology modelling for FPS1S and FPS2 and analysis of the amino acid differences between the two enzymes revealed an increase in surface polarity and a greater capacity to form surface salt bridges of FPS2 compared to FPS1S. These factors most likely account for the enhanced thermostability of FPS2. Expression analysis of FPS::GUS genes in seeds showed that FPS1 and FPS2 display complementary patterns of expression particularly at late stages of seed development, which suggests that Arabidopsis seeds have two spatially segregated sources of FPP. Functional complementation studies of the Arabidopsis fps2 knockout mutant seed phenotypes demonstrated that under normal conditions FPS1S and FPS2 are functionally interchangeable. A putative role for FPS2 in maintaining seed germination capacity under adverse environmental conditions is discussed.
Resumo:
The Rebuild Iowa Infrastructure and Transportation Task Force is acutely aware of the critical role infrastructure plays in Iowa’s communities, the lives of the residents, and the economic well-being of the state. With encouragement to the Rebuild Iowa Advisory Commission (RIAC) for its consideration of great need for infrastructure and transportation repairs, the Task Force provides its assessment and recommendations. As the RIAC fulfills its obligations to guide the recovery and reconstruction in Iowa, infrastructure and transportation must be recognized for its impact on all Iowans. The tornadoes, storms, and floods were devastating to infrastructure and transportation systems across the state. The damage did not distinguish between privately-owned and public assets. The significance of the damage emerges further with the magnitude of the damage estimates. Infrastructure includes components that some might initially overlook, such as communication systems, landfills, and water treatment. The miles of damaged roads and bridges are more evident to many Iowans. Given the reliance on infrastructure systems, many repairs are already underway, though gaps have emerged in the funding for repairs to certain infrastructure systems. Supplement Information to the August 2008
Resumo:
Pursuant to section 34, subsection 1 of S.R. 376 passed by the 2010 session of the 83rd Iowa General Assembly, please find attached the report on the status of all bridge projects, completed or in progress, that were funded with the Bridge Safety Fund established by S.F. 376.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
The Iowa Transportation Commission (Commission) and the Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five Year Highway Program to inform Iowans of planned investments in our state’s primary highway system. This brochure summarizes the 2012-2016 Iowa Highway Program (Program) and provides information about long-term highway programming issues, through the year 2020. The Program is typically updated and approved each year in June.
Resumo:
Despite clear evidence of correlations between financial and medical statuses and decisions, most models treat financial and health-related choices separately. This article bridges this gap by proposing a tractable dynamic framework for the joint determination of optimal consumption, portfolio holdings, health investment, and health insurance. We solve for the optimal rules in closed form and capitalize on this tractability to gain a better understanding of the conditions under which separation between financial and health-related decisions is sensible, and of the pathways through which wealth and health determine allocations, welfare and other variables of interest such as expected longevity or the value of health. Furthermore we show that the model is consistent with the observed patterns of individual allocations and provide realistic estimates of the parameters that confirm the relevance of all the main characteristics of the model.
Design and Evaluation of a Single-Span Bridge Using Ultra- High Performance Concrete, September 2009
Resumo:
Research presented herein describes an application of a newly developed material called Ultra-High Performance Concrete (UHPC) to a single-span bridge. The two primary objectives of this research were to develop a shear design procedure for possible code adoption and to provide a performance evaluation to ensure the viability of the first UHPC bridge in the United States. Two other secondary objectives included defining of material properties and understanding of flexural behavior of a UHPC bridge girder. In order to obtain information in these areas, several tests were carried out including material testing, large-scale laboratory flexure testing, large-scale laboratory shear testing, large-scale laboratory flexure-shear testing, small-scale laboratory shear testing, and field testing of a UHPC bridge. Experimental and analytical results of the described tests are presented. Analytical models to understand the flexure and shear behavior of UHPC members were developed using iterative computer based procedures. Previous research is referenced explaining a simplified flexural design procedure and a simplified pure shear design procedure. This work describes a shear design procedure based on the Modified Compression Field Theory (MCFT) which can be used in the design of UHPC members. Conclusions are provided regarding the viability of the UHPC bridge and recommendations are made for future research.
Resumo:
Recent reports have indicated that 23.5 percent of the nation's highway bridges are structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges are on the Iowa county road system. The objective of the investigation described in this report was to identify, review and evaluate replacement bridges currently being used by various counties in Iowa and surrounding states. Iowa county engineers, county engineers in neighboring states as well as private manufacturers of bridge components, and regional precad prestressed concrete manufacturers were contacted to determine the most common replacement bridge types being used. Depending upon the findings of the review, possible improvements and/or new replacement bridge systems were to be proposed. A questionnaire was developed and sent to county engineers in Iowa and several counties in surrounding states. The results of the questionnaire showed that the most common replacement bridges in Iowa are the continuous concrete slab and prestressed concrete bridges. The primary reason these types are used is because of the availability of standard designs and because of their ease of maintenance. Counties seldom construct these types of bridges using their own labor forces, but instead contract the work. However, county forces are used to construct steel stringer, precast reinforced concrete and timber bridges. In general, 69 percent of the counties indicate an ability and willingness to use their own forces to design and construct relatively short span bridges (i.e., 40 A or less) provided the construction procedures are relatively simple. Several unique replacement bridge types used in Iowa that are constructed by county forces are documented and presented in this report. Sufficient details are provided to allow county engineers to determine if some of these bridges could be used to resolve some of their own replacement bridge problems. Where possible, cost information has also been provided. Each of these bridge types were evaluated for various criteria (e.g., cost effectiveness, conformance to AASI-ITO standards, range of sizes, etc.) by a panel of four Iowa county engineers; a summary of this critique is included. After evaluating the questionnaire responses from the counties and evaluating the various bridge replacement concepts currently in use, one new bridge replacement concept and one modification of a current Iowa county bridge replacement concept were developed. Both of these concepts would utilize county labor forces.
Resumo:
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.