981 resultados para Express highways


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Cooperative Research Centre for Construction Innovation1 (hereafter called Construction Innovation) supports the notion of the establishment of a Sustainability Charter for Australia and is interested in working collaboratively to achieve this outcome. A number of challenges need to be addressed to develop this Charter. This submission outlines these challenges and possible responses to them by a Sustainability Commission.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A ‘scoping study' has recently been undertaken to determine the ‘state-of-the-art’ of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.