968 resultados para Construction set
Resumo:
Industrialised building (IB) is considered by many to have an important role to play in China's residential construction industry due to its potential for improved quality, productivity, efficiency, safety and sustainability. It is surprising, therefore, that although a large number of construction programmes have been completed in the country in recent years, very few have been built in this manner. Quite why this situation exists is unknown. The well-known problems with IB, such as the constraints placed on designer freedom, may be the cause. It is equally possible that, as is typical with developing countries such as China, cost or government issues dominate. On the other hand, in comparison with other countries, the construction industry in China has been widely criticised for its lack of modernity. Either way, there is an urgent need to assess and understand the hindrances to the adoption of IB in residential construction in order to identify what corrective measures, if any, need to be taken. Towards this end, we first identify a set of critical factors (CFs) for assessing the hindrances to IB adoption in China. This involves the analysis of research data collected by a questionnaire survey of experienced housing developers and professionals working in China's construction industry sector. Fuzzy set theory is used in the selection of the CFs. These CFs comprise, in rank order: higher initial cost; lack of skilled labour in IB; manufacturing capability and involvement issues and product quality problems; lack of supply chain; lack of codes and standards; and lack of government incentives, directives and promotion. The establishment of the CFs provides a basis for local construction sectors to better equip themselves for future implementation of IB. The findings also indicate a current need for formulating improved policies and strategies to encourage the further development of IB in China at present.
Resumo:
The question as to whether poser race affects the happy categorization advantage, the faster categorization of happy than of negative emotional expressions, has been answered inconsistently. Hugenberg (2005) found the happy categorization advantage only for own race faces whereas faster categorization of angry expressions was evident for other race faces. Kubota and Ito (2007) found a happy categorization advantage for both own race and other race faces. These results have vastly different implications for understanding the influence of race cues on the processing of emotional expressions. The current study replicates the results of both prior studies and indicates that face type (computer-generated vs. photographic), presentation duration, and especially stimulus set size influence the happy categorization advantage as well as the moderating effect of poser race.
Resumo:
Australia is currently experiencing a resources boom and jobs in the male dominated fields of construction and engineering are at a premium. Employment in the construction industry, historically and today, is overwhelmingly male and, with an ageing population this predominately older male workforce will be retiring in greater numbers in the coming decade. Despite more that 25 years of anti- discrimination legislation and equal opportunity legislation these industries still employ few women in operational roles. This paper investigates the issue of the low representation of women in the construction industry. Our investigation involves the analysis of 95 organisation progress reports on the equal opportunity strategic programs in the construction industry. Findings indicate that this industry is not engaging with equal employment opportunity programs and further that equity outcomes for women in the industry are not evident.
Resumo:
Art activism uses visual and performance art to promote social and environmental agendas. In this paper, I explore attempts to raise awareness of sanitation issues at the global, local and personal level using scatological art. I focus on the successes of the open-air public art exhibition set up in the Brisbane (Queensland, Australia) central business district to celebrate World Toilet Day in 2008. The art in this exhibition featured included one hundred toilets decorated to raise awareness of global sanitation issues and the distribution of promotional materials featuring scatological images including postcards and stickers. Given the subject matter and intent, the toilet art and promotional materials presented at the One Hundred Toilet exhibition can be seen as an example of scatological art employed for the purposes of social and environmental activism. Through the One Hundred Toilet exhibition, I consider the political aims and activist potential of using scatological art to progress social and environmental agendas and consider how this kind of ‘shit on show’ approach can contribute to the construction of the shitting citizen; one who is simultaneously responsible for and responsive to managing the waste that they produce and recognising and responding to broader sanitation issues.
Resumo:
A graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Of dogs, fish, birds and turds : the social construction of sewage pollution by recreational boaters
Resumo:
Animals are often used as ‘evidence’ of marine pollution. Take for instance the ubiquitous images of miserable oil-soaked marine birds following high profile oil spills such as the Exxon Valdez, Pacific Adventurer and Deepwater Horizon incidents or the images of bloated floating fish carcasses which are used to signal the presence of toxic pollutants. In recent years waste discharges from vessels have come under increased public and regulatory scrutiny both in Australia and around the world. International, regional, national and local restrictions are becoming more stringent for high profile marine pollutants such as oil as well as previously overlooked vessel-sourced pollutants such as sewage. Drawing upon media reports and recreational boater responses to government attempts to regulate the discharge of sewage from recreational vessels, this paper considers the important role played by animals in constructions of marine pollution by sewage and attributions of blame for this pollution. Specifically, this study found that recreational boat owners disputed claims their sewage management practices posed an environmental threat arguing that the sewage discharged was readily and eagerly consumed by fish in the receiving environment. Boat owners also argued that increased levels of bacteria which indicate the presence of faeces within the marine environment could be directly attributed to the excrement of marine mammals and birds or were the result of dog faeces being washed through municipal storm water systems rather than the result of vessel discharges. By contrast the contamination of oysters was provided as evidence of sewage pollution by other stakeholders.
Resumo:
Construction contracts often provide that the decision of an independent certifier is final and binding. The effect of a contractual term like this has been debated in the courts over time. This paper considers the binding nature of certificates in the context of traditional construction contract arrangements and also considers the implications for more complex contracts like those entered into to facilitate public private partnerships. This article considers the response of the courts and the drafting implications and argues that a different focus would be advantageous.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.
Resumo:
Incorporating engineering concepts into middle school curriculum is seen as an effective way to improve students’ problem-solving skills. A selection of findings is reported from a science, technology, engineering and mathematics (STEM)-based unit in which students in the second year (grade 8) of a three-year longitudinal study explored engineering concepts and principles pertaining to the functioning of simple machines. The culminating activity, the focus of this paper, required the students to design, construct, test, and evaluate a trebuchet catapult. We consider findings from one of the schools, a co-educational school, where we traced the design process developments of four student groups from two classes. The students’ descriptions and explanations of the simple machines used in their catapult design are examined, together with how they rated various aspects of their engineering designs. Included in the findings are students’ understanding of how their simple machines were simulated by the resources supplied and how the machines interacted in forming a complex machine. An ability to link physical materials with abstract concepts and an awareness of design constraints on their constructions were apparent, although a desire to create a ‘‘perfect’’ catapult despite limitations in the physical materials rather than a prototype for testing concepts was evident. Feedback from teacher interviews added further insights into the students’ developments as well as the teachers’ professional learning. An evolving framework for introducing engineering education in the pre-secondary years is proposed.
Resumo:
Countless studies have stressed the importance of social identity, particularly its role in various organizational outcomes, yet questions remain as to how identities initially develop, shift and change based on the configuration of multiple, pluralistic relationships grounded in an organizational setting. The interactive model of social identity formation has been proposed recently to explain the internalization of shared norms and values – critical in identity formation – has not received empirical examination. We analyzed multiple sources of data from nine nuclear professionals over three years to understand the construction of social identity in new entrants entering an organization. Informed by our data analyses, we found support for the interactive model and that age and level of experience influenced whether they undertook an inductive or deductive route of the group norm and value internalization. This study represents an important contribution to the study of social identity and the process by which identities are formed, particularly under conditions of duress or significant organizational disruption.
Resumo:
The skill shortage issues have long existed in the construction industry in countries like Australia. Couple this with the lead and lag time between market demand and resultant supply has traditionally seen cyclical fluctuation of skills demand within the construction industry. Skills demand and shortages are generally well documented and can even have a level of predictability in Australia given the tendency to have a delayed reaction to global economic downturns. Sustainability issues in the construction industry have attracted growing public awareness. Traditionally driven by ever increasing, if only gradual, mandated minimum requirements, drive towards sustainable developments is now increasingly being created by the client. As this demand increases, accordingly a demand for people with the skills to provide these services should be felt. This research examines the green skill shortage issues within the context of construction industry. Stakeholders from across relevant sectors of the built environment were engaged to ascertain the industry’s utilisation and demand for ‘green skilled’ personnel. These findings will assist stakeholders within the construction industry in negating the effects of a skills shortage in the event of accelerated demand for sustainable construction.
Resumo:
Construction has been plagued with serious injuries and deaths for years. Although the technological advances have made the world safer and healthier, researchers have noted that some safety interventions, which had clear objective safety benefits, had failed to achieve the forecast savings in lives and injuries. The purpose of this study was to explore whether the construction workers show risk compensation and engage in greater risk taking when certain types of safety measures are implemented in the construction site. A case study approach was used to achieve the aim of this study. A typical construction site in Sydney was selected as the subject of the case study. Data were collected through direct observations, questionnaires and interviews. The findings confirm that workers show risk compensation behaviours in the construction environment. The risk compensation behaviours of workers varied with the level of experience and whether they have suffered from a past workplace injury. The findings of this study may offer a better understanding of workers’ behavioural patterns in construction environment and the effectiveness of safety interventions. The result of this study may provide supports for designing, implementing and evaluating safety interventions in construction site.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.